unit loading 中文意思是什麼

unit loading 解釋
單位負荷
  • unit : n 1 個體,一個,一人。2 (計值、組織、機構)單位;單元;小組,分部;【軍事】部隊;分隊。3 【機械...
  • loading : n. 1. 裝貨。2. 裝載量;重量;載荷;(船隻等的)貨載。 3. 填充物,填料。4. 額外人壽保險。
  1. Safety of woodworking machines - circular sawing machines - single blade edging circular rip sawing machines with power driven saw unit and manual loading and or unloading

    木工機械的安全性.圓盤鋸床.帶電動鋸裝置和手工裝料或卸料的單刃刮刀鋸鋸床
  2. Safety of woodworking machines - circular sawing machines - part 8 : single blade edging rip sawing machines with power driven saw unit and manual loading and or unloading ; german version en 1870 - 8 : 2001

    木工機械安全性.圓盤鋸床.第8部分:帶電動鋸手工裝卸
  3. Safety of woodworking machines - circular sewing machines - part 8 : single blade edging circular rip sawing machine with power driven saw unit manual loading and or unloading

    木工機械安全.圓形鋸床.第8部分:帶動力驅動裝置人工裝載或卸載單鋸條粗齒圓鋸床
  4. For a unit of projected area, the loading on a telephone pole or a smokestack will be less than on an i-beam.

    對一個單位面積來說,電線桿或煙囪上的荷載要比工字架上的荷載小。
  5. Besides, this paper adopts the random finite element method, uses geometric and physical mechanical parameters that are relevant to lining weight of surrounding rock, coefficient of lateral pressure, height or buried depth of vertical loading, elastic resistance coefficients of surrounding rock, elastic modulus of support structure, unit weight of concrete, thickness of the structure as well as torsional strength and compression strength of concrete and etc., as random variables, applies the monte - carlo method to sampling by computer, preliminarily evaluates the reliability of bearing capacity and stability of molded concrete lining of the xuefeng mountain tunnel, and obtains the related displacement of the lining, mean value and variance of internal force, and computed the reliability index of lining structures

    此外,本文採用隨機有限元方法,將圍巖容重、側壓力系數、垂直荷載高度或埋深、圍巖的彈性抗力系數、支護結構的彈性模量、混凝土容重、結構的厚度以及混凝土的抗扭與抗壓強度等與襯砌結構有關的幾何與物理力學參數作為隨機變量,應用蒙特卡洛理論進行計算機隨機取樣,對雪峰山隧道模注混凝土襯砌的承載力與穩定性的可靠度進行了初步評估,得出了襯砌的相關位移與內力的均值和方差,並計算出了相應的襯砌結構可靠指標。
  6. To minimize pilferage and quality loss we have guar gum stuffing in - house unit for directly loading into containers

    為盡可能減少偷盜和質量損失,我們設有瓜爾膠填裝室內裝置,直接將產品裝入集裝箱中。
  7. Plate loading from front and back of unit for true variable resistance

    -鈴片產生的阻力可選擇前置或後置。
  8. The second part analyzes the components of the dock loading and unloading system, and the relationships between each component. furthermore, it distinguishes between junior factors and senior factors, between external variables and internal variables, and grasps main factors for further research. the third part analyzes the constitution of efficiency and variable cost of machinery, and gives formulas to calculate the efficiency, as well as the unit cost of dock machinery

    第二章分析了天津港碼頭裝卸船作業系統,確定了系統中的影響要素變量,及其要素間的相互關系,區分了主要變量和次要變量、內生變量和外生變量,從而抓住主要的、內生的要素變量,在次要的、外生的要素變量保持不變的假設前提下,簡化系統的研究范圍和難度。
  9. Generally, the letter of credit specifies the beneficiary ' s name, description of good, quantity, unit price, total amount, ports of loading and destination, price terms, payment terms, shipping validity, negotiation validity, etc

