trunk project 中文意思是什麼

trunk project 解釋
干線工程
  • trunk : n 1 樹干 (opp branch); 軀干,身軀。2 本體,主要部分;(河的)主流;(鐵道等的)干線;大血管,大...
  • project : vt 1 投擲,拋出;發射(炮彈等);噴射。2 使突出,使凸出。3 設計,規劃,計劃,打算,籌劃。4 投影;...
  1. New architecture is provided for the strutural form of single rib trunk section bowstring arch bridge with major span and lower strutural high, nd i organized the first such type of design project

    提出了適用於較大跨度、較低結構高度的單肋箱形截面系桿拱的結構形式,並已組織完成了首項設計。
  2. By the research method, this paper bring up the trunk inland waterway net layout project of the " two vertical and three horizontal " to assist with the some contact line and the trunk inland waterway programming standard, and bring up to for guaranteeing program the project smoothly some suggestions into practice

    通過本文研究方法運用,提出江蘇省干線航道網「二縱三橫」輔以若干條聯絡干線的布局方案合干線航道規劃標準;並提出為保障規劃方案順利實施的一些建議。
  3. Associated with a project of the planned xuefengshan tunnel with 7. 6 km long during the construction of shaoyang to huaihua expressway in hunan province of shanghai to ruili national trunk highway, this paper firstly makes an introduction of the frequently - used analysis & computation methods for tunnel supporting structure. then, based on the analysis of the basic theory about the interaction mechanism of surrounding rock and support structure, a spatial computation model is made, a coupling numerical computation method with 3 - d elastic - plastic finite element and infinite element is proposed, and a comprehensive analysis has been made to the effects of the overall stability and safety of the surrounding rocks of different characteristics, different classes and under different construction methods. and thus the problem of 3 - d infinite region to which applying the general finite ca n ' t do has been resolved

    6公里的雪峰山隧道工程,首先介紹了隧道支護結構的常用分析計算方法;然後通過對隧道施工過程中,洞室穩定性與支護結構相互作用機理的深入分析,建立了隧道施工過程的空間計算模型,提出了採用三維彈塑性有限元-無限元耦合的數值計算方法,綜合分析了隧道在不同圍巖特性和圍巖類別條件下,以及不同施工開挖方案等對隧道圍巖整體穩定和安全性的影響,從而解決了通用有限元方法難以解決的隧道三維無限域問題;其可充分發揮有限元法在分析非線性方面的有效性和成熟性,以及無限元法在分析處理無限域和半無限域方面的精確性和簡便性,為隧道施工過程中圍巖的穩定性分析開辟了一條新的途徑。
  4. Using cad technique, the author developed airborne, shipborne and trunk - mounted structural designing templates, created structural designing data base of airborne, shipborne and trunk - mounted electronic equipments and realized the parameterizing modular design. the typical experiment of a project indicated that the cad structural designing system is practical and it has been playing an important role in the structural design in the project

    文中利用cad技術開發了機載、艦載、車載三種結構設計模板,編制了機載、艦載、車載電子設備結構設計資料庫,並實現了機櫃參數化模塊設計,通過某項目設計定型試驗表明,本cad結構設計系統是實用的,並在某項目的結構設計中發揮了重要作用。
  5. The whole project focuses on how to design and realize the scst ( softswitch call server trunk ). the scst can provide the class 4 switch function for various access networks. also, as a service - providing platform, it works with service control point or application server to provide network users with the value - added services

    本課題研究的就是如何設計和實現軟交換中繼呼叫服務器,使其能夠匯接多種接入網路,並能作為統一的業務提供平臺,結合業務控制節點或者應用服務器為融合網路用戶提供智能業務及新型增值業務。
  6. As an initiating transportation project of similar kind in western region, the construction of the phase i chongqing light trunk will not only mitigate the congested traffic transportation, but also be of great significance to the improvement of the urban transportation level and the investment climate

    作為西部地區同類交通運輸項目的一個啟動性工程,重慶市高架輕軌一期工程的開工建設將不僅有效緩解重慶市交通運輸緊張的局面,而且對整個西部地區城市交通水平的提高和投資環境的改善都具有重要的意義。
  7. Most part of the north trunk line of wanjiazhai yellow river delivery project has to pass through the zone of collapsible loess, so the collapsibility of the loess foundation becomes the main engineering geological problem therein

