traffic impact assessment 中文意思是什麼

traffic impact assessment 解釋
交通影響評估
  • traffic : n 1 交通,(人、車、船、飛機的)來往;交通量;運輸;運輸量;運輸業;旅客,貨物。2 交易,貿易 (in...
  • impact : n 碰撞;沖擊(力);(火箭的)降落[著陸];【軍事】彈著;影響,效力。 The point of impact彈著點。 ...
  • assessment : n. 1. (價格的)評定,(稅額的)估定,(損害額的)查定。2. 稅額,攤派額。3. 【商業】應繳股款。4. (功過的)評價。
  1. The west kowloon cultural district traffic impact assessment final report in the cd - rom suggested 415 parking spaces for private cars for the core arts and cultural facilities while the schedule of accommodation and preliminary design brief for core arts and cultural facilities in the cd - rom stated a total of 2, 300 parking spaces for private cars for these facilities

    載于光碟內的西九龍文娛藝術區交通影響評估最後報告建議,應為核心文藝設施設置415個私家車停車位,但光碟內的核心文藝設施用途分配表和初步設計大綱則規定,應為這些設施合共設置2300個私家車停車位。
  2. The traffic impact assessment report for pak shek kok development

    白石角發展計劃的交通影響評估報告
  3. Carparking provisions will be identified in the upcoming traffic impact assessment

    在即將進行的交通影響評估中,將會檢討泊車設施的供應。
  4. In the wkcd traffic impact assessment final report ( tia report ) contained in the cd - rom included in volume two of ifp, an elevated road over the whc toll booth connecting wkcd and providing a slip road leading to west kowloon highway has been recommended for implementation by others

    請澄清,建議者須否根據該交通影響評估報告的建議,在西九龍文娛藝術區內辟設一條車輛通道連接西區海底隧道繳費處上的高架道路,或為辟設這通道作好準備。
  5. The suggested provision of 415 car parking spaces is only a broad indication of the level of parking provision required for the core arts and cultural facilities in the traffic impact assessment final report. the suggestion is derived from surveys carried out on the travel behaviour of patrons of a number of existing arts and cultural facilities in hong kong on the basis of the government s baseline. proponents are required to provide appropriate level of car parking provision according to type and scale of the facilities in their development proposals and their preliminary traffic study pursuant to section 4. 4. 3 ( a ) of volume one of ifp

    西九龍文娛藝術區交通影響評估最後報告建議提供415個停車位,只是就核心文藝設施的停車位供應量給出一個籠統的數字。這項建議是根據政府基線計劃提出,源於對本港現有多項文藝設施的觀眾對交通工具的選擇的調查。建議者須根據其發展建議的設施類別和規模,以及依據發展建議邀請書第一冊第4
  6. Traffic impact assessment, traffic impact evaluation

    交通沖擊評估
  7. Traffic impact assessment

    交通影響評估
  8. Proponents may make reference to a broad traffic impact assessment study for wkcd undertaken by government on the basis of government s baseline

    倡議者可參考政府基線計劃( governmentbaseline )中為西九龍發展所做的運輸及交通影響評估研究。
  9. Government will give consideration to implement the road improvement schemes recommended in the traffic impact assessment final report in time for the development of wkcd

    為進行西九龍文娛藝術區發展,政府會考慮及時落實交通影響評估最後報告建議的道路改善計劃。
  10. We are conducting detailed environmental and traffic impact assessment studies on the recovery park to be established at tuen mun area 38. we expect to complete the studies in december this year

    我們正就在屯門3 8區闢建回收園進行詳細的環境和交通影響評估研究,預計於今年十二月完成。
  11. In response to these concerns, the study recommends that in the preparation of the pedestrian plan, there should be a broad traffic impact assessment to evaluate the acceptability of the pedestrian planning proposals

    因應公眾的關注,研究提出了在擬備行人環境規劃圖則時,應進行概括的交通影響評估,以評定行人環境規劃建議的可接受程度。
  12. The traffic impact assessment ( tia ) final report provided in the cd - rom included in volume two of ifp recommended a number of road improvement schemes in the form of local road junction and infrastructural improvements

    載于發展建議邀請書第二冊所附光碟的交通影響評估最後報告,建議實施多項道路改善計劃,以改善區內道路的路口及基礎建設。
分享友人