successor task 中文意思是什麼

successor task 解釋
后續任務
  • successor : n 繼承人;繼任者,接班人;后繼者 (opp predecessor); 頂替者 (to)。 unworthy successors 不肖子...
  • task : n. 1. (派定的)工作,任務,功課。2. 艱苦的工作,苦差使。3. 〈廢語〉租稅,稅款。vt. 1. 派給工作。2. 虐待,使作苦工。3. 〈廢語〉課稅。
  1. Hanging the clocks is the successor task to painting the walls

    「懸掛鐘表」即為「粉刷墻壁」的后續任務。
  2. Which term describes a modification of a logical relationship that delays a successor task

    下列哪個名詞描述了導致下一項任務延遲的邏輯關系的改變?
  3. Starting a task as late as possible without delaying the project end date or the finish date of a successor task

    在不推遲項目或后續任務的完成日期前提下,盡可能晚地開始任務。
  4. Based on summarized and analyzed the existing problems of the solution for scheduling rtrpmt and tft, the author constructs a new heuristic function which adequately takes predecessor and successor relation among tasks into account, targeting that the direct successor of current running task is to be given the earliest time to be run

    針對實時分佈系統中大量的相關周期性多任務,在分析、總結了前人對此類任務的調度演算法解決方案所存在的問題基礎上,構造了一種新的啟發函數,該啟發函數充分考慮了任務之間的前驅、后繼關系,以當前任務的直接后繼具有最早開始執行時間為目標。
  5. Most likely, you ' ve linked many of your tasks with a finish - to - start ( fs ) link, so that the successor task does n ' t start until its predecessor task finishes

    很可能您已使用完成-開始( fs )關系鏈接了很多任務,因此後續任務要等其前置任務結束后才能開始。
  6. For example, if a task can start when its predecessor is half finished, you can specify a finish - to - start dependency with a lead time of 50 % for the successor task

    譬如,如果一個任務在其前置任務完成一半時可開始,則可以為其指定完成-開始相關性,且后續任務的前置重疊時間為50 % 。
  7. * * * but sometimes the work on a successor task can begin before its predecessor task is entirely finished

    但有時后續任務中的工作也可在其前置任務完全結束之前開始,也就是工作可以重疊。
  8. With lead time, you can overlap two tasks so that a successor task starts before the predecessor task finishes

    使用前置重疊時間可以將兩任務重疊,從而後續任務將在前置任務完成之前開始。
  9. 5. position the pointer over the gantt bar for the predecessor task and drag to the successor task in the other project

    5 .將指針指向甘特圖中某條形圖的前置任務,並拖動到另一項目的后續任務位置。
  10. By adding lead time, you cause the successor task to begin on an earlier date

    添加延隔時間后,后續任務將提前開始。
  11. The amount of time delay between the completion of one task and the start of its successor task

    從任務完成到其後續任務開始之間的延遲時間。
  12. 2. in the task name field, select the successor task you want, and then click task information

    2 。在「任務名稱」域中選取所需的后續任務,然後單擊「任務信息」 。
  13. A task that depends on the start or finish of a preceding task is called a successor task

    如果某一任務依賴於前置任務的開始日期或完成日期而定,則此任務稱為「后續任務」 。
  14. If the successor task is a critical task, adding lead time allows the project to end on an earlier date

    如果該后續任務是一項關鍵任務,則添加延隔時間將會使項目提前結束。
  15. When the total slack is negative, the duration for a task is too long for its successor to begin on the date required by its constraint

    當總時差為負值時,任務的工期過長,則不能按照條件要求的日期開始后續任務。