underground site 中文意思是什麼

underground site 解釋
地下發射陣地
  • underground : adj 1 地(面)下的。2 隱蔽的,秘密的。3 (電影,報刊等)標新立異的,試刊的,試驗性而非正式的。4 ...
  • site : n 1 地點;位置;地基。2 場所,現場。3 遺址。4 【計算機】網站,站點〈電腦網路用戶的網站地址〉;萬...
  1. Gpr is a newly developed hi - tech survey technique used to detect shallow ground electric differences. we applied gpr to more than 100 projects in zhujiang river delta and hongkong, and obtained good reputations. the application scope involves stratigraphics division, outining of filled stones in the muddly beach, geotechnical prospecting of old wall, karst detecting in the limestone terrain, caving detecting, landslide and slop surveing, the division of wea - thering zone, onion weathering zone, fracture zone and fau - lted zone in the granite area, detecting of buried objects cable, metal nonmetal pipe, channel, air raid she - lter etc. underground in the urban city, archaeology, tracing of orebody, coal measures strata division, testing of the dam and grouting site, quality checking of the surface and foundation of the highway

    的一種高新技術。我公司運用世界最先進的探地雷達設備在珠江三角洲地區和香港開展了百余項探地雷達檢測項目,獲得了良好的聲譽,並被作為深圳市建設局1998年度建設科技成果推廣項目。它主要應用於:山體土石方檢測路基不同回填物界面檢測填海回填物巖溶檢測樁基無損檢測地下管道探測地下隱蔽物探測考古斜坡滑體探測地質結構探測湖底探測高速公路路面及路基檢測。
  2. September 1 - 5, the entire city of chong sprinkler will focus on the road, to clean the road, people flyover, underground walkways, transit site, the massive clean asking for the road, bridge, the walls see true colors

    9月1日? 5日,全市所有的沖灑水車將集中上路,清洗道路、人行天橋、地下通道、公交站點,這次大規模的清洗要求達到路面、橋面、墻面見本色。
  3. France detonated a fourth underground nuclear blast at its test site in the south pacific

    法國在南太平洋的試驗基地秘密引爆第四顆核彈。
  4. Assessment of site conditions is necessary to ascertain suitability for the mf method. these include geological conditions, underground water table levels and overlying soil thickness, and all other relevant factors

    (六)多圓形潛盾隧道之施工條件探討,對多圓形潛盾隧道工法之適用地質、覆土深度及其他限制條件需一併考量。
  5. 3 the permit holder shall conduct a rescue excavation at the archaeological site in ho chung valley, where underground cables will be laid

    許可證持有人須在蠔涌谷的考古地點(即將鋪設地底電纜的地方)進行搶修挖掘。
  6. The dissertation detailedly explains the engineering geology conditions of zhe gu mount tunnel area, and has researched the crustal stress development process and the regulation of distribution. according to mounts of site tracing investigations, author has researched the formation mechanism of wall rocks at zhe gu mount tunnel. on the base of engineer geology analysis, applying the modern support theory and construction conception of underground engineer, and combining with modern monitor technique and numerical simulation, has researched and discussed about support, forecast and information design - construct etc. three phase on large deformation " prevention

    本文詳細闡明了鷓鴣山隧道區工程地質條件,對隧道區地應力場演化過程及分佈規律進行了研究;基於大量的施工現場跟蹤調研,研究了鷓鴣山隧道圍巖大變形的形成機制;在工程地質分析的基礎上,運用地下工程現代支護理論和施工理念,結合現代監測技術和數值模擬方法,從大變形的支護、預測、信息化設計施工三個方面對大變形的防治進行了探討。
  7. Jiaxing crane - releasing garden 1 # 2 # 3 # 7 # building and underground garage. total construction area is 31200 sqms. 20 - floor high framework building. construction height is 69. 8 meters. jiaxing security and civilization templet construction site

    嘉興市放鶴洲花園1 # 2 # 3 # 7 #樓及地下車庫工程,總建築面積31200平方米,為20層框剪結構高層住宅樓,建築地面高度69 . 8米。該工程為浙江省文明施工標準化工地。
  8. The directional breaking blasting technology for underground development used in xishimen iron mine is described. a comprehensive summary is made of it which includes the test technology, the blasting parameters and the on - site application effect so as to provide precious experiences for other mines

