test fill 中文意思是什麼

test fill 解釋
碾壓試驗
  • test : n 1 檢驗,檢查;考查;測驗;考試;考驗。2 檢驗用品;試金石;【化學】試藥;(判斷的)標準。3 【化...
  • fill : vt 1 注滿,裝滿,裝填,填充。2 (風)張滿(帆),使(帆背)受風。3 充滿,充實(知識等);普及。4 ...
  1. Research on indoor scale - down test of dredger fill

    吹填土室內模擬試驗研究
  2. These character based on sichuan power network ' s practice operation experience, in allusion to the config of the carrier wave protection in bypass breaker operating, through the study of protection ' s typical config : one side lfp - 902a, one side csl - 101a, proceeded comprehensive act module test, noted plenty of first hand test data and wave picture, proceeded detailed theory analyses, plenitude demonstration atresic type carrier wave distance protection when twain side atresic type logic is not completely same, basically can fill power network ' s requirement to relay of reliability selectivity speedly and sensitively

    本文結合四川電網的實際運行經驗,針對旁路開關代路運行時的保護配置情況,通過對旁路代路時保護典型配對組合:一側lfp - 902a ,一側csl - 101a的保護配置情況的深入研究,做了全面的動模試驗,記錄了大量的第一手試驗數據和波形,進行了詳細的原理分析,充分驗證了高頻閉鎖式距離零序保護在兩側閉鎖式邏輯不盡一致的情況下,基本能夠滿足電網對繼電保護的可靠性、選擇性、快速性以及靈敏性的要求。
  3. Based on the theory of unsaturated soil mechanics and the properties of compacted expansive soil, this paper takes the northern part k12 + 840 - k12 + 920 of nanning urban highway as an example to studies some aspects of lime improvement of expansive soil and the technology of construction. the chief content of this paper is : the lime improvement mechanism of expansive soil ; confirm the technical parameters of lime mixed from the results of test in laboratory ; the scale - down test to define the maximum effective grain size of expansive soil when it is improved by lime ; by building bank slope model and making use of finite element seepage flow program of saturated - unsaturated to calculate the examples, this paper simulates the humidity site in order to checkout the effect of lime improvement ; studies and proves that it is feasible to mix blocky expansive soil and pulverous lime, and to fill roadbed by common construction machines etc.

    本文研究的工作就下述幾個方面展開:用石灰改良膨脹土的機理;通過室內試驗確定摻灰的技術指標;在室內進行膨脹土摻灰的最大有效粒徑的模擬試驗,即鈣離子水試驗,由此總結出「粉?塊」灰?土攪拌工藝的有效性、合理性和可行性;用數值方法對路堤使用期的濕度場進行模擬,並與路堤的強度?變形的計算域耦合,以檢驗土性改良的效果,從而探索一種描述改良膨脹土路堤運行工況的數值方法;用現有最常用的且費用最低的施工機具,對灰?土進行「粉?塊」攪拌摻和及路基的填築施工等。
  4. E. g. you do it at a low resolution, and let real wet lab experiments fill in or test for the details of the best fit

    例如,你用不是很精確的方式計算,然後讓真實的實驗室來細化或者來驗證最佳符合藥物的細節。
  5. This paper conbined with the indoor test and the scene test road, through the synthetical analysis of the factors of influencing densification effect for the densification thickness of filling stone roadbed. the maximum grain size of fill material, densification machinery and densification frequency et al. advanced a control norm of the maximum grain size and piy of compression, established ration evaluating the control standard of densification quality of filling stone roadbed under overload. comparing with result of indoor test and the scene test road, studied on theory of densification in different kinds of stone material and perfected the control system of the densification of filling stone roadbed under overload

    結合室內試驗和現場試驗路的實測數據,通過對填石路基的壓實厚度,填料最大粒徑,壓實機械及壓實遍數等影響壓實效果的因素的綜合分析,提出填石路基的最大粒徑和攤鋪厚度的控制指標,建立定量評定超重載交通下填石路基壓實質量的控制標準,並對照室內試驗和現場試驗結果,研究不同石料條件下的壓實理論,補充完善了填石路基壓實控制指標體系。
  6. Test and research on asphalt concrete core of rock fill dam

    瀝青混凝土防滲墻施工技術
  7. Gaining the maximum dry density of fill by compacting test

    碾壓試驗確定回填料最大幹密度
  8. 6 shipyard sort out the relevant record and fill in test report after anchor equipments and windlass test. and signed by shipyard / classification society / shipowner

    每個錨鏈的標記和鏈尾固定情況應在安裝前進行檢查,棄鏈器設備的檢驗應在錨脫勾時進行。錨鏈全部收好后檢查鏈在錨鏈艙的堆放情況是否完好。
  9. Please read the test service clauses on the back carefully before you fill in this contract

    在填寫本委託書前,務必仔細閱讀背面的「檢測服務約定條款」 。
  10. With the retrospection of the developing course of the bored pile foundation and combining with my practical experience, the paper expatiates upon the design principle of percent of fit of the stone - fill grouted concrete and the main factors of the influence strength target, and the final pile technique introduction of the hollow pile of the stone - fill grouted concrete and the precast prestressed concrete ; baesd on the theory of slurry hydraulics, empirical calculation formulas of the radis and height of diffuse slurry are deduced in this paper ; it analyzes the test pile materials of the hollow pile foundation, such as luoyang yi river bridge and dangwang jian river bridge ; the new technique of the hollow pile, which provides the generalization and application with base materials, expounds its feasibilities, adaptabilities and economy