    摘要山西省萬家寨引黃工程北干線輸水管線大部分地段通過黃土地區,黃土地基的濕陷性已成為主要的工程地質問題。
  8. The tentacle - like manipulators, " octarms " which resemble an octopus ' s limb or an elephant ' s trunk were developed via a project called octor ( soft robotic manipulators )

    機器人觸角:不若可以深入並遙控控制的兩棲機器蛇,仿若象鼻的"機器人觸角"則是陸上運作的幫手。
  9. Stage 2 of the project was initiated in 1997, and the trunk sewer further extended in range so that public sewer connection became available for many more village communities

    1997年,第二期工程正式推行,污水主幹渠的覆蓋范圍進一步擴大,使許多鄉村得以接駁至公共污水系統。
  10. This thesis is main analysis three gorges project to the great significance of the yangtze river shipping with main influence, make use of the safe condition of magistracy of yangtze river trunk line to synthesize the valuation way, to yangtze river upper stream water top transportation safety proceed take the gauge of, reason of detailed analysis trouble, find out the safe weak link that ascend of management, actual circumstance after join teetering the three gorges water area the water, bring up to establish the three gorges water area the shipping safety management system ' s speculation, provide the upper grade to test, then slice solid enhance the water on the transportation safe manage, and insure the three gorges water area the water on the transportation the stability of the safe situation

    而近年來,長江上遊船舶航行秩序不穩定,事故多發,安全形勢不斷惡化,使三峽庫區形成后的航運安全管理顯得尤為重要和突出。本文主要分析三峽工程對長江航運的重大意義和主要影響,運用長江干線轄區安全狀況綜合評估辦法,對長江上游水上交通安全進行評估,詳細分析事故原因,找出安全管理上的薄弱環節,結合三峽庫區蓄水后的實際情況,提出建立三峽庫區航運安全管理體系的構想,供上級參考,以切實加強水上交通安全管理,確保三峽庫區水上交通安全形勢的穩定。
  11. The first phase project of " software factory " at the science and technology park in the south east, east of technology incubators, the south by the rapid corridors on the 6th road, technology park to the west side of the trunk road thumb road, north of the park planning for roads, namely technology southwest of the main park entrance

    首期項目「軟體工廠」位於科技園區東南側,東側為科技孵化器,南臨快速幹道6號路,西側為科技園區主幹道拇指路,北側為園區規劃道路,西南側即為科技園區主入口。
  12. In order to ensure the stability and reliability of the lin comfort system in using., we make the project is to research the test - bed of car lin bus control system, as showed in figure 1. the purpose of the test - bed is to test windows - lifter 、 locks - closedown 、 top lighting - control 、 and baggage trunk. of the car and the voltage and the speed of the lin bus

    本測試臺順利完成了對lin總線舒適系統的檢測,給出了測試臺實際運行效果的界面、頂燈和升降電機電流數據表、總線上的電壓和數據傳輸速度、 lin總線舒適系統功能檢測結果以及可靠性試驗數據。
  13. Through analysis and study, it is believed important and feasible that the implemented projects, the importing feng jia - shan reservoir into yang mao - wan reservoir and the water supply from shi tou river to xi ' an city ; form the synthetic analysis of the main factors - quantity, time, apace and user " character, it can be conferred that it is not necessary for the four projects in the western areas to join together at present ; adding gate at the 2 head of lin jiacun trench can only help to relax the problem of lack of water in bao jixia irrigation area, to solve the problem of short of water in the irrigation area needs to take project measures at the trunk and branches of wei he river from lin jia village to the upper stream ; the mode of supplying water of the four projects in the western areas are all by gravity, they can only be supplied one way and ca n ' t be supplied each other

    通過分析研究認為:已實施的引馮濟羊工程和石頭河西安供水工程,是十分必要的和可行的;從水資源配置的主要要素? ?數量、時間、空間和用戶性質的綜合分析研究來看,西部四大工程目前尚無整體聯網的必要;林家村渠首加閘對解決寶雞峽塬上灌區缺水僅能起到緩解作用,從根本上解決塬上灌區的缺水問題,還必須從林家村以上渭河干支流上採取進一步的工程措施;西部四大工程均為重力供水,只能單補,而不能互補。
分享友人