trunk route 中文意思是什麼

trunk route 解釋
干線路由
  • trunk : n 1 樹干 (opp branch); 軀干,身軀。2 本體,主要部分;(河的)主流;(鐵道等的)干線;大血管,大...
  • route : n. 1. 路;路線,路程;航線。2. 【軍事】出發令,開拔令。vt. 1. 給…規定路線[次序,程序]。2. 由某一路線發送。
  1. Trunk roads including expressways are assigned route numbers

    公路干編號系統的詳細說明,見第
  2. Route 8 is a trunk road linking lantau and sha tin

    八號干線是一條連接大嶼山與沙田的主要道路。
  3. Mark rules of highway route name and number of national trunk highway

    公路路線標識規則國道名稱和編號
  4. Chongqing expressway networking toll data communication network cotains 2 - ring and 8 - ray network structure based on expressway physical structure, setting up a trasmission trunk layer of sdh stm - 4 ( can be up - graded to stm - 16 ), and channel protection business entry layer consisting of sdh onu / olt stm - 1 ( can be up - graded to stm - 4 ). data exchange layer, through ip route exchange network above sdh network, forms 3 - level computer network structure of account settlement center - road section management company - toll station. to ensure obtaining original and reliable toll data from communication network, 2m circuitous chain is established between each toll station, accountsettlement center and road section management company, and also pstn dialing backup chain is set up between toll station and account settlement center. in order to maintain clock synchronization of the whole communication network, a proposal of sub - stage clock sychrononization signal network for differet network construction scale has been put forward in this design. in view of sensitivity and importance of toll data, this design particularly gives considerations of network safety and information safety for external and internel of network. therefore, communication safety, smoothness and reliability of networking toll system can be able to maintained in many ways

    重慶高速公路聯網收費數據通信網的結構是根據高速公路的物理結構構築了2環8射的網狀結構,建立了以sdhstm - 4 (可升級到stm - 16 )的傳輸主幹層,以sdhonu / oltstm - 1 (可升級到stm - 4 )組成的通道保護業務接入層。數據的交換層是在sdh網之上的ip路由交換網,形成了結算中心-路段管理公司-收費站之間的3級計算機網路結構。為從通信網路上保證收費數據的原始性和可靠性,每個收費站和結算中心、路段管理公司之間建立了2m迂迴鏈路,同時在收費站和結算中心之間建立了pstn的撥號備份鏈路。
  5. The former tackles congestion of a specific area through charging while the cwb is a strategic trunk road which provides an alternative route for east - west traffic not destined for the central business district

    前者是在一特定地區內以收費方式去解決交通擠塞問題,後者則以繞道去改善跨區交通問題。
  6. The former tackles congestion of a specific area through charging while the cwb is a strategic trunk road which provides an alternative route for east - west traffic not destined for the central business district ( cbd )

    有建議指電子道路收費可以代替中環灣仔繞道;但兩者目的截然不同。前者是在一特定地區內以收費方式去解決交通擠塞問題,後者則以繞道去改善跨區交通問題。
  7. Route 2 - a direct link between kwun tong and east kowloon via the airport tunnel underneath the old kai tak airport runway. this route extends westward and runs on the western kowloon corridor linking west and north - west kowloon with tsuen wan and tuen mun in the west. the trunk road extends further north from tuen mun to yuen long via the yuen long highway

    二號干線-連接觀塘及九龍東部的幹道,途經舊機? ,然後向西伸延,經西九龍走廊,把西九龍和西北九龍與荃灣及屯門連接,並再由屯門經元朗公路向北伸展至元朗。
  8. Route 5 - a trunk road linking shatin with tsuen wan via the shing mun tunnel

    五號干線-連接沙田與荃灣的主幹道,途經城門隧道。
  9. Ss7 route resumed - ss7 trunk group is unblocked

    路由點有效,中繼組恢復正常。
  10. Route 6 - a trunk road connecting shatin with quarry bay via tate s cairn tunnel and the eastern harbour crossing

    六號干線-連接沙田與?魚涌的主幹道,途經大老山隧道及東區海底隧道。
分享友人