supporting wire 中文意思是什麼

supporting wire 解釋
吊線墜
  • supporting : adj. 1. 起支持[支撐]作用的。2. 協助[配合、支援]的;起配角作用的。3. 可提供證據的,證實的。
  • wire : n 1 金屬線,銅絲,鐵絲,鋼絲;【電學】導線;線路;金屬絲網;【造紙】抄網。2 電信;〈口語〉電報。3...
  1. ( 4 ) the instability problem of the columniation supporting was solved in the construction of side - span. ( 5 ) the circle - steel nip - patch anchor was applied for the thread - snap of the prestressed crude steel wire, the double facility anchor was used for deeling with the slip - wire of steel wring

    ( 4 )在邊跨直線段施工中,採用一端設立柱另一端吊掛在已合攏梁段上的梁式膺架,解決了支柱支承在古錯落體上的不穩定問題。
  2. Application of combine supporting of bolting with wire mesh and guy anchor in compound roof

    錨網加錨索聯合支護在復合頂板中的應用
  3. Secondly, calculation theory of construction for suspension bridge is presented under the ideal condition of dead load design. linetype change stiffness of cable and slip stiffness of supporting points are deduced based on segmental catenary theory. then numerical analysis method through sgkz2000 software are introduced in detail about calculating design linetype for suspension bridge, unstressed length of cable, erection linetype of cable and pre - displacement of saddle without loads, erection linetype of wire strands, the fixed position for erecting cable band and linetype of lifting stiffening girders

    其次,根據懸索橋恆載設計理想狀態建立了懸索橋施工計算原理;以分段懸鏈線索理論為基礎,推導了懸索的線形變化剛度和懸索支點的滑移剛度;介紹了懸索橋成橋設計線形計算、吊索無應力長度計算、空纜線形與預偏量計算、絲股架設線形計算、索夾安裝位置計算和加勁梁吊裝線形計算的具體方法、數值演算法及軟體sgkz2000的計算模塊的實現。
  4. In this paper, the three level fortification criterion, two stage design method and the elastic response spectrum theory are adopted, and the program of nba ( the program of nonlinear - aseismic analysis for beam bridge ) is used to calculate. through gathering, analyzing and calculating a lot of bridge design materials, this paper induces a simple way to calculate the relative displacement of the beam and the pier, and then according to the current design method, it concludes a better design principle of the supporting length of the beams. at the same time the dynamics is adopted to put forward the design method of the carrying capacity and the lengthen of prestress wire ( steel bar ) falling - off prevention structures of highway bridges

    本論文採用三水準設防、兩階段設計方法、彈性反應譜計算理論,運用橋梁結構非線性地震響應分析程序nba ( theprogramofnonlinear ? aseismicanalysisforbeambridge )進行計算;通過收集大量的實橋設計資料,經分析計算,歸納總結出計算上下部結構相對位移的簡便計算方法;並綜合國內外的經驗值,提出梁的支承長度se的設計原則;同時運用動力學突加荷載的原理,推導分析了預應力鋼絞線式(鋼棒連接式)落梁防止裝置設計承載力的計算方法和設計伸長量s _ f的取值;最後本文通過實橋計算,說明了落梁防止系統設計的方法。
  5. Technique of combined supporting of roof bolting with bar and wire mesh in coal roadway

    煤巷錨梁網組合支護技術的研究與應用
  6. Bolt with bar and wire mesh cable supporting in driving gob - side entry along water - immersed pillar

    水浸煤柱沿空掘巷的錨梁網索支護
  7. Type nhss wire rope pulling hoist is widely suitable for use in bridge - construction, laying of large - size pipes, installation and adjusting of machinery an electric apparatus, and large reaction tower of petrochemical industry ; the installation and alignment of storage tanks ; erecting, fitting, welding and alignment of masts, steel concrete timber structures ; laying and translocating of rails and sleepers ; loading and unloading bulky heavy goods during transportation. cable tensioning ; demolishing of gallery supporting logs ; stacking forrestry wood ; and othersimilar cases. the hoist of this series is especially suitable for use in narrow working sites of limited space, where the job is high above the ground or in open air places, in tunnel of deep well, where no power for traction or lifting is available

    Nhss型鋼絲繩手扳葫蘆可廣泛用於建築施工、大型管道鋪設、機電設備和石油化工大型反應塔、儲罐的安裝、校準、鐵塔及其它鋼木結構的豎立、拼裝焊接、校準、鐵軌、枕木的鋪設、移位、交通運輸中笨重貨物的裝卸、電線張緊、坑道支撐木的拆除、林區木材的集放等等,對于局部空間受到限制的狹窄工作場所、高空作業、野外作業、坑道、深井作業和無機電供能場所的各種牽引、提升作業、選用本系列產品尤為適宜。
  8. Application of bolting with wire pillar supporting technology in driving along gob - side entry

    錨笆柱支護技術在沿空掘巷中的應用
  9. Probe and practice of supporting technology with shotcrete and bolting wire mesh for large - section coal roadways in soft seams between soft roof and soft floor

    三軟煤層大斷面巷道錨網支護技術探索與實踐
  10. Combining the code for technique of building foundation pit engineering, the combination supporting scheme of prestressed anchor wire and anchor arm for a deep foundation ditch in guiyang city is introduced

    摘要結合現有的基坑土釘支護設計規范,通過合理分析計算,介紹了貴陽某綜合樓基坑支護中預應力錨索錨桿聯合支護方案。
  11. It provides steady lifting with low noise, and is equipped with lifting brackets, anti - fall supporting protection, stopping protection against wire fracture, limiting device for maximum load, control device for maximum lifting height and fixing device for the turning angle of the bracket arm

    升降平穩、噪音低,並設有舉升托架、防跌落支承保險、鋼索斷裂制動保險;最大負荷限定裝置和托臂回轉角度鎖定裝置。
  12. It is found that the rational located destressing boreholes can induce structural failure of the surrounding rock - mass, consequently the high stress move deeply in the rock - mass, and the stress environment in the surrounding rock is ameliorated, the spatio - temporal order of the destruction of the surrounding rock - mass is changed when the destressing boreholes and bolting net with wire mesh composite support are accomplished, therefore the compound supporting technology has prominent advantage for control the deformation and destruction of the surrounding rock

    模擬發現:合理布置的卸壓孔可以導致巷幫圍巖的結構性預裂破壞,從而使圍巖高應力向深部轉移;在卸壓孔和錨網聯合支護后改善了圍巖附近的應力環境,改變了圍巖破壞的時空次序,對控制圍巖變形和破壞具有突出的優越性。
  13. Bolting with strip and wire mesh supporting in deep and composite roof roadway

    深部巷道復合頂板錨帶網支護技術
分享友人