stiffness ring 中文意思是什麼

stiffness ring 解釋
剛性環
  • stiffness : 彈性剛度
  • ring : n 1 圈,環,輪;戒指,指環,耳環,鼻圈,鐲子(等);【運】吊環。2 輪狀物;【植物;植物學】年輪;...
  1. Thermoplastics pipes - determination of ring stiffness

    熱塑性塑料管材環剛度的測定
  2. These designing parameters include stiffness of epicyclical bearings, synthetic meshing stiffness of gears, stiffness of supporting bearing of out put shaft, mass of inner rack, meshing angle of gears, distance between inputting shaft and supporting shaft and input speed etc. according to these analyses, the possible way for improving the dynamic function of three - ring transmission may be put forward

    這些設計參數包括:行星軸承剛度、齒輪綜合嚙合剛度、輸出軸支承軸承剛度、內齒板質量、齒輪嚙合角、輸入軸和支承軸間距及輸入轉速等,根據這些分析,可以提出改善三環傳動動態性能的可能途徑。
  3. Thermoplastics. pipes. determination of ring stiffness

    熱塑.管道.環硬性測定
  4. The factors affecting the spatial effects of the deep foundation pit are researched in detail with the mutual deformation analysis method. these factors include the plane dimensions of pit, ring beam, middle beams, corner braces, embedded depth and brace stiffness. the results are compared with those of two - dimensional analysis, and their differences and adaptability are clarified

    此外,本文還利用共同變形分析方法,對影響深基坑空間效應的諸多因素(包括基坑的平面尺寸效應、圈樑和腰梁效應、角撐效應、樁身插入深度和支撐剛度等)進行了深入探討,並與目前常用的平面分析方法做了比較,指出了兩者的區別及其適用性。
  5. Abstract : this paper introduces the global stiffness, strength and stability of bracing structure with long span, pointing out that the control of bracing structure ' s deflection and elastic module can make the arch ring fit the line of pressure and arch axis and can guarantee the stability of bridge structure

    文摘:本文介紹了大跨度支撐結構的整體剛度、強度和穩定性,控制支撐的撓度和彈性變量可使拱圈符合設計壓力線與拱軸線,保證橋梁結構的穩定性。
  6. Iso 9969 : 1994 ; thermoplastics pipes - determination of ring stiffness iso 9969 : 1994 ; german version en iso 9969 : 1995

    熱塑塑料管.環壓挺度的測定
  7. By changing these parameters and the z - directional stiffness of the outer - ring, the stiffness and the damping characteristic of the damper can be varied

    在轉子系統支承中引入摩擦阻尼器能夠降低支承剛度,從而降低系統的臨界轉速,避開工作轉速。
  8. Plastics piping systems - glass - reinforced thermosetting plastics pipes - determination of the creep factor under wet conditions and calculation of the long - term specific ring stiffness

    塑料管道系統.玻璃增強的熱固性塑料管.潮濕條件下蠕變因數的測定和長期特定環狀物剛度的計算
  9. Plastics piping systems. glass - reinforced thermosetting plastics pipes. determination of the creep factor under wet conditions and calculation of the long - term specific ring stiffness

    塑料管道系統.玻璃纖維增強式熱固性塑料管件.潮濕條件下蠕變系數的測定和長期特定環勁度的計算
  10. The rigid ring strengthened stories may be set along the frame. so the relations between the tube and frame will be stronger. the overturn moment of the inner tube will be reduced by the axial stiff of circumjacent frame column, and the horizontal stiffness of the whole building will be enhanced

    在核心筒與外圍框架之間設置剛度較大的水平伸臂構件或必要時沿外圍框架設置剛度較大的周邊環帶加強層,可以加強內芯與周邊框架柱的聯系,充分利用周邊框架柱的軸向剛度而形成的反彎矩來減少內筒體的傾覆力矩,從而達到減少結構在水平和在以增強整個結構的抗側力剛度。
  11. Gfk. plastics piping systems - glass - reinforced thermosetting plastics pipes - determination of initial specific ring stiffness

    塑料管道系統.玻璃纖維的增強熱固塑料
  12. It is best that the stiffness ratio of ring beam to pile is 2 to 3. we think over burying depth of piles is 30 % of the whole length when ring beam existing. but it is necessary to decide according to the quality of soil layers and types of piles

    圈樑與樁的剛度比為2 3為最佳,有圈樑時樁的入土深度可以考慮占總樁長的30 ,但需要根據具體的土層性質和樁的類型斟酌而定。
  13. The low frequency noise of the ring - stiffened cylinder with double shell is depressed by increasing structure stiffness, the numerical simulation is adopted to evaluate the acoustics performance, find that the vibration and acoustic radiation of the structure could be depressed by increasing the structure stiffness within the discontinuous range of the low frequency

    摘要通過增大雙層加肋圓柱殼的剛度降低低頻噪聲,使用數值模擬技術,評價結構的聲學性能,發現增大雙層加肋圓柱殼結構剛度,可在低頻段有限頻率范圍降低結構的振動與聲輻射。
  14. The stiffness ratio of ring beam to pile affects the maximum value of moment near the bottom of excavated pit

    圈樑的抗彎剛度與樁的剛度比對樁身彎矩特別是坑底附近的最大彎矩值也有很大影響。
  15. Testing of glass fibre reinforced plastics pipes ; determination of initial and long - term ring stiffness

    玻璃纖維增強塑料管試驗.管子短時間和長時間最大壓力
  16. Plastics piping systems. glass - reinforced thermosetting plastics pipes. determination of initial specific ring stiffness

    塑料管道系統.玻璃纖維增強式熱固性塑料管件.初始特定勁度的測定
分享友人