underground work 中文意思是什麼

underground work 解釋
地下工程
  • underground : adj 1 地(面)下的。2 隱蔽的,秘密的。3 (電影,報刊等)標新立異的,試刊的,試驗性而非正式的。4 ...
  • work : n 1 工作,操作,勞動,作業;工件;功課;努力;行為,作用。2 (待辦的)事務,業務;職業。3 〈前有...
  1. Dr hill herself spent years trying to work out how prairie mole crickets, a highly territorial species of burrowing insect, manage to space themselves out underground

    希爾博士本人用了數年的時間,希望搞明白牧場蟋蟀這種領地特徵明顯的穴居昆蟲是如何在地下劃分領地的。
  2. When he was doing underground work he was arrested because a renegade informed against him.

    他做地下工作時,曾因叛徒告密而被捕。
  3. If provided with high pressure pump and water gun, it can make up a hydraulic mechanized earth work unit, used for ground leveling, dredging in rivers and pools, digging, excavation and transportation in small hydraulic engineering, as well as the air defense and underground project in cities

    若與高壓水泵,水槍配合,組成水力機械化土方工程機組,就可用作于土地平整,河道與池塘的疏浚、鑿開等小型水力工程的挖方與輸方,以及城市的防空工程,地下工程。
  4. With an aim to arouse public awareness on the protection of underground utilities ( gas, water, drains, power, telecom, etc ) and work safety in road excavation, a series of open competitions will be jointly organized by hong kong institute of utility surveyors ( hkius ), the hong kong the hong kong association for the advancement of science and technology ( hkaast ), and utilityinfo institute ( uti )

    為提高大眾市民保護地下設施(煤氣、水管、水渠、電纜、視訊等)及道路安全的認知,香港管線測量師學會、香港工程師學會安全工程專責事務委員會、香港科技協進會及香港工程網路資料管理中心現正聯辦一系列地下管線相關之大型公開比賽。
  5. It is difficult to analyze combined work of underground penstock due to the gap among steel lining, concrete lining and rock

    摘要埋藏式壓力鋼管設計中,鋼襯、混凝土襯圈和圍巖之間普遍存在著不連續的縫隙,致使設計計算時難以進行聯合受力分析。
  6. Kkl102 air refrigerator for mines application is used to lower tempdrature of underground coal mines, and it can decrease the temperature of mining work surface of 14 ? section from 32 to below 26 rapidly

    Kkl102礦用空氣製冷機用於降低地下煤礦工作面的溫度,能迅速將斷面為14 ?的掘進工作的溫度由32降到26以下。
  7. " the new images show more clearly the intensity and movement of rain echoes near hong kong which are useful for the monitoring of heavy rain and tropical cyclones. please keep up the good work ", from mr. clarence fong of the weather underground of hong kong

    地下天文臺方誌剛先生說:新的圖像更清楚顯示香港附近雨區的強度和走向,對監察大雨和熱帶氣旋很有幫助。
  8. The electricity design of 4 - star hotel of xu zhou hua mei mansion ( 29 stories on the surface and 2 stories underground, 60, 000m2 construction areas ) ( 2 ) the work - out of the electric equipment document for tenders of xin cheng heat - and - power plant. ( 3 ) the work - out of the feasibitity report of jeluk power palnt ( 2 125mw ) of pakistan

    徐州華美大廈四星級賓館(地面29層,地下二層,建築面積6萬平方米)的電氣設計工作沛縣新城熱電廠電氣設備招標文件的編制工作巴基斯坦傑魯克電廠( 2 125mw )可行性研究報告的編制工作。
  9. The business scope of tiandi science & technology co., ltd. are the product and sale of electricity product, mine electricity products ; the design and contract of underground project, coal cleaned and chosen project, coal comprehensive usage project, environmental protection project and net work project, mine construction and the design of production system, technology promotion, consultation, contract and service of external project

    簡介:天地科技股份有限公司主要技術和產品包括:採煤機,掘進機,全礦井綜合自動化系統,計算機軟體技術,礦井提升機自動化控制,煤礦裝車、配煤、計量自動控制系統,液壓支架電液控制系統,液壓支架設計與開發;煤炭洗選設備;煤礦建設項目的設計、咨詢和工程總承包,地下建設施工程,建築物加固技術與材料;煤炭開采,特殊採煤技術,煤礦錨桿支護成套技術與設備,工作面支護技術,綜采工作面自動監測技術。
  10. Years ago, scottish scientists studying in vitro fertilization were subjected to such intense criticism that they took their work underground, continuing it in seclusion until they had the technology perfected

    多年前,由於從事人工受精的蘇格蘭科學家面臨激烈的批評,他們把工作轉為地下,在隱蔽的地方繼續實驗,直至將這一技術完善。
  11. According to the documentation collected from domestic and abroad wang wei dong who works in huadong architect and structure institute utilizes the similar work property between the underground continuous wall and pile subjected the vertical loads, and introduces poulos method of elasticity and plastic which applies to pile foundation into the calculation for subsidence of underground continuous wall. pujialiu and yu yuzhou from water and electronic engineering of qinghua university, according to the result of three axes, define the concrete parameter utilize the model of non - linear e - b combined with the design cross section of dam in xiaolangdi, yellow river accept the total stress programme of thepd dam, and we analyze the stress and displacement of plastic concrete diaphragm wall by finite element method in comparison with the result of common concrete one. at same time, we consider the effect of the character of plastic concrete diaphragm wall which is composed of different gradients and adopting the level of stress and pulling stress infers whether the plastic concrete diaphragm wall is safe or not

