test working 中文意思是什麼

test working 解釋
試車
  • test : n 1 檢驗,檢查;考查;測驗;考試;考驗。2 檢驗用品;試金石;【化學】試藥;(判斷的)標準。3 【化...
  • working : adj 1 工作的,從事勞動的。2 操作的,作業的。3 工人的。4 (用於)實際工作的,任事的;使用(中)的...
  1. The method of close water test has been used for a long time, so richer experience has been achieved. however, it not only takes pains and time, but also consumes raw materials during the close water test because of miscellaneous working procedures such as bricklaying in the two ends of pipe, water - repellent layer plastering, maintaining and water offletting, brick - block backouting after the test, especially in the region short of water and some drainage pipe with prop - pipe construction. in order to satisfy the fast development of municipal construction, new detection methods should be developed

    閉水試驗方法因其應用時間較長,目前已積累了較豐富的經驗,但在閉水試驗時,管道兩端砌築磚堵、抹防水層、養護、灌水浸泡,以及試驗后的放水、磚堵拆除等繁雜工序,不僅費工、費時,而且消耗原材料,尤其是在缺水的地區以及頂管施工的無壓管道,這些矛盾更加突出;因此,為滿足迅速發展的市政建設需要,有必要探索新的檢測方法,閉氣試驗就是其中一種,但是閉氣試驗目前還不完善,有待于進一步深入研究。
  2. And is incorporated into the rdf test cases working draft see

    ,而且被編入了rdf test cases工作草案中(請參閱
  3. Equipment for working the soil ; s - type cultivator tines ; test method

    農用機械.土壤耕作機具. s型耕耘機叉齒.試驗方法
  4. 6. perfected the freeze frame, read data stream, actuation test and working supporting function of engine for nissan special protocol

    6完善了日產專用協定engine凍結幀讀資料流程動作測試和工作支持。
  5. Abstract : through on - the - spot test and theoretical calculation, the re gular pattern that the used hot - blast parameters of the grain drier change with the variation of working conditions was revealed

    文摘:經理論計算及現場試驗,揭示了糧食乾燥機廢氣參數隨其工作條件的改變而發生的規律性變化。
  6. Marked by a different degree of intensity in different regions, infectious diseases, working as a litmus test, expose social and economic problems, aggravate social inequality and contribute to discrimination

    雙方高度重視在打擊非法移民領域的合作。根據兩國元首達成的協議,雙方正加緊籌備成立中俄移民問題聯合工作小組。
  7. We make moldings strictly according such process, plan and assign jobs, designing the mould structure, rough working, accurate working, test, benchwork assembly, post treatment, test and production. we adopt standard moulding accessorics in order to make our customer fast and accurately get what they need at any time

    我們嚴格按照「策劃分配任務?模具結構設計?粗加工?精加工?檢測?鉗工裝配?后處理?檢測?生產」的生產工藝流程進行模具製造,採用標準化的模具配件讓我們的客戶隨時、快捷、準確地獲取您之所需。
  8. Of course, working with the output of the generation of all possible permutations of test inputs could quickly become unfeasible depending on the application under test

    當然,處理測試輸入的所有可能的全排列輸出很快就行不通了(依據在測的應用程式) 。
  9. We want to make sure a working copy of websphere portal is installed that you can test

    我們希望確保安裝webshpere portal的一個工作副本,您可以對其進行測試。
  10. Information technology - card durability test methods working paper

    信息技術.卡耐久性試驗方法工作紙
  11. The paper simulated the 10kw space solar power system, the outcome and the test data can be used as the reference to choose the facility or the working substance

    本文較完整和準確地完成了10kw太陽能熱動力電源系統的模擬工作,其模擬試驗結果有助於設備選型和工質選擇。
  12. The heat coefficient changing of the heater and reheat ; c. the leakage test of the working substance ; d. the damage test for the heat pipes of the radiator, were taken

    分析了穩態參數,完成了:吸熱器熱負荷擾動試驗、吸熱器及回熱器換熱系數變化試驗、工質泄漏試驗、輻射器熱管損壞試驗等多個模擬實驗。
  13. Based on the investigation and study of impact compaction technology in civil and abroad, this paper discusses the impact compaction working sections that include xining ~ huangyuan, machangyuan ~ pingan, xining ~ taersi and pingan ~ adai expressways. through contrast analysis and generalization of the working sections " test data and aggregate analysis of expressways " test result, this paper studies construction process, construction effect test method and efficiency of loess subgrade construction applied by impact compaction technology in qinghai province

