time cost 中文意思是什麼

time cost 解釋
工時成本
  • time : n 1 時,時間,時日,歲月。2 時候,時刻;期間;時節,季節;〈常pl 〉時期,年代,時代; 〈the time ...
  • cost : n 1 費用;代價,價格;成本。2 犧牲;損害,損失。3 〈pl 〉訟費。vt (cost; cost)1 值,要價(苦幹...
  1. To solve the problem of rule learning time cost for traditional transformation based part of speech tagging method of latin mongolian, a dynamic partition algorithm was presented

    針對傳統基於轉換的詞性標注方法中規則學習速度過慢的問題提出了一種對訓練語料庫進行動態劃分的演算法。
  2. Zhang lixia ( water conservancy engineering ) supervised by professor shi kebin this paper mainly discussed a method for multi - goal network ' s optimization. since the network plan was brought forward, the criterion for evaluating network was time cost resource all along. in this paper, through massive study on achievements the predecessors had done the author posed a new criterion : quality, and set up the network ' s quality model ; simultaneously, the author established the network ' s multi - goal model by synthesizing the existing optimum models, also found the finite not bad solution of the model ; because the four goals was in contradiction with each other, using the multi - goal decision theory can optimize the network project scientifically and objectively

    本文在對前人關于網路計劃研究結論的總結分析的基礎上,探討了評價網路計劃優劣的各準則,提出一種新的評判準則:工程質量,並建立了網路計劃的工程質量模型;針對目前網路計劃多是單目標的優化,綜合網路計劃就各目標優化方法的研究理論,建立了網路計劃的多目標模型,並將工程質量模型融入其中,根據網路計劃的特點,解出該模型的有限個非劣解;由於各優化目標之間的矛盾性、不可公度性,用多目標決策理論的方法,科學而客觀地對網路計劃進行了多目標優化,從而避免了人為決策的盲目性、主觀性。
  3. As far as time cost and accuracy are concerned, this criterion based on waveform discernment is superior to the traditional one based on the transmission line voltage amplitude sampled after breakers work and has been verified its exactness by dynamic emulation

    所提判據在時間和準確性上要優于傳統的基於故障后線路開關開斷后故障線路殘壓幅值的判別法,並經動態模擬驗證了其正確性。
  4. So you save energy and reduce time - cost simultaneously

    既節約能源,又節省了時間。
  5. Discussion on realization of real - time cost management of construction

    建築工程成本控制即時化謅議
  6. Many day endowment the enterprise is thrown from balance manpower and time cost considers, the bag outside still choosing is done to talent intermediary company, and from low put to all high position

    不少日資企業從平衡人力投入和時間成本來考慮,還是選擇外包給人才中介公司來做,而且從低到高的所有職位都放出來。
  7. Time - cost trade - off in a transportation problem with multi - constraint levels

    多約束水平運輸問題的時間費用均衡
  8. When making the transient simulation for modern large scale power system, both calculation storage amount and time cost are large

    摘要對具有龐大規模的現代電力系統進行暫態穩定計算時,計算存儲量大,計算時間長。
  9. The effects to which stations attract passenger flow, trip time, cost, real estate along line, urt feeder other traffic, structure and configuration of city were analyzed. based on the minimize trip time of passenger, the model of optimal average distance between urt ’ s stations and the model of station ’ s coverage and the model of station ’ s cost and benefit were proposed

    分析車站分佈對吸引客流、乘客出行時間、工程造價、運營及沿線土地開發、城市軌道交通與其它交通方式的銜接、城市空間結構和城鎮體系布局的影響;建立了基於乘客出行時間最短的最優平均站距模型、車站選取的覆蓋量模型與費用效益模型。
  10. The main disadvantage of iterative algorithm is its slow speed and the time cost of image reconstruction is directly proportional to the number of projections and the size of reconstruction image

    迭代重建法最大的缺點是速度慢,其花費時間同投影數的多少以及重建圖像的大小成正比。
  11. A fast and real - time algorithm to obtain some vectors of the projection matrix is proposed in this dissertation to solve the conflict of time cost by matrix obtainment and memory occupied by matrix, and speed the iterative algorithm

    作者根據扇形掃描幾何的對稱性和重疊性,提出了一種快速實時獲取投影矩陣分量的方法,較好地解決了獲取投影矩陣所需速度和存放其所佔內存空間的矛盾,提高了迭代重建演算法的速度。
  12. In this paper, the nonlinear real - time model of x turbofan engine is analyzed. some improvement is adopted to reduce the calculating time cost by engine model

    本文分析研究了某型渦扇發動機的非線性實時模型,對模型的迭代運算部分進行了改進,以提高模型的運算速度。
  13. Time value of capital in time cost trade - offs problems

    費用優化中資金的時間價值
  14. The scale of the equivalent system is of 50 percent of the original one, and the time cost of transient siumlaton for the equivalent system is reduced to almost half while the calculation precision is acceptable

    算例中等值網路的節點數目、支路數目、發電機數目和負荷數目大約只有原始網路的50 % ,用等值網路進行暫態穩定計算大約可以節省一半的計算時間,且計算結果的精確度完全滿足工程的需要。
  15. Efficiency can be measured in time, cost, labor, or value

    效率通過時間,成本,勞動或價值來測定。
  16. To analyze the factors of impacting load balancing of links, which is including the number of routes between source node and destination node, the number of routes through every link, the maximum flow between source node and destination node, the maximum flow through every link, the free bandwidth of every link and so on, we present the fast dynamic routing algorithm ( fdra ) and the critical link routing algorithm ( clra ). simulation results show presented algorithms in the paper are better than other algorithms in reject ratio of the traffic requests and performance of rerouting the traffic requests when a link is failure, especially in computing time cost

    通過分析影響網路的鏈路負載均衡的因素,比如源-目的節點間的最大流,通過每條鏈路的最大流,源-目的節點間的路徑數目,通過每條鏈路的路徑數目,以及鏈路的剩餘容量等,提出了快捷動態路由演算法fdra和關鍵性鏈路路由演算法clra ,通過模擬,與最小跳演算法( mha ) 、最寬最短路徑( wsp )演算法、最小干擾路由演算法( mira )相比較,提出的兩種演算法在業務阻塞率、資源利用率以及重路由性能方面都有很好的效果。
  17. Basically, to explore the subject matter more critically, the differences between the time / cost trade - off and the time / resource trade - off, the necessity to use especially the time / resource trade - off in a context of m ultiplicity, of non fragmentation and non substitutability of resources were analyzed

    基本上,為了使該問題的探索更加嚴謹,本文闡述了時間成本優化和時間資源優化的區別,以及在多樣性背景下使用時間資源優化的必要性,以及資源的完整性和不可替代性。
  18. In this dissertation, research has been made on the topics of clock of cluster system, time - cost of debugging, intrusion of interactive debugging operation, dynamic conditional breakpoint, and performance debugging issues

    本文對并行調試中的時鐘模型、時間開銷、互動式調試的干擾、動態條件斷點、性能調試等問題進行了研究,取得了有價值的成果。
  19. This paper classifies the researching results of the academicians and explores the inner meanings of touring itinerary from the four dimensions of space, time, cost and tourism activity. based on this, we have carried out a systematic category on touring itinerary

    本文對學者們的研究成果做了分類整理,從空間維度、時間維度、成本維度和旅遊活動維度四個層面討論了旅遊線路的含義,並以此為基礎對旅遊線路進行了系統分類。
  20. Discussion on time cost of project management

    項目管理中的時間成本探討
分享友人