  1. Oct. 2006 - may. 2007, join building construction of 8 tricro stynene unit of joint investment by huabei petroleum administration bureau, act as piping engineer and in charge of hydro test work

    2006年10月至2007年5月,參加華北石油管理局投資的8萬噸/年苯乙烯新建工程施工,整個施工過程擔任工藝管道安裝工程師,同時負責試壓工作。
  2. The example evaluating the ability of the unit in charge of construction proved that the method is scientific and feasible

    通過對施工單位能力評價的實例演示,證明了該方法的科學性和可行性。
  3. Article 29 the unit in charge of a construction project which may produce environmental noise pollution due to the use of machines and other equipment, must report, 15 days before commencement of construction, to the competent administrative department for environmental protection of the local people ' s government at or above the county level the name of the project, the construction site, the length of time needed for completion of the project, the possible level of environmental noise and the measures taken for prevention and control of such pollution

    第二十九條在城市市區范圍內,建築施工過程中使用機械設備,可能產生環境噪聲污染的,施工單位必須在工程開工十五日以前向工程所在地縣級以上地方人民政府環境保護行政主管部門申報該工程的項目名稱、施工場所和期限、可能產生的環境噪聲值以及所採取的環境噪聲污染防治措施的情況。
  4. Jul. 2006 - sept. 2006, join rebuilding and repairing construction of atmospheric pressure unit in huabei petrochemical corporation, act as piping engineer and in charge of hydro test work

    2006年4月至9月,參加華北石化公司常壓裝置的改造及檢修工程,擔任工藝管道安裝工程師,同時負責試壓吹掃工作。
  5. Ignore and construct issue of quality testing the reasons in many aspects have : on one hand, engineering construction square quality - mind thin, paying special attention to progress, take benefit simply ; on the other hand, the traditional detection method taking pressing water as main means, because its is time - consuming, strenuous, influences the construction speed, high characteristic of fabrication cost, make the unit in charge of construction and owner all unwilling to carry on the quality testing work

    忽視施工質量檢測的問題存在多方面的原因:一方面,工程建設方質量意識淡薄,一味的抓進度、要效益;另一方面,以壓水試驗為主要手段的傳統檢測方法,因其費時、費力、影響施工進度、造價高等特點,使施工單位和業主都不願意進行質量檢測工作。
  6. In the new managerial system, the department in charge is responsible for the mandatory management and supervision of construction unit, building section and construction control unit in the macro field. otherwise, the lareral administration by entrustment is executed by construction unit, building section and construction control unit in the micro field. the system of engineering supervision finds itself in an important position

    新型工程項目建設管理系統將政府主管部門放到了宏觀監督管理的位置,對建設單位,施工單位和監理單位實施縱向的強制性的宏觀監督管理,同時在直接參與項目建設的建設單位、監理單位與施工單位之間又存在橫向的委託性的微觀監督管理,工程項目建設管理系統中的建設監理系統在其中居於核心地位,這種宏觀與微觀相結合的工程建設項目監督管理體制,給我國工程建設領域帶來深刻的變化,有利地促進了工程建設按所要求的目標順利地進行。
  7. Construction item manager play a major role on setting up organization of project team, he is the center of construction item administering, and comprehensive implementor of project object, must in charge of outcome object of construction unit, as well as with responsibility for enterprise efficiency object, construction item manager s consequence also establish his special duty, power, benefit, construction item manager should use rights reasonably, perform his own duty strictly, set up high performance organization, manage project scientifically, finish item object successfully

    在組建項目組織時,施工項目經理佔有舉足輕重的地位,他還是施工項目管理的中心,是項目目標的全面實現者,即要對建設單位的成果性目標負責,又要對企業效率性目標負責,施工項目經理重要的地位也確定了其特殊的責、權、利,施工項目經理應合理地使用權力,嚴格地履行自己的職責,建立高效的組織機構,對項目進行管理,完成項目目標。