update project 中文意思是什麼

update project 解釋
更新工程
  • update : vt. 〈美國〉(通過修訂、增補)使(書等)成為最新式的[現代化的],使(書等)與(當前條件)相適應。n. 【自動化】(供電子計算機使用的)最新情報。
  • project : vt 1 投擲,拋出;發射(炮彈等);噴射。2 使突出,使凸出。3 設計,規劃,計劃,打算,籌劃。4 投影;...
  1. Analyze and update monthly profit, cooperate closely with project manager, financial, warehousing and the transport team to ensure the financial data unerring

    對項目每月利潤分析更新,密切與項目經理,公司財務,公司倉庫,車隊合作,確保公司的財務數據準確無誤
  2. Microsoft project continues to update the schedule as needed, keeps track of deadline dates, and shows an indicator if a task finishes after its deadline

    Microsoftproject會在必要時不斷更新日程、跟蹤期限並且在完成於期限之後的任務后顯示一個「標記」 。
  3. This is part of the on going training program to update the skills and knowledge of local extension workers based on the pilot project design report

    這是正在進行的培訓項目的一部分,當地推廣人員以示範項目設計報告為依準來更新技術和知識。
  4. Through this project, it will improve the development ability of our country " s medical diagnose facilities and softwares. especially, it should have more significance to update old equipments

    項目通過合作研究、開發和生產,能夠提高我國醫療診斷設備及軟體的研製水平,特別是對舊設備的數字化升級改造,更具有現實意義,並以此來提高醫院的診治水平。
  5. It is recommended that you install this update for microsoft project 2000

    建議microsoft project 2000的用戶安裝本更新。
  6. Aim at the current practical situation, a kind design procedure is presented on terminal which based on arm and c / os -, and selects the arm microprocessor and operating system combine with the demand of the subject. it designs the hardware system based on the lpc2124 and the periphery interface chipset, and implements the transplantation of c / os - on the lpc2124, compiles the hardware drivers and the api based on c / os -, the system introduces multitask based on dispatching priority to solve the disadvantage of the foreground / background system. a kind of project on remote update software based on gprs and iap is presented, and discusses the reliability in the end

    針對目前實際情況,在研究了終端設計多項技術的基礎上,設計了一種基於arm和c / os -的配變監控終端,結合課題的要求對arm處理器和操作系統進行了具體選型,在基於lpc2124的mcu和外圍介面晶元上,進行了終端硬體系統的設計;實現了cos -在lpc2124mcu上的移植;編寫了基於c / os -的api介面函數和底層硬體驅動程序;採用多任務按優先權調度的方式解決了任務處理的實時性,克服了傳統前後臺軟體在復雜的監控終端設計中實時性差的問題;針對終端軟體升級方案進行了探討,提出了一種基於gprs網路的遠程在應用編程( iap )的軟體升級方案,對終端軟體升級模塊進行了軟、硬體設計,並對升級方案的可靠性進行了探討。
  7. You use this information to update the overall plan for the project and to develop detailed plans for the next iteration

    你使用這些信息來更新項目計劃並為下一次迭代開發更詳細的計劃。
  8. Supervision and consultation projects completed : ( 1 ) jiangsu xindadou square ( 50, 000m2, two 30 - story buildings ), worked as chief supervision engineer ( consultation ) ; ( 2 ) " yanqiao overpass service center of xicheng highway ( the first overpass type service center on highway in china ), worked as chief supervision engineer ( consultation ) ; ( 3 ) the ninth 5 - year - plan updating technology project of huaiyin tobacco plant, 50, 000m2, worked as chief ( supervision and consultation ) ; ( 4 ) the softy testing, analysis and consultations of nanjing international conference and exhibition center, site - erected structure, 75m span steel roof truss ( the largest one in china ), worked as chief of test and consultation ; ( 5 ) " the consultation service of the testing, analysis and update technology of the reliability of the joints of intermediate floor slabs, beams and columns of base beam of sanshanjie station of nanjing metro " etc

    完成"江蘇新大都廣場( 5萬多平方米,二幢30層) "建設監理咨詢(總監) ; "錫澄高速堰橋跨線服務區(國內首座) "建設監理咨詢(總負責) ; "淮陰卷煙廠9 . 5技改項目( 5萬多平方米) "建築監理咨詢(總負責) ;主持了"南京國際會展中心75m跨鋼屋架(國內最大距)現場施工安裝結構安全性測試分析咨詢" ; "南京地鐵三山街站中樓板及底板樑柱節點構造技術安全可靠性的測試分析與技術改進咨詢服務"等項目。
  9. By using query optimization, database index, middle base and automatic data update technique, the dw project is very successful. the academic design, the method of implement and the future of insurance industry data warehousing are introduced

    通過運用查詢優化技術、數據倉庫索引技術、帶中間庫的三層結構和數據倉庫數據自動更新方案成功地建立了大連人壽保險業務數據倉庫系統。
  10. If you have previously installed project server sp2, sp2a replaces that update

    如果您以前安裝了project server sp2 , sp2a會直接替代該更新。
  11. Workgroup members using microsoft project central can view and update task information in the timesheet

    使用microsoftprojectcentral的工作組成員可以在時間表中查看和更新任務信息。
  12. If you link project information into a report you create using microsoft word, you can update that report automatically

    將項目信息鏈接到microsoftword創建的報表中,可自動更新該報表。
  13. This paper introduces a project of the wireless data transferring and the realization of speech encoding / decoding arithmetic based on the embedded system. in embedded system based on arm ? cpu, we accomplished the update of the system data by using the paging system, and emphatically researched how to avoid bit error. and, realizes the speech compression and decompression based on itu - t g. 729a, implement the speech synthesize of personal paging

    在以arm7為處理器內核的嵌入式系統上,通過尋呼系統實現了系統數據的無線動態更新,重點解決了尋呼誤碼造成的數據錯誤等問題;以itu ? tg . 729a語音編解碼標準為基礎,通過語音壓縮與解壓演算法實現了個人尋呼的語音合成。
  14. Set - up project planning at project start - up to determine the critical project parts to guide project engineering abroad, drafting, purchasing, and manufacturing. weekly update necessary for all projects

    就項目制定嚴格的項目計劃,指導項目的開展及實施;完成每周必須的項目更新報告。
  15. Status reports do not contain numerical information and cannot be used to directly update the project file

    狀態報告不包含數字信息因而不能用於直接更新項目文件。
  16. To update project information after each save

    如果要在每次保存時都更新項目信息:
  17. To update project information manually

    如果要手動更新項目信息:
  18. 3. to update your project file, click update project

    3 .要更新項目文件,請單擊「更新項目」按鈕。
  19. 2. select the update project information to microsoft project central server after every save check box

    2 .選中「每次保存時都更新microsoftprojectcentral服務器上的項目信息」復選框。
  20. On the tools menu, point to workgroup, and then click update project to microsoft project central server

    指向「工具」菜單上的「工作組」子菜單,然後單擊「更新web服務器上的項目信息」命令。
分享友人