traffic level 中文意思是什麼

traffic level 解釋
交通繁忙
  • traffic : n 1 交通,(人、車、船、飛機的)來往;交通量;運輸;運輸量;運輸業;旅客,貨物。2 交易,貿易 (in...
  • level : n 1 水平儀,水準儀;水準測量。2 水平線,水平面;水平狀態;平面,平地。3 水平,水準;水位;標準;...
  1. Since the reform and open in china, however, there are many hidden - troubles of transportation though the urbanization level has been improved greatly. for instance, the city has been constructing more high - ways, but the increase of vehicles is much more than mileage, so that the traffic is aswarm and crowded, the living quality of citizens is depressed and the urban economy is blocked

    而我國自建國后,尤其是改革開放以來,盡管城市化水平有了很大提高,但同時也暴露出了很多交通方面的問題和隱患,例如,城市內高等級道路增長很快,但由於車輛的增長遠遠高於道路里程的增長,從而造成交通擁擠、堵塞,城市居民生活質量下降,甚至會阻礙城市經濟的進一步發展。
  2. After 1990s, information industry and data traffic network have greatly mushroomed and influenced industrial automation. new type industrial networks such as dcs, fieldbus and industrial ethernet have brought a high - level revolution in industrial automation. however because of the disunion of the international standards of fieldbus and indirect interconnection and interoperation between different kinds of fieldbus products, the openness of fieldbus can not be achieved easily

    90年代以來,以internet為代表的計算機信息產業和數據通信網路蓬勃興起,發展迅速,同樣也對工業自動化領域形成了強大的沖擊,新型的工業計算機網路如新型集散控制系統( dcs ) 、現場總線( fieldbus ) 、工業以太網( industrialethernet )等大量涌現,給工業自動化帶來一場深層次的革命。
  3. The highway are widened and reinforced intensity and heavy repaired on the basis of old highway, so that the highway can be improved the level and the traffic capacity in shenyang city even all over liaoning province in last few years

    從沈陽市乃至遼寧省近幾年公路建設來看,主要採取在原有路線的基礎上進行加寬、補強改建和大修,以此來提高公路的等級,增大通行能力。
  4. The urban traffic trunk is regarded as a large system, and the subsystems are the intersections in the trunk. then we desipi a two - level coordinated fuzzy control method and use ann to implement the fuzzification, fuzzy inference and defuzzification. the arithmetic homs the strongly self - adapt, self - learning and fault - tolerant function

    3 )把城市交通干線作為一個大系統,子系統為干線上的各個交叉口,在此基礎上,設計了一種城市交通干線的兩級模糊協調控制演算法,並用bp神經網路實現控制器的模糊化、模糊推理和清晰化三個部分,系統具有較強的自適應、自學習和容錯性。
  5. The paper is based on innumerable practical heavy - load road data, deliberate heavy - load standard in detail through theoretical arithmetic, and bring heavy - load standard about cement concrete pavement and asphalt concrete pavement separately ; in the meantime, through a large quantity of cement concrete pavement stress calculation, the paper puts forward relation expression between load on concrete board and stress level under board ; meanwhile, the paper puts forward traffic classification about cement concrete pavement and asphalt concrete pavement ; through bearing board testing on each structure sheaf the paper finds the material modulus gets modified ; through comparing position equivalent rebound modulus to theoretical equivalent rebound modulus, the paper points out limitation of nomograph in course of cement concrete pavement design, whereby, puts forward modifier formulas about theoretical equivalent modulus

    本文以大量的重載道路資料為主,從實際出發,結合理論計算,對重載標準進行了詳細的討論,分別給出了水泥混凝土路面與瀝青混凝土路面的重載標準了;同時,通過大量的水泥混凝土板底應力計算,推導出了混凝土面板荷載與板底應力水平的關系式;給出了水泥混凝土路面與瀝青混凝土路面的交通分級;通過對試驗路各結構層進行承載板測試,發現現有材料模量較以前有了明顯的提高;對比現場實測的當量回彈模量與理論當量回彈模量,指出現有水泥路面設計中的諾謨圖不能完全符合現有道路材料,從而提出了對理論模量的修正公式。
  6. Shipment traffic usually is heavy in littoral area, the navigation capability is required in many riverway. navigation lock was set to suit for the water level ' s variety caused by tide. for a long period, being lack of the quantified assessment on the influence of saltwater intrusion, approaches that freshwater is inpoured to the lock chamber are adopted lest the high concentration salt water be imported to the inland waterway, when the navigation lock is in operation. but such manner should not be reasonale enough

    沿海地區船運發達,很多河道有通航要求,為克服潮汐造成的水位變化而設置船閘。長期以來,由於缺乏對鹽水入侵內河河道產生影響的定量評估,在船閘運行過程中為防止高鹽度鹹水入侵內河,通常採用將內河淡水打入閘室的方式來調節通航水位,船閘的這種運行方式不盡合理。
  7. Low - level windshear and turbulence alerts for the approach and departure areas within 3 nautical miles of the runway thresholds are issued by the amo for relay by air traffic controllers to approaching and departing aircraft