    論述了西石門鐵礦井下掘進定向斷裂爆破技術,對其試驗工藝、爆破參數、現場應用效果等方面進行了全面總結,為其它礦山井下掘進提供了寶貴經驗。
  9. The mechanics of vacuum preloading was discussed by contrast of vacuum preloading and heaped preloading. the factors affecting the result of vacuum preloading for ground consolidation were as follows : the geological conditions of site, the intensity of vacuum pumping, the condition of underground water and installation of vertical drainage line. through analysis of these factors, some conceptions and design principles were proposed for vacuum preloading

    在此基礎上,通過堆載預壓與真空預壓的對比闡述了真空預壓加固地基機理,分析了影響真空預壓加固地基最終加固效果的各個因素:場地地質條件、抽真空作用強度、地下水賦存情況及豎向排水體的設置等。
  10. It will robotically dig to underground ice and run laboratory tests assessing whether the site could ever have been hospitable to microbial life

    它將會開鑿地下冰來實驗並探測曾經是否在此處有微生物或生命產生。
  11. On the basis of the site measurement, lab and numerical simulations, it is pointed out that there is usually a broken state zone existed around a deep excavation ; this zone has many special characteristics and is a comprehensive index to represent the action of both earth stress and rock mass strength on the stability of underground projects

    在現場實測、物理和數值模擬的基礎上,提出深埋地下工程的圍巖中普遍存在破裂狀態,並認為這一破裂狀態區域具有許多特殊的性質和規律,是一個反映地應力和巖體強度對地下工程穩定性作用的綜合指標。
  12. Nanyuan community center is located at the site where the nanhu road joins yingtian avenue, covering about 20, 000 sq. m. the center is composed of the mainbody and the podium building, with a combined floorage of 44, 127 sq. m. the center houses an underground parking lot which can contain 180 vehicles

    南苑社區中心位於南湖路與應天大街的交匯處,項目佔地29 . 3畝,總建築面積達44127平方米,由主樓與裙樓構成,並配有180個車位的地下停車場。
  13. If the underground water is used, the source of the underground water shall be at a distance of at least 15 meters away from the septic tank and waste pile - up site

    使用地下水者,其水源應與化糞池、廢棄物堆置場所等污染源保持至少十五公尺以上之距離。
  14. In london , if you have taken underground before you could see the yahoo answers web - site advertisement board

    為何我收到雅虎給我的回復是用中文或日文寫的呢?
  15. Study on the fire protection for underground site museum - fire protection design for exhibition hall of the outer - store - delve of hanyang emperor mausoleum

    陜西漢陽陵帝陵外藏坑保護展示廳設計
  16. Remember that the plans are used for reference only and a cable locator must always be used to identify the existence and alignment of the underground electricity cables in the works site or its vicinity

    請緊記:圖則僅供參考,必須經常以電纜探測器測定工地或附近地方是否有地下電纜存在,以及地下電纜的準線。
  17. What are the major land uses on criii ? a19. major land uses on criii include a wide waterfront promenade, the new star ferry piers and public piers, a " comprehensive development area " site for low to medium rise commercial development with pedestrian landscaped deck, a " government, institutional or community " site, some waterfront related commercial and leisure uses and key transport infrastructure including road p2 at grade, cwb underground, airport railway extended overrun tunnel and nil underground

    中區填海第三期工程所得土地的主要用途,包括寬闊的海濱長廊新的天星碼頭及公眾碼頭"綜合發展區"內的中低高度商業樓宇及園景行人平臺"政府機構或社區"用地與海傍有關的商業及休憩用地以及主要運輸基建設施包括p2道路網地面中環灣仔繞道地下機場鐵路掉車隧道的延部份及地鐵港島北線地下。
  18. The only site that draws a regular trickle of visitors is ta mok ' s concrete villa in the center of town, with its irrational maze of big, bare rooms and its underground bunker

    惟一能夠吸引固定觀光客的景點就是塔莫位於市中心的混凝土別墅,裏面大而無當的各個房間以毫無規則的方式彼此連接,地下室還有防空洞。
  19. Gpr was applied in the detection and location of underground artificial concrete base at hanyang yuehu and civil air defense at a building site of qingshan in wuhan city

    摘要運用探地雷達對武漢市漢陽區月湖一建築場地下人工混凝土基礎以及青山區某公寓建築場地地下人防工程進行探測定位。
  20. Steel fixed site pressurized lpg tanks with jacket for underground installation ; dimensions, equipment

    地下設備用帶護套的鋼制固定位置液化石油氣壓力容器
分享友人