upper current 中文意思是什麼

upper current 解釋
高空流
  • upper : adj 1 (更)上面的,上方的,上部的;較高的;上級的;(議會)上院的;(衣服)穿在外面的。2 上流的...
  • current : adj. 1. 通用的,流行的。2. 現在的,現時的,當時的。3. 流暢的;草寫的。n. 1. 水流;氣流;電流。2. 思潮,潮流;趨勢,傾向。3. 進行,過程。
  1. In this paper, ackerman steering linkage of double - wishbone suspension is taken as the study object, choosing the splitting joint and steering lever joint to carry out the design of optimization the mathematics models are established based on the multi - body system dynamics, applying its analysis method of kinematics to study the mechanism kinetic principles owing to more spatial factors considered, and calling off many hypotheses affecting the accuracy, compared with the traditional methods, the models are better to reflect the realistic motion principles, the results are more exact and applicable moreover, the force analysis is applied to the conduct mechanism the analysis method of dynamics in the multi - body dynamics is applied to study the forces applied on every component, working out the constraint reaction force of up and down ball joints, and developing the current computation program in the end, produce the upper wishbone geometry model in the ansys software package, meshing and carrying out the fea, testifying if the intensity of the wishbone meet with the requirements

    本文以雙橫臂獨立懸架的轉向傳動機構作為研究對象,選擇對斷開點和節臂球銷的位置進行優化設計,在此基礎上建立了基於多體系統動力學的導向機構和轉向傳動機構的數學模型,運用該學科的運動學分析方法研究機構的運動規律,編制了通用優化設計軟體。由於考慮了更多的空間因素,取消許多影響準確性的假設,因此建立的數學模型與傳統的方法相比更能反映實際運動規律,得到的優化結果也更加精確實用。此外,本文還針對導向機構進行受力分析,在建立該機構的空間動力學模型后,運用多體動力學中的動力學分析方法研究各個桿件的受力,計算出上下球鉸的約束反力,並開發出了相應的通用計算程序。
  2. Liberation of hydrogen gas would be increased rapidly and sic particles on the surface might be dispersed if the current density exceed the upper limit. furthermore, nickelous hydroxide would be deposited because the ph of plating solution nearby the surface rapidly increased. all of above might result in coating deterioration

    若電流密度過大,超過所允許的上限值,會析出大量的氫氣,可能沖散表面覆蓋的sic微粒,而且易使磨頭表面鍍液ph值急劇上升而形成氫氧化鎳沉澱,導致鍍層質量惡化。
  3. First, passive resistance network was selected as direct current biasing network, which offered direct voltage for base through the resistance voltage divider composed of two resistances, among them the upper resistance connected from the dc to base, the lower resistance connected from the base to ground. the collector connected with dc directly

    直流偏置網路採用無源電阻網路,通過由兩個電阻組成的電阻分壓器為基極提供直流電壓,上偏電阻從電源串聯到基極,下偏電阻從基極到地,集電極直接加電。
  4. The paper describes the implementation method of the software and hardware in detail ; explains the sulphuration technology in production of rubber and how to control sulphuration machine by plc ; discusses the principle, current situation and development trend of the dcs ; recommends the serial communication in industrial and how to realize it in delphi ; analyzes the communication protocols of series of lg ' s master - k10 plc and on the base of which, realized the communication between upper - computer and low computer ; discusses the realization flows of control system on upper - computer in detail, the software and hardware of module every design ; introduces the functions and realization of query software on client computer

    詳細論述了控制系統硬體及軟體的實現方法;闡述了橡膠生產中的硫化工藝以及如何用plc對硫化機進行程序控制;討論了集散控制系統的原理、研究現狀及發展趨勢;介紹了工業控制領域中的串列通信以及如何在delphi中實現串口通信;分析了lg公司master - k10系列plc的通信協議,並在此基礎上實現了上位機與下位機的通信;詳細討論了上位機控制系統的實現流程、各模塊的軟硬體設計;詳細介紹了客戶端查詢軟體的功能及實現。
  5. After the ventilator is started, the dust catcher is under negative state and will absorb air with dust in the ductwork to the case on the dust catcher, then the air current will enter into the upper side of filter bag flowing from upper side to lower part ; most of the dust will come out from the filter bag under function of gravity and inertia and then fall into the lower case ( ash hopper ), then the clean air will enter into the air via ventilator

    當通風機啟動后,除塵器便處于負壓狀態,並將余風管中的含塵空氣吸入到除塵器上箱體內,然後氣流進入濾袋上口自上而下流動,多數粉塵顆粒在重力和慣性力的作用下穿出濾袋下口,沉降至下箱體內(灰斗) ,被濾的凈化氣體經通風機排入大氣中。
  6. The gravity events include slumping event and turbidity - current event, and the gravity event deposits were developed in deep - water carbonate rocks in the upper sinian

