valley dam 中文意思是什麼

valley dam 解釋
峽谷壩
  • valley : n. 1. 谷,峪,河谷;凹處。2. 流域。3. 【建築】屋谷,屋面天溝。
  • dam : n 1 水閘,壩,堰。2 壩中的水。3 【礦物】坑道堰。4 (牙科用的)橡皮障。5 〈比喻〉障礙。vt 1 築水閘...
  1. The mechanical genesis of the complicated rock mass is because several times of tectonism in pro - period made the structure of rock mass in the right dam foundation damaged seriously and rock mass alteration made its mechanical character more anisotropy. after that the fractures in the right dam foundation slope were stretched at the beginning of the quaternary period because in the period yakouhoushan mountain quaquaversal dome was blowups quickly. at the same time, the valley trenching of lancang river reach to 800 - 1000 meter in altitude at the right bank in nuozadu dam site

    導致右岸巖體復雜化的成因是,右岸巖體在早期遭受了多期構造作用和巖體蝕變的基礎上,第四紀早期丫口後山穹隆的快速隆起與當時河谷下切至800m 1000m高程這一特殊因素組合引起了右岸巖體沿原有的斷裂(裂隙)張開,使地下水等風化營力能夠到達坡體較深部位,經過長期的風化卸荷作用,形成了右岸復雜巖體。
  2. The studies may indicate that an earthfill dam with a center concrete gravity overflow spillway section is the most economical, in a wide flat valley.

    方案表明,在寬闊而平坦的河谷內,一種在中間段設置混凝土重試溢洪道的土壩是最經濟的。
  3. Proceeding with the analysis of water resource peculiarity of jilin province, the authors bring forward that effective gathering and using of rainwater can supplement the gross amount of rainwater in valley, probe into rainwater resources use in jilin province : first is to make rainwater resources use plan in valley program, secondly is to construct gully dam system according to water and soil conservation project, to strengthen sloping field collection rain ' s project and forest - grass construction, to increase storage space, thirdly is to fully utilize field project and water conservancy project to gather rain water, intercept rainfall on the spot so as to restore water environment

    摘要從吉林省水資源特點分析入手,提出了雨水資源的有效集蓄利用是補充流域水資源總量不足的重要因素,探討了在吉林省雨水資源主要利用途徑是首先在小流域規劃中作好雨水資源利用規劃;其次是建設以水土保持治溝骨幹工程為主的溝道壩系,強化坡面集雨工程和林草植被建設,增大貯水空間;第三是充分利用田間工程和水利工程集雨蓄水,使降雨就地就近被攔蓄,最終使水環境得以修復。
  4. Since in yuan dynasty, kunming was the politics, economy, cultural center of yunnan ; galaxy of talent, the historic monuments are numerous, it is the chinese history and cultural famous city, the dam of kunming is the second dam in yunnan province, the total area is 763. 6 square kilometers, even fertile valley, the products are rich, it is the famous land flowing with milk and honey

    昆明歷史悠久,遠在三萬年前的舊石器時代,滇池周圍地區就有人居住。自元代以來,昆明就是雲南的政治經濟文化中心人文會萃,古跡眾多,是中國著名的歷史文化名城,昆明壩是雲南省第二大壩子,總面積763 . 6平方公里,平疇沃野,物產富饒,是著名的魚米之鄉。
  5. The whole project comprised the building of the dam, a 2, 428 - yard tunnel driven through the wong nai chung gap valley and a 5, 500 - yard brick and stone aqueduct to connect the reservoir with the storage tank and filter beds at albany road. each day the volume of water being conveyed reached 7 million gallons. the 6 filter beds of the project were situated on the eastern side of the albany nullah ; measuring 3, 245 sq

    除水壩外,其他配套的工程包括: (一)一條長達2 , 428碼、貫穿黃泥涌峽谷的隧道; (二)一條長5 , 500碼的引水道,可連接水塘隧道的亞賓尼濾水池及配水庫,該引水道用石及磚砌成,每天可輸水700萬加侖; (三)位於亞賓尼水渠東部的六個過濾池,該濾水系統面積廣達3 , 245平方碼,深30尺,每天可過濾570萬加侖水,原水過濾后,經一條直徑18寸鐵水管,流入花園道與寶雲道交界的配水庫。
  6. The builders say the dam will end the annual floods that, since time immemorial, have killed untold numbers of chinese in the valley of the yangtze, the nation ' s longest river

    大壩的建築者們說,三峽大壩的建成,將結束自遠古以來的年年洪水之患,拯救千年來受洪災荼毒的長江流域居民。
  7. However the experience about design of high arch - darn is not enough in deep valley, especial when the dam is located in the areas of intensive earthquake. therefore the study of three dimension earthquake response is great significant in reality and history to the hydroelectric construction

    然而,由於缺乏在河谷高寬比大的高拱壩設計經驗,特別是在高地震烈度區修建高拱壩,因此,本項目的研究分析具有十分重要的現實意義。
  8. The dam was 2, 352 ft. long, 178 ft. high and spanned the whole of the shek pik valley. the base was 1, 200 ft. wide, and the top was 28 ft., wide enough to accommodate traffic

    水塘的主壩橫越石壁谷,長2 , 355尺,高178尺,壩底寬1 , 200尺,壩頂寬28尺,可供汽車行駛。
  9. On 29 february 1860, mr. rawling suggested the construction of a 30 million - gallon reservoir in the pokfulam valley region for storing rainwater. the proposal was to build a dam across the pokfulam valley and to collect rainwater in the reservoir

    1860年2月29日,英國人羅寧( rawling )建議于薄扶林谷地內興建一個容量達3 , 000萬加侖的儲水庫,儲存雨水供居民使用。
  10. The construction followed the topographical conditions of the valley with the building of a boomerang - shaped dam of 50 ft. high and 270 ft. long, to trap water from the eastern part of the valley area

    工程利用了黃泥涌山谷的地形,在山谷的出口處,興建高50尺、長270尺的弧形堤壩,儲存雨水。
  11. Some problems and difficulties urgently to be solved in seismic research of high concrete arch dams were reviewed, including to find simple and practical methods for comprehensive analysis of dam foundation, dam body, and reservoir water, to work out rational safety evaluation criteria for high arch dams, to study the dynamic behavior of the strength of concrete materials, to develop the seismic input model of the dam - site river valley, and to explore aseismatic measures

    摘要綜述能對壩基、壩身與庫水綜合分析的簡單實用方法,合理的高拱壩抗震安全評價準則,混凝土材料強度的動力特性,壩址河谷地震動的輸入模型,抗震工程措施等高拱壩抗震研究中亟待解決的問題和難點。
  12. In one part of the upper reaches of the madison river, a whole mountain began shifting, then came crashing down to fill the deep valley and dam the great river with millions of tons rock and trees

    在麥迪生河上游的一條支流處,一整座山開始移動,之後,它崩塌下來填滿深深的山谷,上百萬噸巖石和大樹如壩般阻擋住大河。
分享友人