tube arrangement 中文意思是什麼

tube arrangement 解釋
管道布置
  • tube : n 1 管,筒;顏料管。2 管狀地下隧道;〈口語〉(倫敦的)地下鐵道。3 【炮】炮身;【汽鍋】鍋管;【解...
  • arrangement : n. 1. 整頓,整理;排列,布置,分類。2. 〈pl. 〉安排,料理,籌備,預備。3. 商定,約定。4. 調解,和解。5. 改作,改編;改編的樂曲。
  1. The technological innovation and optimum design were implemented by the design organization during the working drawing period, as a result, the new technology of separated floor for draft tube bend is applied, and the optimized arrangement plan of structure is more compact, the structure form is more rational, rate of progress is accelerated, about 1. 37 hundred million yuan is saved, which is of significant general benefits

    施工詳圖階段,設計單位根據創建節約型社會的宗旨,積極開展一系列技術創新和優化設計工作,並首創了廠房尾水管肘管段分離式底板新技術,優化設計后樞紐布置更加緊湊,建築物結構形式更為合理,加快了施工進度,節約工程投資約1 . 37億元,綜合效益顯著。
  2. The highest heat transfer coefficient for air flowing in the nine 3 - d ift with staggered arrangement fins is no9 tube

    過渡流區和層流區的熱力性能系數分別為2 . 74和1 . 06 。
  3. Through simulating model tests of shield tunnel passing through the yellew river in the diversion project from south to north china, a systematic analysis on the primary factors affecting joint stiffness, including arrangement of joint bolt, thickness of annular packing of bolt, behavior and thickness of cushion material between two tube plates, magnitude of prestressing force of joint bolt and different stressed states at tube plate joint etc., are performed. the study results may provide reference for tube plate design of shield tunnel

    通過南水北調穿黃盾構隧道模擬模型試驗,對影響接頭剛度的主要因素即連接螺栓的布置、螺栓墊圈的厚度、管片與管片之間墊層材料的性能和厚度、連接螺栓的預緊力的大小及管片接頭不同的受力狀態進行了系統的分析,為盾構隧道管片設計提供了參考。
  4. Abstract : through simulating model tests of shield tunnel passing through the yellew river in the diversion project from south to north china, a systematic analysis on the primary factors affecting joint stiffness, including arrangement of joint bolt, thickness of annular packing of bolt, behavior and thickness of cushion material between two tube plates, magnitude of prestressing force of joint bolt and different stressed states at tube plate joint etc., are performed. the study results may provide reference for tube plate design of shield tunnel

    文摘:通過南水北調穿黃盾構隧道模擬模型試驗,對影響接頭剛度的主要因素即連接螺栓的布置、螺栓墊圈的厚度、管片與管片之間墊層材料的性能和厚度、連接螺栓的預緊力的大小及管片接頭不同的受力狀態進行了系統的分析,為盾構隧道管片設計提供了參考。
  5. The curved surface analysis and reinforcement arrangement of bent draft - tube

    水電站彎曲型尾水管曲面分析與鋼筋布配
分享友人