    本文通過綜合分析國內外鉆孔樁基礎的發展歷程及研究現狀,重點討論了填石壓漿混凝土空心樁、預制預應力混凝土空心樁的成樁工藝、填石壓漿混凝土的配合比設計原理及影響強度指標的主要因素;根據泥漿水力學原理,導得了考慮各種因素的水泥漿液在預填骨料中的流動影響半徑和上升高度;結合河南省洛陽伊河大橋、黨灣澗河大橋工程實踐,討論了填石壓漿混凝土空心樁基礎的質量檢測方法及標準;並在此基礎上,深入分析了樁側、樁端承載能力,提出了填石壓漿混凝土空心樁的設計計算理論和方法。最後,論證了空心樁新工藝的可行性、適應性、經濟性,為大力推廣應用空心樁新技術提供了可靠的技術資料。
  11. Test and study on the influence of operational water level of sanmenxia reservoir to scour and fill of the reservoir area

    三門峽水庫運用水位對庫區沖淤影響試驗研究
  12. " field observation of high rock - fill dams and feedback data analysis " and " dynamic analysis of high earth and rock - fill dams and aseismatic measures ", the concepts and methods obtained in the above two consulting items were creative and evaluated by the ministry of electric power as being of international level. the research findings were adopted in such large - scale projects as the tianshengqiao water contral project, ming tombs water control project. dahe water contral project, ming tombs water control project, dahe water control project and lianhua water control project and awarded the second prize of scientific and technical advancement of the ministry of electric power. ( 2 ) the research on the stress - strain correlation of dam construction materials was awarded the second prize of scientific and technical advancement of the ministry of electric power. ( 3 ) the result of the field observation test and computational analysis for the tailing dam improvement project of xuzhou power plant was adopted by the east - china design institute of electric engineering with considerable economic benefit. ( 4 ) the result of the geotechnical test and data analysis of wenfu mine project was applied in the project with considerable economic benefit. ( 5 ) the field observation and data analysis of the kezier reservoir project provided a solid base for ensuring the normal operation and management of the reservoir

    「高堆石壩原位觀測和反潰分析研究」及「高土石壩動力分析及抗震工程措施研究」咨詢項目提出了具有開拓性的觀點與方法,經電力工業部鑒定評為國際先進水平,該兩項成果已應用於天生橋、十三陵、大河、蓮花等大型工程獲電力工業部科技進步二等獎; 「壩料土動力應力應變關系的研究」咨詢項目獲電力工業部科技進步二等獎, 「徐州發電廠灰壩加固工程勘測試驗與計算分析」咨詢成果已被華東電力設計院設計采納,工程效益顯著; 「甕福磷石膏渣場工程土工試驗與數值分析」咨詢成果已應用於國家重點工程甕福礦肥基地建設,效益顯著; 「克孜爾水庫工程原型觀測數據庫與資料分析」咨詢項目為水庫運行與管理提供了有力保證。
  13. Install sight tube in test cock 4 and fill with water as before

    在測試旋塞4號安裝觀察管,並如前所述注水。
  14. Your reservation will be cancelled if you do not fill out the gre online registration form within 7 days after you have successfully reserved a seat at a center, even if you paid for the test

    在成功預定座位后7日內未提交gre報名表的考生,將被取消預定的座位,盡管您已經交費。
  15. Open test cock 3 and allow water to fill the tube to the top

    開啟測試旋塞3號,使得水注到管子的頂部。
  16. The research findings solved the difficult problem of project, the test is first to study xigeda strata use to roadbed carrier, nearly millions xigeda strata can use in build, save investment and reduce occupation land, accelerate build speed, fill - up void that the xigeda strata use expressway filling material

    仁述成果解決j一工程急需的問題,沿線近百力方的昔格達挖方可直接應用於西攀高速公路建設,同時也可以填補著名的易滑地層?昔格達地層用於高速公路路堤的空白,它可以節省投資,少佔農業用地,加快工程建設,對于西攀高速公路的早日建成具有重要意義。
  17. Based on the roller - compacted test, check on construction and observation during operation, the fill - criteria of the design for the dam is obtained, and then the economic and reasonable roller compacted method, including selection of the roller, mechanical parameters, watering amount for material of sandy gravel etc., is determined as well

    摘要通過碾壓試驗、施工復核及大壩運行觀測,得到了大壩的設計填築標準,從而確定了經濟合理的壓實方法,包括壓實機械選型、機械參數、砂礫料加水量等。
  18. Along with " element education " development, inspecting function of fill - in - the - blanks test / exercise gains more excavating, it not only increases the effect of inspecting memory capability, but it can inspect comprehensive and application capability which had been regarded as the impossible thing

    隨著「應試教育」向「素質教育」的轉變,填空題的考查功能得到進一步挖掘,不僅提高了原有的考查記憶水平的效度,而且能夠考查曾被認為不可能的較高層次的理解和應用能力。
  19. In the end of the thesis i give the general comment about fill - in - the - blanks test / exercise and put forward some unsolved questions related to the study

    論文第五部分探討了填空題命題技術之二? ?調整技術。論文第六部分提出填空題進一步研究的方向。
  20. Open upstream slowly, fill the valve and bleed the air through test cock 2, 3 and 4

    慢慢開啟上游,注滿閥門,通過測試旋塞2 , 3和4號排放空氣。
分享友人