    機場氣象所發出在跑道進口3海里內的機場升降區的低空風切變及湍流警報,由航空交通管制員轉送至正在升降的航機。
  8. This paper, on the basis of yuelu - mountain high - tech park in changsha city, beginning with the investigation of diversiform transit - trip in the park, firstly analyzes and evaluates space - time change law of traffic flow and situation of traffic service level on actual road net - work in the park ; secondly, applying multi - statistical analysis method, taking investigated corporation as sample, using annual freight traffic volume produced by unit plant area of the corporation, with clustering analysis, obtains four sorts of the sample corporation, and establishes the predict models of freight traffic volume for every kind of corporation. with these models, actual or planning year ’ s day maximum freight traffic volume can be predicted. the third, this paper makes analysis research of trip law of employees in the park, and obtains the index of trip times, trip modes and trip development trend of the employees

    本文以長沙市嶽麓山高科技園區為依託,從調查園區內的各類交通出行開始,首先分析評價了園區內現狀道路網上的交通流時空變化規律及道路網上的交通服務水平狀況;其次是應用多元統計分析方法,以調查企業為樣品,以企業單位車間面積所產生的年貨運交通量為變量,通過聚類分析,獲得了樣本企業的四個類別,並建立了各類企業貨運交通量的預測模型,應用這些模型,可預測園區內現狀或規劃年的日最大貨運交通量;第三是對園區內企業員工的出行規律做了分析研究,獲得了企業員工的出行次數、出行方式及出行發展趨勢等等特性指標;最後是對園區內小區居民的出行狀況進行了分析,獲得了居民出行的諸如高峰時段、高峰出行量等等的特徵數據。
  9. Scene district is away from the orchid county of level ground 56 kilometers, is away from big reason, beautiful river 200 kilometers, traffic is convenient

    景區距離蘭坪縣城56公里,距離大理、麗江200公里,交通極為便利
  10. First, this paper looks for the national experiences that organizing city traffic in the rodeway system, in conditions of the mobile and no - mobile number being big. then analyzing the questions and reasons in middle - scale - city roadway system, on the base of studying characters of use - land and residents journey, transportation tools and relations of the transportation and economy development, put forward some proposes in roadway system on the base of middle - scale - city characters of basic construction and solving the new problems of city traffic. through analyzing the relations of middle - scale - city roadway system, city land - use and land - shape, put forward some development antidote. in the circumstance of road facilities being lack, improve the level of traffic management of city roadway system, improve traffic environment of city roadway system. put forward some revised proposes on road - net norm of middle - scale - city road system in our country ; consider the plan of isolating mobile form no - mobile in the organization of roadway system ; construct revaluating system of city roadway system. at last through studying a typical case of yuncheng, put forward some solutions and measures ; through using evaluating system, evaluate, contrasts and analyses the present conditions in city roadway system and planning program

    本文首先尋求國外機動車和非機動車擁有量都較大的情況下,為組織好城市交通在道路系統方面所取得的可供我國借鑒的經驗,然後在對我國中等城市用地特徵、居民出行特徵、交通工具、交通與經濟發展的關系等進行分析的基礎上,剖析中等城市道路系統現狀存在的問題及其形成原因,以及對今後城市交通將要出現的新問題,提出以中等城市的交通結構特點為基礎的機、非分流道路系統的建議;通過分析中等城市道路系統與城市土地開發、城市用地形狀等之間的關系,並相應其提出發展的一般對策,在道路設施不足的情況下,加強城市道路交通系統的管理,提高城市道路交通環境,對我國中等城市道路系統在道路網指標上提出修正意見,對道路系統組織機、非分流進行思考;並建立了城市道路系統評價指標體系;最後以運城市做為實例分析,具體提出近期處理的對策與措施,並運用評價體系對城市道路系統現狀和規劃方案進行評價對比分析。
  11. In charge of one of major subjects of the national eighth five - year plan, i. e. " study on shotcreting techniques of polyacrylate emulsion cement mortar for impermeability coating of pu ding rcc dam ", the achievement of which has been appraised by the ministry of electric power and evaluated as reaching national leading level. 2. in charge of the major subject aided by the committee of national natural science funds, " study on durability of high bolumes of fly ash concrete ", the first phase achievement of which has been commended by the committee. 3. in charge of one of major subjects of the national ninth five - year plan, i. e. " study on high performance concrete in marine engineering, design and construction ". 4. acting as one of editors - in - chief of " technical specification for abrasion and cavities resistance of concrete in hydraulic structures ", which is issued by the ministry of water resources. 5. by providing the repairing and strengthening schemes on seepage and cracks of the basement of nanjing lukou international airport, the air traffic opening of the airport was ensured as scheduled. 6. consulting services on techniques of high performance and abrasion - erosion resistance concrete for three - gorges project, anti - corrosion of reinforced concrete strutures for the ore port of shanghai baoshan iron and steel works, mass fly ash concrete for jiangyin yangtze river bridge and pumping concrete for nanjing yangtze river second bridge

