stream section 中文意思是什麼

stream section 解釋
河流橫斷面
  • stream : n 1 河流,小河;川,溪。2 流出,流注;一連串,(人物等的)輩出。3 (事件等的)連續;(財富等的)...
  • section : n 1 (外科、解剖的)切斷;切割;切開。2 【外科】切片,【金相】磨石。3 (果子的)瓣。4 【數學】截...
  1. A brief introduction is given to the treatment of the zeya dam foundation, principles of seepage control and design of the concrete face rockfill dam of the zeya reservoir. as for the excavation of the sand - gravel zones, except the toe slab and its 1 / 9 bottom width down stream, the alluvial layers are excavated to the micro - weathered rocks, while the other sections remain unexcavated. regarding to the treatment of the fracture zones, concrete filling is used for the toe slabs and semi - permeable materials are used for other section. according to the construction characteristics, a filter is placed in the down stream embankment foot. to improve the integrity of the dam foundation and anti - seepage capability consolidation grouting and curtain grouting are adopted. as a result safety, economic benefit, convenience in construction and good performace are achieved

    簡要論述澤雅水庫面板堆石壩壩基處理和防滲的原則及設計要點.趾板基礎和堆石體各區砂礫石基礎開挖,除趾板與其下游1 / 9底寬范圍以及壩腳挖除沖積層至弱風化(局部微風化)基巖外,其餘部分均予以保留.斷層破碎帶處理,趾板部位採用混凝土塞,其它部位採用半透水料置換,並根據本工程特點在下游壩腳加設了反濾層.為提高壩基的整體性和防滲性能,對趾板進行了固結和帷幕灌漿.達到了安全、經濟、便於施工的目的,運行情況良好,可為面板堆石壩的設計和研究提供參考與借鑒
  2. During a thirty - minute inspection over a 30 - metre stream section, only a small number of aquatic insect larvae and no fish were found in the stream

    當日本會職員用30分鐘視察約30米的河段,期間只發現小量水生昆蟲的幼蟲,未能發現魚類。
  3. There must be a marine casualty happened every 4 days before 1984, the amount of marine casualty happened at this area corresponds to 1 / 7 amount of the whole changjiang " marine casualty, so mariners gave it a name as " mouth of tiger ". due to the specific geographical condition and the extremely representative vessel traffic management of changjiang yingongzhou channel section, many intelligent people began researching and practicing the vessel traffic management of this changjiang " s down - stream complicated channel section from 1980s, at dec 15th 1984 the authority at that time - changjiang yingongzhou channel section previously ; up to the last years of 1980s ministry management administration applied traffic control on changjiang yingongzhou channel section previously, up to the last years of 1980s ministry of communications assigned shanghai marine college, shanghai ship & shipping research institute and changjiang harbor superintendence administration to make feasibility demonstrate about modern vts of zhenjiang traffic control section ; in 1990 dasha radar station which is the first radar vts station with inner river was finished, groped a new way for applying modern radar traffic control of vessel traffic management ; in 1997 the vtms of changjiang " s down - stream from nanjing to liuhekou was completed with connecting net and came into operation formally, meanwhile the signals of dasha radar station were conveyed to vts center by light cable, and then united applying vessel traffic management upon the whole authorized area ; in jun 2001 jiangsu msa made changjiang yingongzhou channel section as the first experimental group of creating " civilized, safe, passable channel activity, updating dasha radar antenna and receive - transmitter building closed - circuit television monitor system, setting uo safety warning board, starting navigational route reformation, carrying out united construction

    1984以前這里平均每四天就發生一起海損事故,事故數占整個長江的1 7 ,被行船人稱為「老虎口」 。長江尹公洲航段緣其極為特殊的地理區位條件和極具代表性的船舶交通管理,從上個世紀八十年代初就有識之士開始了這個長江下游最復雜航段的船舶交通管理探索和實踐。 1984年11月15日當時的長江航政管理局在長江尹公洲水域率先施行交通管制;到八十年代末交通部委託上海海運學院、上海船舶研究所和長江港監局聯合開展鎮江交通管制段建立現代化交管系統的可行性論證; 1990年大沙雷達站? ?內河第一座雷達交管站建成,摸索實施現代化雷達交管的船舶交通管理新途徑; 1997年長江下游南京至瀏河口船舶交通管理系統建成聯網投入正式運行,同時將大沙交管雷達信號通過光纜傳輸至交管中心,統一實施全轄區船舶交通管理; 2001年6月江蘇海事局將長江尹公洲航段作為第一批創建「文明平安暢通航段」活動試點航段,更新大沙雷達天線和收發機,著手閉路工業電視監控系統建設,設立安全警示牌,啟動航路改革,開展聯合「共建」 。
  4. Red leaf valley is a section of the balian stream famed for its unspoiled beauty. in fall, the leaves turn red - hence the name - making the valley resemble a classical japanese landscape