    重力事件可分為滑塌事件和濁流事件,其沉積產物均分佈於上震旦統,夾在大套的深水碳酸鹽巖中。
  7. According to the diverse current state of a tilting gate, the flux calculation program was worked out to calculate the flux at different current state of the gate and to protract the curves of flux to upper reaches of the gate

    根據翻板閘門的不同水流流態,編制過閘流量計算程序,計算各流態的過閘流量,並繪制了過閘流量與上游水位關系曲線。
  8. For the particularity of the freezing freight transportation, there are many problems existing in the less container load transportation process and there is very high demand to a serious of services in the freights " loading, transportation and removing - picking up the goods. but the upper respond will be gotten if the deal is proper. on the basis of my own experiences in 6 years and the discussion with the professions, the writer expound some problems which would be regarded in the freezing less container load execution and some measures which can settle current problems, and wish the agencies which want to operate the freezing container and less container load business between dalian and japan can get some assists

    由於冷藏貨物運輸的特殊性,在拼箱運輸過程中存在很多問題,對貨物的裝載、運輸、拆箱提貨一條龍的服務部有非常高的要求,但如果經營得當會有較高的回報,筆者在本文中結合實踐經驗和與同行的探討詳細闡述了冷藏拼箱的實施中應該注意的一些問題和解決目前存在問題的一些對策,希望能對經營大連-日本航線冷藏集裝箱拼箱業務的貨代會有一些幫助。
  9. The sediment of tidal flat affect tidal creek greatly too, especially affect the development of curve current of tidal creek. on the upper tidal flat, the clay is abundance, and the sediment is much more viscous, so the curve current develops well

    灘面沉積物的組成對潮溝的發育也有較大的影響,尤其是潮溝曲流的發育,愈向潮灘的上部,粘土的含量愈多,沉積物的粘結作用也越強,潮溝越易發育曲流。
  10. According to negative temperature coefficient of vbe and positive temperature coefficient of vt, a framework of band - gap voltage reference is investigated. the reference offer a source of pir, distributed three voltage, one as upper - threshold voltage of dual - threshold comparator, the other as lower - threshold voltage of comparator, the other as direct current voltage for second band - pass filter amplifier

    同時利用pnp晶體管發射結電壓的負溫度特性和發射結差值電壓的正溫度特性設計了一個帶隙基準電壓源。此帶隙基準電壓源本身作為熱釋電紅外傳感器的電源電壓,同時分壓提供雙限電壓比較器的上限電平和下限電平以及第二級帶通濾波放大器的直流電平。
  11. The content of this theme is as follows : without time, without open, without stopping railway transport, and without interrupting traction current of block tested, meanwhile track circuit parameters in electrical and no electrical blocks is measured of on - line, dynamic and real - time. these parameters include voltage of fsk signal, voltage of industrial and harmonic wave interference, upper frequency, lower frequency, carrier frequency and low frequency 18 messages frequency

    本課題研究內容:在不要點,不開天窗,不中斷行車,不中斷被測區段牽引電流的情況下,在線、動態、實時測量電化區段和非電化區段的移頻信號電壓、工頻干擾電壓,移頻信號(調頻信號)的上邊頻、下邊頻、載波頻率、以及低頻18信息頻率等參數。
  12. It also has perfect functions of rated voltage, rated current, rated power and rated resistance, remote measurement, short - circuit measurement, battery measurement, dynamic measurement, and upper engine ' s software control

    其完善的定電壓,定電流,定功率,定電阻功能,遠端測量,短路測試,電池測試,動態測試及上位機軟體控制等功能讓您獲得一機多用的實惠與方便。
  13. Fifty concrete filled thin - walled steel tubular stub columns were axially tested, where diameter ( width ) to thickness ratio was selected as the main varied parameter. the behaviour of concrete filled thin - walled steel tubular stub column was analyzed, and the simplified calculation method of bearing capacity was discussed. based on the current test results and those reported in the literature, the upper limits of d / t and b / t of cfst members were recommended

    以截面徑(寬)厚比為基本參數,進行了50個薄壁鋼管混凝土軸壓力學性能的實驗研究,考察了薄壁鋼管混凝土的軸壓力學性能,並對其軸壓強度的計算方法進行了探討,基於本文和其他研究者的實驗結果,建議了鋼管混凝土構件截面合理的徑(寬)厚比限值。
  14. But, the current plc products do not have the function to automatically obtain and store the experts " knowledge, and the program language which is adopted ca n ' t complete the computing and reasoning, therefore we adopt the diagnosis configuration which is made up of plc and upper computer in the fault diagnosis of the baggage transfering system