    本課題在對國內外有關沖擊壓實技術調研的基礎上,依託西湟公路、馬平公路、西塔公路及平阿公路試驗段開展沖擊壓實試驗研究,對各個試驗段的試驗結果進行分析、綜合和總結,研究了沖擊壓實技術在青海黃土路基施工中的施工工藝、施工效果、檢測方法及效益等問題。
  14. The shear mechanism, failure mode, deformation capacity, bearing capacity and the reliability of the anchored angle steels of the wrapped steel concrete cast - in - site frame typical story exterior joints under the middle and high axial compression ratio ( n = 0. 3, 0. 5, 0. 6 ), the working performance, failure mode, and the shear capacity of top story joints under the crack moment, the hysteresis characteristic and the dissipation energy capacity of the test joints are all analysed based on the 1 / 4 model pseudo - static tests of five specimens of wrapped steel concrete cast - in - site frame exterior joints, which varied in axial compression ratio, distribution of the beam angle steels and the stirrup ratio

    基於上述分析,本次試驗通過五個外包鋼混凝土邊節點1 4比例模型的偽靜力試驗,以柱的軸壓比、梁角鋼布置形式、配箍率等為主要參數,分析外包鋼混凝土現澆框架一般層邊節點在中高軸壓比( n = 0 . 3 、 0 . 5 、 0 . 6 )條件下,節點的抗剪機理、破壞模式、變形能力、承載能力和角鋼錨固的可靠性;分析了頂層邊節點在張開彎矩作用下的工作性能、破壞模式和抗剪承載力;分析了試驗節點的滯回性能和耗能能力。
  15. This thesis introduces the working principle, craftwork requirement, modeling process, control strategies and the realization of lf refining furnance bottom blowing argon control system. through the study and analysis of bottom blowing argon process control system, the thesis discusses the mean neural network model of controlled object and the mathematical models of the exectors, pwm adjustable pressure controller and pcm adjustable flux controller according to the relevant liquid knowledge and relevant data, including design data, test data and running data. to begin with the craftwork reguirement of bottom blowing argon and the actual instance of the control system, it presents the strategies of fuzzy parameters self - adaptive pid control used in pressure difference inner loop and fuzzy plus pi compound control used in flux outer loop which are based on the above modeling in order to carry out the accurate control of argon flux

    本文介紹了lf精煉爐底吹氬過程式控制制系統的工作原理、工藝要求、建模過程、控制策略以及控制系統的實現。通過對精煉爐底吹氬過程式控制制系統進行研究與分析,並根據流體力學的有關知識以及有關數據(其中包括設計數據、試驗數據和運行數據) ,建立起了被控對象的平均神經網路模型和執行機構(即pwm調壓器和pcm調流器)的數學模型。在此模型的基礎上,從底吹氬工藝要求和控制系統的實際情況出發,提出了壓差內環模糊參數自適應pid控制策略和流量外環模糊pi復合控制策略,以實現氬氣流量的精確控制。
  16. According to the working principle of closed cycle diesel engine, the whole solution including charge intake system, seawater management system and monitoring system was put forward in this paper. test - bed of closed cycle diesel engine was established based on a conventional diesel engine with its type 4102bg

    針對本文的主要工作,提出了閉式循環柴油機進氣控制系統和監測系統的具體實施方法,並以4102bg型非增壓柴油機為主機,完成了閉式循環柴油機裝置的試驗臺架建設。
  17. This method can be applied to the data of product usage and life test, namely, to access the confidence lower limit for the mean residual life under the condition of product normal working period at a certain given probability, which gives the reference for the plan of instrument life prolong and maintenance

    使用該方法,利用產品的使用及壽命試驗數據,即可對產品在給定概率下和正常工作一定時間后的平均剩餘壽命置信下限進行評枯,為延壽使用及維修計劃的制定提供依據。
  18. Cosmic ray test was carried out to choose and optimize working parameters of full - length prototype and its data acquisition system, verify the electronics system about dynamic range, drift time measurement search window, charge measurement integral width, work stability and electronics grounding and noise. in experiment, acquired abundant experience with the solution of actual problem and verified their reliability of physical design. this lays the foundations for the successful construction of the besiii drift chamber and electrical system

    測試過程中我們調整了電子學的動態范圍、漂移時間和電荷測量參數驗證了電子學系統工作的穩定性、抗干擾能力及噪聲水平等並成功解決了實驗過程中遇到了問題。通過長時間的取數進一步檢驗了全長模型和電子學系統工作穩定性,驗證了全長模型及其數據獲取系統物理設計的可靠性,為漂移室和電子學系統的成功研製奠定了基礎。
  19. Laundry and dry - cleaning machines ; testing of output, effect of treatment and consumption of working materials ; test conditions and methods

    洗衣機和乾洗機.洗滌能力洗滌效果和洗滌材料消耗量
  20. Prepare for starting, test working is gone on under the direction of engineer in yichang diesel factory

    按製造廠的推薦進行動車前的準備,試驗工作必須在宜昌柴油機廠服務工程師的指導下進行。
分享友人