    行經石門,除了沿著海岸線前行,一睹大自然造景的神奇變化之外,不妨就驅車向山,來一趟恬靜的山林之旅,享受遠離塵囂的自在與舒適。
  5. In 2003, a 330 - metre section of tung chung stream was damaged by illegal excavation work by a sub - contractor supplying boulders to disneyland. after months of intense restoration effort the stream was back to life. however, the current threats facing by the stream may be even worst than the excavation incident

    2003年,其中一段330米長的河段遭向迪士尼供應石塊的副承建商非法採石工程破壞,經過多個月艱鉅的修復工程后才回復生氣,然而今次河流面對的威脅可能比挖石事件更為嚴重。
  6. Stream ordering and channel section node indexing based on dem

    基於數字高程模型的河道分級與節點編碼
  7. To reasonably plan out the scheme for the sewage discharge outlets of changshu fluorine chemical industry project, the article makes an ana lysis on the water environmental features of changshu section of the yangtze riv e, develops a plan two - dimensional model of coupled water flow - quality for its co mplicated underwater topography and stream flow - field. the model is relatively ac curate and practicable to predict the impact of scheme on water quality. varied s chemes have been compared and demonstrated from multiple angles, such as flow fie ld, impact assessment of water quality, technique and economy. the scheme of sewage discharge outlets away from the shore is recommended. the article provides a sci entific basis for the engineering design and envirommental management of the pro ject

    為合理確定常熟氟化工項目排污口布置方案,本文在分析長江常熱段水環境特徵的基礎上,針對其復雜的水下地形和水流流場,建立了較為準確和實用的平面二維水流水質耦合數學模型,預測計算了三套方案污水對重點保護水域影響程度和范圍,並從水流流場、水質影響評價、技術經濟多角度對方案進行了比較論證,最終推薦污水江中排放的方案,為項目的工程設計和環境管理提供了科學依據。
  8. Our site inspection near shek mum kap at the midstream section of the tung chung stream on 14 august 2006 revealed significant sediment runoff from upstream water. virtually no fish and insects were observed in the stream

    本會於2006年8月14日在鄰近東涌河中游段的石門甲進行實地考察時,發現大量沉積物從上游沖刷而下,本會職員更幾乎未能在該河段中找到魚類和昆蟲。
  9. The paper puts forward the structure of debris - retaining works system, layout consideration and construction principle for the coarse sand concentrated coming area, time sequence of the works construction of " large - scale first and small - scale second ", " downstream first and upper stream second ", and " carrying out section by section " and some problems demanding prompt solution according to the present facts and ; to speed up the preparation of a large - scale debris - retaining reservoir ; to draft the standards for a large - scale debris - retaining reservoir as quick as possible and ; lay emphasis on the schedule of various projects and correct understanding and fully playing the function of key dams through the analysis on achievements and problems of debris - retaining works building and combining with the gully characteristics of coarse sand concentrated coming area

    摘要通過對粗泥沙集中來源區攔沙工程建設成就與問題的分析,結合粗泥沙集中來源區溝道特徵,提出了粗泥沙集中來源區攔沙工程體系的構成、布局思路、建設原則,提出了「先大后小」 、 「先下後上」和「分段實施」的攔沙工程建設時序,並針對當前工作實際,提出了亟待解決的幾個問題:加快大型攔泥庫前期工作步伐、盡快制定大型攔泥庫標準、重視各類工程實施進度以及正確理解和執行規范、充分發揮骨幹壩的作用等。
  10. September 26, 2004 a section of tung chung stream damaged by illegal excavation work has had its natural charm returned after two months of intense restoration

    去年底遭非法挖掘的東涌河,經過兩個月的復修工程后,受破壞的河道已大致恢復原貌。
  11. Digital phase lock loop is used in this section to synchronize to an incoming serial data stream

    數據接收解碼模塊中使用了數字鎖相環技術從輸入數據碼流中提取出同步時鐘信號。
  12. An unpolluted brackish stream and the mangroves along the inter - tidal stream section, and

    未受污染的鹹淡水河流及沿潮間帶河段生長的紅樹林
  13. The theoretical model of dc electroosmotic flow field is built based on the forming principle of the pumping rate and pressure of electroosmoticflow micropump. the numerical values of electric double layer and electroosmoticflow field are solved by using vorticity stream funcion formulation and finity difference algorithm. it shows many factors influence the pumping rate such as electric field indensity, section area, section shape, the dielectric constant and the viscosity constant of flow