    一般信用證中規定了受益人的姓名、貨描、數量、單價、總金額、起運港、目的港、價格術語、付款方式、裝運期限、議付期限等。
  10. The more than 700 employees of the fam group combine the know - how for bulk materials handling, mining systems, stockyard systems, mineral processing, loading systems, conveying systems, port technology and unit loads handling

    Fam集團擁有在散狀物料輸送系統、采礦系統、堆料系統、物料處理系統、裝卸系統、輸送系統、港口系統及裝車站等方面的技術優勢。
  11. This paper sets up the concept of the proportion of unloading and the relative proportion of unloading, sets up a mathematical pattern for the using of the packing materials on the base of the relative proportion of unloading. meanwhile we can design the packing dimension of the compressive wood piece, and it points out that per unit loading of the track pattern packing plan is the largest. the proportion of per loading has increased by 116. 6 % over that not compressing, and 30. 64 % over cylinder packing

    本文建立了空裝率和相對空裝率的概念,並利用相對空裝率,對包裝物的材料利用程度建立了一種數學模型,提出了計算方法,同時據此設計木片壓實裝袋打包尺寸,指出跑道形包裝方案的單位裝載量最大,與未壓縮裝袋相比提高單位裝載率116 . 62 ,與長方體裝袋相比提高單位裝載率30 . 64 ,並可以充分利用c60火車的額定運載能力。
  12. Based on analyzing kinematics of the spindle unit under loading, the mathematical models of rigid and flexible rotor system are established

    本文在分析主動磁軸承工作原理的基礎上,分別建立了剛性、柔性轉子系統的數學模型。
  13. Loading tension force for supply and takingup unit, openning purge valve ( spray valve and gun valve ) and starting the cleaning buttom

    加載供線及收線系統張緊力,打開清洗閥(噴洗閥及槍閥) ,啟動清洗按鍵。
  14. As the main method of measurement in the tests, some strain measuring points are arranged on the reinforced steel bars of the anchor bearing body. the changes of strain with different loading levels at their locations have been measured, through which range of influence and distribution of strain with loading in grout can be investigated, and corresponding distributions of axial force and bond stress are calculated according to hooke ' s law. making use of nonlinear curve fitting, distribution equation of bond stress of the fixed unit anchor length is achieved

    試驗測試手段通過在錨索承載體上布設應變測點,觀測錨索在不同的荷載級別下的應變變化情況,對不同荷載級別下,單元錨索注漿體內應變的影響范圍及分佈規律展開分析,依據虎克定律計算出了其軸力與粘結應力的分佈;並對測試結果進行了擬合,得出了錨固段粘結應力分佈的擬合方程。
  15. Read the loading in watts per square unit of radiating surface that can be applied to the element

    知道了能應用到硅碳棒的每平方單元輻射面積所能負荷的能量。
  16. The analysis includes total cost, unit cost, loading and unloading costs in terms of cargo category and that in terms of domestic and outbound cargo in this chapter

    分別對總成本、單位成本、分貨種裝卸成本和內外貿貨物裝卸成本進行了分析。
  17. Name, quality, unit price and amount of goods, ports of loading and destination, price and payment terms, shipping documents, latest shipment date and validity of the l / c

    商品的品名,數量,單價和種類,裝貨港和目的地,和付款條件,裝船單據,最後裝運期和到目的地的有效期。
  18. T : name, quality, unit price, amount of goods, port of loading and destination, price and payment terms, shipping documents, latest shipment date and validity of the l / c

    商品的品名,數量,單價和種類,裝貨港和目的地,價格和付款條件,裝船單據,最後裝運期和到目的地的有效期。
  19. We taking the factor of generating heat - the multiple value pv of the loading of unit area p and the surface linear velocity v to determine the using limit

    一般情況下,我們用產生發熱的因素單位面積的負載p和表面線速度v的乘積pv值來決定使用的極限。
  20. Empty uld release time - the waiting time of a trucker, after submitted unit release form at the uld collection points, to receive the first empty unit loading device

    提取空置貨箱時間-貨車司機在貨箱收集點遞交發放貨箱表后至提取第一個空置貨箱的處理時間。
分享友人