test methods and procedure 中文意思是什麼

test methods and procedure 解釋
測試方法和程序
  • test : n 1 檢驗,檢查;考查;測驗;考試;考驗。2 檢驗用品;試金石;【化學】試藥;(判斷的)標準。3 【化...
  • methods : (方法):是指定給對象的函數。在函數被指定給對象之後,該函數就可以被稱為是該對象的方法。
  • and : n. 1. 附加條件。2. 〈常 pl. 〉附加細節。
  • procedure : n. 1. 工序,過程,步驟。2. 程序,手續;方法;訴訟程序;(議會的)議事程序。3. 行為,行動,傳統的做法;(外交、軍隊等的)禮儀,禮節。4. 〈罕用語〉進行。
  1. Air quality - determination of the pm10 fraction of suspended particulate matter - reference method and field test procedure to demonstrate reference equivalence of measurement methods

    空氣質量.懸浮顆粒pm10系數測定.驗證測量方法基準等效值證用參照法和野外檢驗法
  2. Air quality - determination of the pm10 fraction of suspended particulate matter - reference method and field test procedure to demonstrate reference equivalence of measurement methods ; german version en 12341 : 1998

    空氣質量.懸浮顆粒物中pm10系數的測定.驗證測量方法
  3. Air quality. determination of the pm10 fraction of suspended particulate matter. reference method and field test procedure to demonstrate reference equivalence of measurement methods

    空氣質量.懸浮顆粒物的pm10分數的測定.驗證測量方法參考等效值的參考方法和現場試驗過程
  4. Fire hazard testing - test methods - glowing hot - wire based test methods - glow - wire apparatus and common test procedure

    著火試驗.灼熱金屬線熱線試驗方法.灼熱金屬線儀器和通用試驗方法
  5. New and consistent competition advantages all result from custom ' s satisfactory and changing innovations. a thorough procedural reproduction contains three phrases. first of all, by market researching, inter - communication and other methods, we need to find problems and begin to rearrange all procedures ; secondly, by reorganizing the management procedure of valued customers, the structure of luzhou telecom corp., front and back sla service protocol and kpi performance evaluation items, it support, we can correct problems after segmental test

    一個完整的流程再造工作包括三個階段:第一,通過市場調研、內部訪談等對所有流程進行梳理,找出問題,確定重點優化流程;第二,設計瀘州電信新的大客戶管理流程和組織結構、前後端sla服務水平協議和kpi績效考核指標、 it支撐,通過局部試用,發現問題,重新調整;第三,設計計費與賬務處理流程、網路資源調配流程、滾動性網路投資流程、 it支撐,內部推廣,全面推進企業的流程再造工作。
  6. Assembly tools for screws and nuts - hand torque tools - requirements and test methods for design conformance testing, quality conformance testing and recalibration procedure

    螺釘和螺母用裝配工具.手動扭具.設計合格檢驗質量合格檢驗和再校準程序的要求和試驗方法
  7. The detection methods, load procedure and selecting the sample of material, etc. all be done by the request of the " test on the building structure " strictly

    本試驗的檢測方法、加載程序以及試件材料的取樣等工作都嚴格按照《建築結構試驗》 2的要求進行。
  8. Based on consulting a large number of documents, the paper firstly analyses and generalizes all aspects of the creep tests, including test equipments, test methods, test procedure, test influencing factors ; so as to complete the creep tests successfully

    在查閱大量文獻資料的基礎上,先介紹了蠕變試驗方面所涉及到的試驗儀器、試驗加載方式、試驗破壞標準及試驗步驟,同時分析了影響蠕變試驗結果的因素,明確這些有助於順利地開展蠕變試驗。
  9. Fire hazard testing - part 2 - 10 : glowing hot - wire based test methods ; glow - wire apparatus and common test procedure

    著火危險試驗.第2 - 10部分:灼熱金屬線熱線的試驗方法.灼熱金屬線儀器和通用試驗方法
  10. The main contents of this thesis include : ( 1 ) summarize and analysis of the theories on vibration transmission through rolling element bearings ( 2 ) based on the threshold setting and signal ’ s statistical approach, a method for solving the problems of denoise was developed ( 3 ) using sparsity and clustering, the method and hypotheses for underdetermined blind source separation was studied ( 4 ) the method based on potential function clustering was given for underdetermined blind source separation of noisy signals based on the assumption that the input distribution is sparse and the mixture procedure is linear, the attenuation matrix and the delay matrix were estimated by clustering. the approach was experimentally illustrated for the case of m = 2. the separation of the signals from bearing test bed proved that the given methods are available and reliable