    本文詳細的綜述了直流電滲流微泵的國內外研究狀況,闡述了雙電層和直流電滲流微泵的原理,研究了電滲流微泵流量與壓強的產生機制,建立了直流電滲流流場的理論模型,並利用渦度流函數法和有限差分法得到雙電層電勢和電滲流流場數值解。
  14. An enquiry group comprising representatives of the environment, transport and works bureau and other relevant departments has been set up to oversee the reinstatement of the affected section of the stream, including examining the reinstatement proposal submitted by tcrc and monitoring the reinstatement works to be carried out. the target is to have the stream reinstated before the next rainy season

    由環境運輸及工務局及各有關部門組成的專責小組亦已成立,負責統籌東涌河受影響部份的復修工作,當中包括審閱由東涌鄉事委員會提交的修復建議書,以及對日後的實際修復工程加以監督,目標是在下個雨季來臨前完成河道修復的工作。
  15. This system is utilized the programmable controller ( plc ) bearing of substitution rule ( the figure is apparent the form, writing instrument, individual loop controller, the hand is holded the utensil and is reached to assist the bearing unit and await ), achieve the 29mw ' s cycle stream of water warmhearted water boiler, oxygen remover, warmhearted net system control system together with monitoring voluntarily of electric section together with control being living, the rule to call off greats quantity displays the bearing in that system, boiler, oxygen remover, the warmhearted net operation is achieved crt and is supervised completely, manipulates personnel staff is living inner place the control cabin completely completees failure - free operation and trouble removal operation. the predictive target of putting ino production queen is the boiler, oxygen remover, the warmhearted net is achieved comprehensive self - regulation, moreover be able to be over a long period of time, steady secure operation

    本系統利用可編程式控制制器( plc )替代常規的儀表(數顯表、記錄儀、單迴路控制器、手操器及輔助儀表裝置等) ,實現29mw循環流化床熱水鍋爐、除氧器、熱網系統控制系統與電氣部分的自動監測與控制。在該系統中取消大量的常規顯示儀表,鍋爐、除氧器、熱網的運行實現crt全面監控,操作人員在控制室內全部完成正常運行及事故處理操作。投產后的預期目標是鍋爐、除氧器、熱網實現全面自動調節,並能長期、穩定、安全運行。
  16. Ningmeng course of yellow river enters a country from ningxia center zhongwe county nan changtan, and in the zhungeer ma zhaxiang of inner mongolia leaves the country, and passes through 25 citys and the county, and the distance travelled by a stream of water 1203. 8km, deducts the section 239. 8km in gorge river and a reservoir area section 94. 5km, administers segment length 869. 5km in river

    黃河寧蒙河段從寧夏中衛縣南長灘入境,于內蒙古準格爾旗馬柵鄉出境,穿越25個市、縣(旗、區) ,流程1203 . 8km ,扣除峽谷河段239 . 8km 、庫區段94 . 5km ,治理河段長869 . 5km 。
  17. There is growing interest in china on the sport stars and olympic medal winners who bring glory to our country. qjy is therefore extremely excited about our appointment by china sports daily as the exclusive advertising agent for the special feature section. we expect to generate a satisfactory stream of advertising revenue from such rights

    在今日全國人民熱烈期待08年奧運來臨,並日益注重體育活動對為國增光之體壇名將與奧運金牌得主都有相當的愛戴與興趣的年代,中國體育報能同意把該專板專欄之獨家廣告代理權益交給勤緣,實在喜出望外,我們預期有關廣告收益會非常可觀。
  18. In the last section of this article, many correlations, including biasi correlation, sudo correlation, cise correlation, and 1995 look - up table, are compared with our experimental data. based on these results, evaluations on these correlations are provided, and because of lack of considering on up - stream memory effect, the correlations which mainly predict chf value based on local parameters, have considerable error

    針對目前文獻中存在的大量的chf經驗公式以及圖表,本文通過實驗數據與biasi公式, sudo公式, cise公式, groenveled的95look - uptable以及hewitt & kearsey關聯式計算值的對比,進行了對這些公式的評價,發現由於大部分的公式其臨界的判斷主要基於局部參數,沒有考慮到上游記憶效應,計算結果存在顯著誤差。
  19. In the course of implementation on hardware, sdram is adopted to design a reasonable and practical data manipulation scheme for mpeg - 4 data stream. the system minimizes the resource requirements while meeting a definite function target. besides, on the basis of study on rate control of tmn8, we also designed the section of rate control of this system in the way of both hardware and software

    通過對視頻編碼過程中數據流操作的分析,結合sdram的工作特點,合理設計了mpeg - 4編碼器的數據流調度方案,在滿足系統最高要求的基礎上,節省了寶貴的硬體資源,提高了程序的通用性;在分析了碼率控制的基本原理及演算法的基礎上,結合arm處理器的特點,設計了mpeg - 4編碼器碼流控制部分的硬體部分和軟體實現,實驗表明其起到了編碼結果調整的作用,效果良好。
  20. Stream cross section center

    憐截面中心
分享友人