top tie beam 中文意思是什麼

top tie beam 解釋
上系梁
  • top : n (opp bottom foot)1 頂,頂部,頂端。2 頭,頭頂;尖端;樹梢,樹頂;(事物的)上層部分。3 最高位...
  • tie : vt (tied;tying)1 (用繩帶等)扎,系,綁;用帶子束緊(帽、鞋等);打(結、領結等);束縛,綁住。...
  • beam : n 1 梁,棟梁,桁條;(船的)橫梁。2 船幅;(動物、人的)體幅。3 (秤)桿,杠桿,(織機的)卷軸,...
  1. Abstract : the paper probed the analysis on the adding mode of perpendicular load in multistorey building structures, the bending moment of frame side beams and the top, the bending moment of secondary beams, the difference between the tie - beam, plane - frame analysis and the space analysis on the path of conduct force, ect. it can be used as a reference when probing these problems

    文摘:討論了在多項高層建築結構分析中垂直荷載加載模式的選擇,框架邊梁和次梁端部的彎矩計算,連梁問題和平面框架分析與空間分析在傳力路徑上的差別以及單片剪力墻平面外彎矩等問題,可供同類結構內力分析時參考
  2. Visual observations showed that a horizontal displacement in the longitudinal direction of the bridge developed between the tie girder and the top flange of the floor beam at the end connection.

    肉眼觀察表明:在端節點處的系梁和橫樑上翼緣之間產生一種沿橋梁縱向的水平位移。
分享友人