    在需求分析和研究現狀分析的基礎上,本論文針對如下內容進行了重點研究: ( 1 )以滾動軸承為例,對旋轉機械振動信號的傳輸進行了歸納分析; ( 2 )通過設定某一門限並研究信號間的統計特性,研究了旋轉機械振動信號的盲源分離過程中噪聲消減策略; ( 3 )應用稀疏信號分析和聚類分析方法,對盲源分離中欠確定問題的假設條件進行探討並對分離方法進行了分析; ( 4 )採用基於勢函數聚類分析的方法,研究了欠確定前提下含噪聲測量過程中信號盲源分離方法。
  11. Assembly tools for screws and nuts - hand torque tools - requirements and test methods for design conformance testing, quality conformance testing and recalibration procedure iso 6789 : 2003 ; german version en iso 6789 : 2003

    螺釘和螺母用裝配工具.手動轉矩工具.設計一致性試驗
  12. Steel frame with welding joint easily occur brittle collapse because of having a low ductility at joints then , a semi - rigid connected steel frame has large the energy absorption capacity which can resist dynamic loads and the using steel qualities of bracing system and joints are small so adopting a semi - rigid jointed steel frame is economical and stable but for semi - rigid connections are complex and variable , in conventional analysis and design of steel structures , it is usually assumed that the connections between columns and beams are either rigid or pinned the analysis of steel frames adopting the assumption can simplify the procedure of analysis and design , but cannot precisely reflect structural practical circumstance and the errors of calculating results are large , even , get incorrect conclusions semi - rigid connection was referred to in chinese code for design of steel structures ( 2001 , 10 ) , however , it isn ’ t specified how to apply semi - rigid joints in design in fact it cannot be carry out the purpose of the paper give a calculating method that accords practical engineering and easily put into effect worthwhile it is going to promote the development of semi - rigid jointed steel frame in design and heighten structural stability in the paper , at first some commonly employed methods for the modeling of connection behavior are introduced richard abbott function modeling of connection is adopted for extended end plate bolted connection by the 34 test data comparing to regression analysis indicate richard - abbott function modeling of connection represents an excellent fit to test data then after a semi - rigid joint behavior can be modeled as a finite stiffness rotation spring , base on rotation and displacement equation derive the element stiffness matrixes with semi - rigid connections where the effects ofj ointed flexibility geometric non - linearity and shear forces in the connection deformations have been considered in and fixed - end forces are modified finally, a program for calculating semi - rigid with incremental - iterative method has been

    本文的目的就是為半剛性連接鋼框架的設計提供一種既符合工程實際又簡便易行的計算方法,供規范使用過程的補充、延伸或參考;同時,也將促進半剛性連接鋼框架設計技術的發展,為提高結構安全性能、節省工程成本發揮應有的作用。本文首先介紹了常見的幾種應用較為廣泛的樑柱連接彎矩轉角關系模型,在分析比較的基礎上,選用richard ? abbott函數模型作為外伸端板連接彎矩轉角關系模型,通過對34個外伸端板連接的實驗數據與回歸分析得到的參數比較可知,經回歸分析得到的此模型參數與實驗數據符合較好。然後用彈簧表徵連接點的轉動剛度,根據梁的轉角位移方程推導出半剛性連接的剛度矩陣,在單元剛度矩陣中考慮了節點柔性、幾何非線性和剪切變形的影響,並對固端力進行了修正,最後用增量迭代法編制有限元程序進行計算和分析。
  13. General methods of test for pigments and extenders - determination of residue on sieve - mechanical flushing procedure

    顏料和填充劑的一般試驗方法.篩渣的測定.機械沖洗步驟
  14. General methods of test for pigments and extenders. part 18 : determination of residue on sieve. mechanical flushing procedure

    顏料和填料的一般試驗方法.第18部分:篩渣的測定.機械沖洗程序
分享友人