    主持國家「八五」攻關項目「普定碾壓混凝土壩上游面丙乳砂漿防滲層大面積施工工藝研究」 ,成果通過部級鑒定,評價屬國內領先水平; 2 .主持國家自然科學基金重大項目「高摻量粉煤灰混凝土的長期性能研究「 ,階段成果獲國家自然科學基金委通報表彰與獎勵; 3 .主持國家「九五」攻關項目「海工高性能混凝土成套技術研究」 ; 4 .水利部「水工混凝土抗沖磨防空蝕技術規范」的主編之一; 5 .為南京祿口國際機場地下室修漏與裂縫補提出技術方案被采納並實施,為機場如期通航作出貢獻; 6 .為三峽工程抗沖磨高性能混凝土技術、上海寶鋼礦石碼頭鋼筋混凝土防腐蝕技術、江陰長江大橋大體積粉煤灰混凝土技術、南京長江二橋泵送混凝土技術等提供咨詢建議。
  12. Data in this chapter show the conditions of transportation, postal and telecommunication services, mainly covering freight and passenger traffic, freight handled at ports, transportation infrastructure and machinery, civil motor vehicles and transport vessels, berths and warehouses at major ports ; business volume of postal and telecommunication services, main communication capacity of telecommunication services, and level of postal and telecommunication services

    本章反映我市交通運輸業和郵電通信業情況,主要包括貨物和旅客運輸量、港口吞吐量、交通基礎設施和運輸營運工具、民用車輛和船舶、主要港口碼頭泊位和倉庫、郵電業務、電信主要通信能力和郵電通信水平。
  13. Provision of wide area low level air traffic surveillance system

    提供廣域低空空中交通監察系統
  14. Firstly, the development condition of the post assessment of highway construction project was introduced in this thesis. the signification, basic content, and assessment procedure of the post assessment were analyzed, and the relationship and difference between the post assessment and feasibility research were elaborated. then the post assessment for operation condition and operation management of chengdu chengbei entrance expressway were studied, some related proposed was put forward, in this thesis, the post assessment for operation condition and operation management was studied emphatically. the main contents of traffic survey were produced, the calculating methods of capacity and service level were studied and analyzed, and the idex system of the post assessment for operation condition was established

    論文首先介紹了高速公路建設項目后評價是高速公路基本建設程序的重要組成部分,是管理周期中不可缺少的信息反饋環節,對全面總結項目前期工作,提高高速公路建設項目決策、設計、施工和運營管理水平具有重要的意義,已經成為全面、客觀衡量項目前期工作,提高項目效益的重要手段;研究了高速公路建設項目后評價的發展現狀,分析了后評價工作的意義、基本內容和程序,探討了后評價與可行性研究的聯系與區別。
  15. Its can amplifier the capability of traffic and service level, improve environment and energy efficiency

    Its的建立可以提高路網通行能力和服務水平,改善環保質量,提高能源利用率。
  16. The quality of maritime training units directly influences marine seafarers " technical quality which is a crucial factor for maritime traffic transport system. therefore the technical level of seafarers to be trained is determined by the condition and quality of the training units

    船員技術素質的高低直接決定著海上交通運輸系統的安全,而船員培訓機構的培訓質量又直接影響著船員技術素質的高低。培訓機構的條件不一樣,培訓質量不一樣,培訓出的船員技術水平也不一樣。
  17. To coordinate and monitor road opening works more effectively and to minimise traffic disruption, the highways department has established a three - tier communication system with participants ranging from high level management to working level staff of utility companies and relevant government departments

    為了更有效統籌和監察這些掘路工程,盡量避免阻礙交通,路政署設立了三級溝通制度。參與交換意見者包括公用事業公司的高層管理人員和工作人員,以及政府有關部門的代表。
  18. As a result of the much lower patronage and traffic level, the operational mode and arrangements of the trial schemes had not been fully tested

    由於旅客人數大減,因此計劃的運作模式及安排,尚未經全面測試。
  19. To mitigate such a shortcoming, dca schemes have been proposed, in which the pool of channels can be dynamically assigned to a cell depending on its current traffic level

    傳統的蜂窩網採用靜態通道分配策略( fca ) ,使得系統設備和通道分配工作變得非常簡單。
  20. We should apply the advanced and scientific management means to public traffic, such as optimizing city bus management ; establishing sound different infrastructure and appraisement index of public traffic and advancing enterprise traffic level of management

    如優化城市公共汽車生產調度系統;建立健全各類公共交通基礎設施和考核評價指標,提高企業交通管理水平。
分享友人