stone dam 中文意思是什麼

stone dam 解釋
石壩
  • stone : n 斯通〈姓氏〉。n 1 石,石頭,鋪石,石料。2 寶石 (=precious stone)。3 石碑,界碑,里程碑,紀念...
  • dam : n 1 水閘,壩,堰。2 壩中的水。3 【礦物】坑道堰。4 (牙科用的)橡皮障。5 〈比喻〉障礙。vt 1 築水閘...
  1. Major landscape has highland pasture, " lover dam ", " girl mountain ", " mother tree ", 100 zhang echo wall, purple golden river cuckoo screen, stone forest, coloured mountain, drop water rock, pot stone and lead zinc metropolis etc., gross area ask 100 square kilometers

    主要景觀有高原牧場、 「情人壩」 、 「姑娘山」 、 「母親樹」 、百丈迴音壁、紫金河杜鵑屏、石林、花山、滴水巖、鍋石、鉛鋅都城等,總面積約100平方公里。
  2. So, apart from many historical relics and tourist attractions, such as the ghost city of fengdu, stone treasure block, zhang fei temple and white emperor city, the 6, 000 meter long dam area adds much lustre to chongqing

    長江三峽的大半段已出現在重慶市境內, 6000米的庫區名勝古跡,諸如豐都鬼城,石寶寨、張飛廟、白帝城,使重慶更添風采。
  3. Application of the dam with laid dry block stone casing

    棘洪灘圍壩干砌石護坡塌陷原因分析及處理
  4. The cement grouting applied in seepage control and stabilization of cement - rubble stone dam in jinjiang reservoir

    水泥灌漿在錦江水庫漿砌石壩防滲加固中的應用
  5. Application of stone basket check dam at gully regulation in mountain area

    石籠谷坊在山區溝壑治理中的應用
  6. The whole project comprised the building of the dam, a 2, 428 - yard tunnel driven through the wong nai chung gap valley and a 5, 500 - yard brick and stone aqueduct to connect the reservoir with the storage tank and filter beds at albany road. each day the volume of water being conveyed reached 7 million gallons. the 6 filter beds of the project were situated on the eastern side of the albany nullah ; measuring 3, 245 sq

    除水壩外,其他配套的工程包括: (一)一條長達2 , 428碼、貫穿黃泥涌峽谷的隧道; (二)一條長5 , 500碼的引水道,可連接水塘隧道的亞賓尼濾水池及配水庫,該引水道用石及磚砌成,每天可輸水700萬加侖; (三)位於亞賓尼水渠東部的六個過濾池,該濾水系統面積廣達3 , 245平方碼,深30尺,每天可過濾570萬加侖水,原水過濾后,經一條直徑18寸鐵水管,流入花園道與寶雲道交界的配水庫。
  7. The strange stone center in sanxia lies in with the dam of the world - - - the adjoining zigui county of the three gorges dam, is the birthplace of chu culture, is the homeland of world famous cultural talent qu yuan

    三峽奇石苑位於與世界之壩? ? ?三峽大壩毗鄰的秭歸縣,是楚文化的發源地,是世界文化名人屈原的故鄉。
  8. By drilling to weak position, the jet - grouting technique breaks through and mixes with soil and stone of dam foundation to form diaphragm - wall

    高壓噴射灌漿可由鉆機鉆孔至需處理的薄弱部位,通過高壓射流的沖擊攪拌,水泥漿在噴射范圍內與地層土石顆粒摻混攪合后形成防滲墻。
  9. It is an impotent part that plans and selects the place for sand & stone in the planning and the construction order of hydraulics and electric power project on base of concrete dam. material field choose and receive many kinds of restriction of terms is influence factor a lot of

    砂石料場的規劃選擇是混凝土壩為主體工程的水利水電工程施工組織設計中的重要環節,料場選擇受到多種條件的制約,影響因素很多。
  10. Analysis of the surrounding dam dry - laid stone slope revetment damage of a yellow river diversion reservoir at early period of water storing

    引黃平原水庫蓄水初期圍壩干砌石護坡破壞調查與原因分析
  11. Dam body stress computation and analysis of high stone masonry arch dam of jinggangchong reservoir

    井岡沖高砌石拱壩壩體應力計算分析
  12. The characteristic analysis of quantity variation of seepage on the stone masonry dam auxiliary dam of sheshang reservoir

    躍進水庫壩上游護坡破壞原因分析及加固措施
  13. Stone dam of kunming city

    昆明市小石壩
  14. Based on geological radar penetrating practice for soil and stone dam hidden dangers of reservoirs in northwestern loess areas and from the variations of the disturbance, pore ratios and water contents of the soil bodies in the percolation positions, the authors analyzed the variations of geological waveform characteristics and waveform phase axis continuation, and summed up the graph characteristics of the percolation hidden dangers in different periods

    摘要通過西北黃土地區水庫土石壩滲流隱患探地雷達探測實踐,從滲流部位的土體擾動、空隙比、含水量的變化入手,分析探地雷達波形特徵變化、波形同相軸連續性的變化,總結了滲流隱患不同時期的探地雷達圖像特徵。
  15. Based on the productive experiment on heihe dam site, during april to august 2002, site experiment was made on gongboxia hpp dam site, bjy - 40 extrusion curb placing machine was determined to be applied into gongboxia project, the batch ratio is : cement 80kg / m3, sand 651kg / m3, small stone 1449kg / m3, and sand ratio 31 %, w / c ratio 1. 31, admixture 3 %

    在生產性試驗的基礎上, 2002年4 8月,在公伯峽面板壩現場進行了擠壓邊墻施工各個環節的試驗,通過試驗,確定公伯峽面板壩使用陜工局西安理工大學工程項士學位論文水利機械廠研製的bjy 40型混凝土邊墻擠壓機進行固坡施工,其混凝土配合比為:水泥80kgb 』 ,砂651kgb3 ,小石1449kgb 』 ,砂率31 ,水灰比1
  16. Uses tong four foot cones to reinforce the yellow river dam shore root stone to suggest

    採用砼四腳錐體加固黃河壩岸根石的建議
分享友人