task start 中文意思是什麼

task start 解釋
次作業開始
  • task : n. 1. (派定的)工作,任務,功課。2. 艱苦的工作,苦差使。3. 〈廢語〉租稅,稅款。vt. 1. 派給工作。2. 虐待,使作苦工。3. 〈廢語〉課稅。
  • start : vi 1 〈美國〉出發,動身,起程。2 (機器)開動;開始,著手,下手,發生。3 突然出現,湧出;鼓出,突...
  1. A finish - to - start task dependency is created

    這樣就創建了一個結束-開始鏈接。
  2. You can incur costs at the start or finish of a task or prorate them during the task

    您可以在任務的開始時間或結束時間支付成本,也可以在任務過程中按比例分攤。
  3. As the most elite troops of a special forces. you want and land base to accomplish the most difficult task go start point games for the next around move around, the left mouse button shooting

    作為部隊最精銳的特種兵的一員,你要潛入敵方的基地來完成最艱巨的任務點go開始游戲, wasd為上下左右移動,鼠標左鍵射擊。
  4. Introduction : as the most elite troops of a special forces. you want and land base to accomplish the most difficult task go start point games for the next around move around, the left mouse button shooting

    作為部隊最精銳的特種兵的一員,你要潛入敵方的基地來完成最艱巨的任務點go開始游戲, wasd為上下左右移動,鼠標左鍵射擊。
  5. When god calls us to a task and to a responsibility to do something, to be the best father we can be, to be the best mother we can be, to be the best friend, the best neighbor, the best new hope counselor, all of these thoughts start to run through our minds, " but oh what if somebody says this and says that and how can i have the ability to do this and do that ?

    當神呼召我們承擔一項工作,負起一個責任,完成一件事,盡力作個好爸爸,盡力作個好媽媽,作個最好的朋友,最好的鄰居,最好的新希望輔導員這一切思想開始進入我們的心,但若有人說這說那:我怎麼有能力做這做那?
  6. 3. drag the task bar to the right to split the task and have a portion of it start later.

    3 .向右拖動任務條形圖來拆分任務,並使其中一部分拖后開始。
  7. When taking up the case, the task force was aware that a number of suspects had already left malaysia, so they made an early start in preparing the relevant documents

    專案小組甫接手案件,已得悉幾名涉嫌人士均離開了馬來西亞,所以很早便開始準備有關文件。
  8. Or, if the electrician can begin wiring display cases after half the cases are installed, the " install and position case lights " task can start when the " install wood and glass cases " task is 50 percent complete, regardless of the duration of the predecessor task.

    或者,如果電器工程師可以在燈具裝好一半的時候開始鋪設線路,則任務「燈具通電」在任務「安裝燈具」完成了50 %的時候開始,而不必考慮前置任務工期的長短。
  9. To enable microsoft project to start each task at its proper time, you need to link the tasks to each other, based on their start and finish dependencies

    要使microsoftproject在恰當的時間啟動每一個任務,就必須根據任務開始和結束的相關性對任務進行相互鏈接。
  10. The algorithm tries to schedule each task node at its earliest start time to obtain good performance of the whole task

    演算法力求保證每個節點的最早開始時間,通過這種調度方式獲得整個任務的優化調度結果。
  11. With the signing of the agreement, the cuhk - hkied task force on deep collaboration, spearheaded by a vice - presidential level group, will start to draw up mid - to long - term strategies and plans

    協議簽署后,由兩校的副校長共同領導的中大與教院深入協作專責小組將會開展有關兩校深入協作的中期至長期策略及規劃工作。
  12. If you want microsoft project to automatically recalculate a constrained task ' s start and finish dates when the schedule changes, you can choose to have schedule changes override constraint dates

    如果希望在日程更改時, microsoftproject能自動重新計算受限制任務的開始日期和完成日期,則可以讓日程更改忽略限制日期。
  13. 5. if you selected a constraint other than as late as possible or as soon as possible, click a constraint date in the date box. ( otherwise, microsoft project uses the task ' s current start or finish date. )

    5 。如果選定的限制類型不是「越晚越好」或「越早越好」 ,請在「限制日期」框中選擇一個限制日期(否則, microsoftproject將使用任務當前的開始日期或結束日期) 。
  14. To start a task, set its thread priority level, and so on

    定義的方法以便進行以下操作:啟動任務;設置其線程優先級別;設置相應于當前
  15. For example, a clockwork exhibit crew will hang the clocks only after painting the walls. the task of hanging clocks is linked to the task of painting walls, because the start date for hanging clocks can occur only after the finish date for painting walls

    譬如:鐘表裝置展覽會的工作人員只有在粉刷墻壁之後才能懸掛鐘表, 「懸掛鐘表」的任務必須與「粉刷墻壁」的任務相鏈接,因為「懸掛鐘表」的開始日期只能發生在「粉刷墻壁」的完成日期之後。
  16. This task could basically start after completion of the incremental delivery planning stage, so execution will be parallel with the incremental design and build stage

    這工作項目基本上能在遞增交付規劃階段完成後便展開,使其可與遞增設計和建設的階段同時進行。
  17. A schedule of task start and finish dates and resource and cost information

    任務的開始日期和完成日期的日程,以及資源和成本的信息。
  18. You may want to create a leading split to see the original task start date, indicated by the left edge of the gap, and the actual start date, indicated by the left edge of the task bar

    您也許希望創建一個前置拆分查看任務初始的開始日期和實際開始日期。
  19. It can include key information such as task start and finish dates, resource assignments, and costs

    其中包含任務開始日期和完成日期、資源分配及成本的關鍵信息。
  20. As your project progresses, task start and finish dates may slip, resource assignments may change, and so on

    在項目實施過程中,任務的開始日期和完成日期可能會有變化,資源的分配也可能會改變等等。
分享友人