    但是,由於目前的plc產品不具備自動獲取和存儲專家知識的功能,所採用的編程語言無法完成計算推理功能,所以在行李中轉系統故障診斷中採用的是以上位計算機和plc構成的故障診斷結構。
  15. To control the settlement of roadbed, the degree of compaction regulated by current criterion is not enough, the mechanics parameter of filler compacted - - deformation parameter should be considered and dual control criterion should be put in practice. to get upper deformation parameter of xigeda stratum filler, the percentage of mudstone should be controlled. the thickness of filling layer regulated by current criterion can be increased if the compaction car has proper function

    通過此次研究,獲得了對路堤變形問題的新的認識,即為了控制路堤的沉降變形,不僅應滿足現行規范中規定的壓實度標準,還應該引入填料壓實后的力學參數? ?變形模量值標準,實行雙重控制標準,而對于昔格達地層這種混合填料,為了獲得較大的模量值,應該控制填料中泥巖的含量;現行公路路基施工規范中對路堤填築時分層填築厚度的規定值,在壓實機具功能滿足的條件下,可以適當提高。
  16. Make a comprehensive view of all study results about the flood channel, a model of formation and evolution of the flood channels was proposed. according to this model, not all flood channels formed by ebb channels divided by sand spit develop toward death, some of them may be keeping the current situation or transform to the reserve channel with the change of runoff and sediment concentration from upper reach

    用gis方法計算1861 - 2002年新橋水道區域的沖淤變化,可定量表達漲潮槽在不同時間尺度形成演化規律,結合漲潮槽巖芯沉積物垂向的沉積特性變化,可闡明漲潮槽的形成機理與演化過程,並提出不同種類型漲潮槽的形成演化模式。
  17. This article is concerned with a summary of the implication, principle, current states and development strategics of developing non - timber product forest crops in constructing the shelterbelt of the changjiang river by investigating the construction of the shelterbelt in the upper and middle peaches of the changjiang river in hunan, huber, jiangxi and anhui province and analysing the soc - economic condition in this areas

    通過對湖南、湖北、江西、安徽等省長防林建設的實地考察,結合對當地自然社會經濟條件的分析,對長防林建設過程中發展經濟林的意義、應遵循的原則、存在的問題及發展策略進行了全面的分析。
  18. The definition, the essential, the orietation model and eleven kinds of functions of mes was dissertated in the article, the relation between mes and the plan layer and the control layer was deeply analysised, and the characteristic of mes in the industry application was researched in detail. after analysised the current production condition and the existent problem in jigang plate plant, the design of system frame, dadabase and function module have been studied, and the realization of it has been expounded. for solving the low efficiency in arranging the rolling plan by man, based on the traveling salesman problem and the pack problem about 0, 1, the mathematics model of the schedule of rolling plan was put forward, and the most near insert way was introduced to solve it, the result was satisfied. based on the practical demands of jigang plate plant combined the academic research of mes software, it has been realized the valid combination between the management of production scene and the upper management software in the dissertation

    本文論述了mes的定義及其實質、 mes的定位模型和其十一項功能,深入分析它與計劃層和控制層的關系,並闡述了mes在行業應用中的特點。在分析濟鋼中厚板廠生產現狀及其存在的問題后,研究了系統的體系結構設計、數據庫設計和功能模塊設計,並對其實現進行了闡述。為了解決人工經驗編排軋製作業計劃問題的低效性,提出了基於旅行商問題和0 1背包問題的軋製作業計劃排序數學模型,並採用最近插入法進行求解,取得了滿意的效果。
  19. Ctb has set a very stringent emission standard for its fleet, which is much more demanding than the emission standard set by environmental protection department and transport department ( current official upper limit is 50 hartridge smoke unit i. e. hsu )

    城巴嚴謹的廢氣排放標準,更遠優于環保署及運輸署訂定的要求水平(現時政府對廢氣排放的上限為50哈特里奇煙霧單位( hsu ) ) 。
  20. Whether in the aspect of total rain days or total rainfall amount in a year, ya ' an is always an extreme range, which has been called " ya - an - tian - lou " in chinese. the predicted average physical structures in the raining process are as follows : ( l ) positive vortex and convergent center in the lower and middle troposphere and negative vortex and divergent center in upper troposphere ; ( 2 ) the superposition of the low layer zonal - vertical circulation and the up layer zonal - vertical circulation forms a strong upward current

    從6種不同方案對暴雨過程預報的實驗看,不同的邊界層參數化方案對雨帶特徵的模擬都具有一定的能力,同時模式模擬的降水對參數化方案的選取是敏感的,不同的參數化方案模擬出的降水范圍和雨量分佈有所差異,主要表現在降雨量中心強度及雨區分佈上。
分享友人