    地下連續墻是一種歷史較短的施工方法,目前,砼防滲墻的設計還是以傳統的設計方法為主,根據查找國內外文獻資料,華東建築設計院王衛東利用地下連續墻與樁在豎向荷載作用下的工作性能有相似性,將適用於樁基的poulos彈性理論引入對地下連續墻的沉降計算中;清華大學水利水電工程系濮家騮、于玉貞根據三軸試驗結果確定混凝土的參數,利用非線性e - b模型,結合黃河小浪底土石壩設計剖面,採用thepd土石壩總應力程序,對深覆蓋層塑性混凝土防滲墻的應力、位移進行有限元分析,並與普通混凝土防滲墻計算結果加以對比,同時分析了不同配比塑性混凝土特性的影響,並採用應力水平和拉應力數值來判斷塑性混凝土防滲墻的安全程度。
  12. As a whole, the research work of this dissertation can be summarized as follows : ( 1 ) based on the porous media elastic unstable theory, the interfering well flow model of soft soil two - layer structure underground confined water is inferred, and consequently, the basic dewatering calculation method of soft - soil two - layer deep excavation dewatering is inferred

    具體研究內容如下: (一)從彈性多孔介質滲流理論出發,推導出二元結構承壓含水層群井干擾穩定流模型,進而導出軟土地區二元結構地層深基坑降水的基本計算方法。
  13. With the rapidly development of minefield and the rapidly increase of coal output, the excavation scope and depth will extremely rise, the excavation work is under the overlying by the thin rock strata, and under the thick loose bed, the population in mine field will be more and more, the relevant basic industries will also develop rapidly. the mines will discharge more water from the underground, and the production and living will also consume more water. so the original water resource balance system in the minefield will be broken, the ecological environment formed by the nature will be destroyed in some degree

    隨著礦區迅速發展而煤炭產量的快速增長,既定在薄基巖厚鬆散層下的神東煤田開采范圍和深度勢必急劇增大,相應的人口也增加,與其相匹配的其它基礎工業一併迅猛發展,導致礦井外排水和生產生活用水直線猛增,這一系列生產和生活巨量用水必然會打破礦區原始的水資源平衡體系,不同程度的破壞自然形成的脆弱的生態環境。
  14. In order to make the studying about the seismic exploration method possess systematic nature and the ability of tackling key problem in front - zone of mountain, we have done the research work of tackling key problem aiming at the field gathering technology of seismic exploration of the complicated structure belt ( the construction of underground and the earth ' s surface condition are complicated ) of front - zone of mountain in this text, and a large number of relativity trials by the close combination of production and scientific research, summarized a set of field method of the complicated structure belt of front - zone of mountain, adjusted both of trial factor and construction factor of the field gathering in time, achieved finally the goal of making its structure character clear

    近幾年來,隨著地震勘探裝備和技術的改進,野外資料採集技術有了新的進展,主要表現為多種震源聯合激發方法(井炮和大噸位可控震源) ,基於地表條件及表層調查基礎上的激發選點方法,小道距、長排列、高覆蓋接收方法,基於模型的「分段、分線、分區」觀測系統目標設計方法等,取得了顯著的勘探效果。為了使山前地震勘探方法研究具有系統性和攻關性,通過本文對復雜山前復雜構造帶地震勘探的野外採集技術進行攻關研究,進行了大量具有針對性的試驗,總結出了一套山前復雜構造帶野外施工方法,最終達到了搞清復雜山前復雜構造帶山前復雜構造帶構造特徵的目的。
  15. Article 17 mining enterprises inspect the poisonous and harmful substances at the work sites and the percentage of oxygen in underground air to ensure that they meet safety requirements

    第十七條礦山企業必須對作業場所中的有毒有害物質和井下空氣含氧量進行檢測,保證符合安全要求。
  16. No young person shall be employed to work underground in any mine or quarry or in any industrial undertaking involving a tunnelling operation

    任何人不得僱用青年在礦場或石礦場進行地底工作,亦不得在工業經營內擔任涉及開挖隧道的工作。
  17. Underground work in mines and quarries or in industrial undertakings involving tunnelling operations, and carrying loads unreasonably heavy for the young person s age and physical development are prohibited

    禁止青年在?場或石礦場從事地底工作,或在工業經營內擔任涉及開掘隧道的工作,以及搬動對他們的年齡和體格來說,屬過重的物品。
  18. Brief discussion on construction technical specification of underground work excavation in hydraulic engineering

    淺議水工建築物地下開挖工程施工技術規范
  19. Article 29 mining enterprises may not recruit adolescents to engage in underground work

    第二十九條礦山企業不得錄用未成年人從事礦山井下勞動。
  20. Medical examination of young persons ( underground work ) convention, geneva, 23. 6. 1965 ( ilc no. 124 )

    1965年6月23日在日內瓦通過的《青年體格檢查(井下作業)公約》 (第124號公約)
分享友人