velocity change 中文意思是什麼

velocity change 解釋
速度變化
  • velocity : n. 1. 迅速;快速。2. 速度,速率。3. 周轉率。
  • change : vt 1 改變,變更,變換,變革。2 交換;兌換;把(大票等)換成零錢;把(支票等)兌成現金。3 換(車、...
  1. The influence of the cloud droplet spectrum character and the spectrum growth and change is considered, which does not use a cut - off value for conversion from cloud water into rain water process. in the continuous coalescence equation, the particles fall velocity difference is not moved out from the integral, but is integrated in the equation as the function of diameter d to avoid the error of using particles average fall velocity. in the new scheme, generation rate of graupel due to the collection of snow by graupel and the collection of cloud ice by graupel are included

    雲中凝結核ccn的數濃度採用超幾何函數表示;雲水向雨水的自動轉換過程採用grabowski ( 1999 )的公式,考慮了雲滴譜的特徵和發展變化對該過程的影響,而不是採用原方案給定閾值的方法描述該過程;對連續碰並方程不再將粒子落速差作為常量提出積分號外,而是直接作為粒子直徑函數在積分號內求解,這樣處理可以迴避使用粒子群的平均落速帶來的誤差;增加了霰和雪、霰和冰晶的碰並微物理過程。
  2. To change the initial velocity, click on the applet and then change the velocity slidebar

    你可以改變氣體分子的速度來觀察氣壓有怎樣的變化。
  3. The frontal structure of longmenshan in the west of sichuan is very complex, showing intense structure deformation in overthrust belt, high structure amplitude, steep stratigraphic dip, developed fault blocks, complex seismic wave field, frequent change of lateral velocity, and poor image of post - stack time migration processing

    摘要川西龍門山前緣構造非常復雜,逆掩推覆構造帶構造形變強烈,構造幅度大,地層傾角陡,斷塊發育,地震波場復雜,速度橫向變化大,常規疊后時間偏移處理成像效果較差。
  4. Owing to complicated earth ' s surface condition such as the steep stratum outcropping of front - zone of mountain or the huge thick gravel stratum ' s overlay and earth ' s surface large undulation, complicated underground geology structure developed extremely such as thrust and overthrust nappe, and violent change of the lateral velocity, etc. in front - zone of mountain there are a series of problems such as serious secondary disturbance and low signal - to - noise ratio in seismic exploration gathering

    由於山前帶高陡巖層出露或巨厚礫石層的覆蓋、地表起伏大等復雜的地表條件、逆沖和逆掩推覆等復雜地下地質構造發育、速度橫向變化劇烈等原因,造成了山前帶地震勘探資料採集存在次生干擾嚴重和信噪比低等一系列問題。
  5. Aerosols generated from continental and marine sources are transported to each other ' s environment, meanwhile they change the chemical compositions of the atmosphere, influence the processes and velocity of atmospheric chemical reactions

    陸地和海洋源產生的氣溶膠通過大氣的流動向對方的環境系統輸送,從而改變了對方環境大氣的化學組成,影響著大氣污染物的化學反應過程和反應速度,其沉降過程也會對對方的生態系統產生一定的影響。
  6. The following 3 chapters mainly discuss several important factors tc inflnsncs rr. oney velocity ' s change, while some simple mathematical and econometrics model are used to support the main point of view

    然後三、四、五章重點在於敘述我國gdp m _ 2減速的幾個制度原因,這是學術界中更為忽略的問題。並藉助于簡單的數學模型和經濟計量模型來支持本文的觀點。
  7. Several numerical experiments are carried out to detect the actual steps and limitation for the velocity and depth parameter ' s ray inversion in the fourth chapter, and the we find that : a. the resolution capability of the layer ' s velocity change along both the top and bottom boundary is very poor. thus generally the vertical homogeneous layer model whose top velocity equal to that of its bottom boundary should be considered

    本文的第四章通過一系列模型試驗詳細探討了利用射線反演方法反演速度和深度參數的實際步驟,認為走時反演對速度層內頂部和底部速度變化的分辨能力很弱,僅僅依靠走時數據難以反演出層內頂部和底部的速度變化,故一般情況下應採用速度層底部和頂部速度相同的縱向均勻模型。
  8. The velocity varies from 61. 5cm / s ( maximum ) in june to 48. 1cm / s ( minimum ) in march in the kuroshio extension, and the extreme appear at the position of the first meander. the extreme minish, and the month and position of the extreme change accordingly as it deepens

    黑潮延續體的表層流速最大值則由6月份的61 . 5cm / s (最大值)變化到3月份的48 . 1cm / s (最小值) ,極值則出現在黑潮延續體西段大彎曲路徑的第一個峰處。
  9. A 2 - d hydrodynamic - numerical model was applied to typical rocky rapids called jiyutan by comparing different computational models. based on the comparison of different schemes, the change of the discharge and the flow current in a branch were analyzed, and the relationship between the flow condition and excavation area, scope as well as mode was discussed, the conclusions show : ( 1 ) in a branching rocky rapids, the velocity may be reduced and flow condition can be improved by excavating one channel partly

    本文在對各種數學模型比較的基礎上,應用二維水動力數學模型研究典型石質汊流灘? ?廣西潯江鯽魚灘航道整治工程方案,通過各方案計算結果比較,分析了不同汊道的開挖及汊道內不同開挖面積、開挖范圍以及開挖方式所引起的分流比及工程區域航道水力條件的變化規律,研究結果表明: ( 1 )對于石質汊流灘來說,在某一汊道通過局部開挖河槽,擴大過水斷面面積,可以達到降低工程段流速、改善局部水流條件的目的。
  10. On the other hand, the velocity may also be increased by excavating another channel, which should be treated cautiously. ( 2 ) the change of flow rate in a typical branching rocky channel is related to excavation area scope and mode. more excavation area scope and width, more increase in flow rate

    ( 2 )石質汊流灘汊道分流比的變化一般與汊道的開挖面積、開挖范圍以及開挖方式等因素有關,即開挖面積越大,則分流比增加越多;開挖范圍越廣,分流比增加越多;相同開挖面積情況下,寬淺開挖比深窄開挖對分流比的影響要大。
  11. It will change the hydraulic conditions of the river, such as widening the water surface, decreasing water - flow velocity and purification capacity of water body in reservoir area meanwhile, many problem will be encountered, such as a large quantities of pollution in cities and towns, harmful matters in pesticide and fertilizer in reservoir area, poisonous pollutants in rainfall, accidental discharge of municipal wastewater or industrial sewage, limits of low economic level and urbanization etc.

    該水域的水力學條件發生變化,水流速度減緩,岸邊污染帶加寬,水體的環境容量降低;三峽庫區城鎮污水處理廠和廠礦的有害廢水處理設施不可避免地會發生事故排放;成庫期內庫區城鎮污水的治理很難達到水質要求,以及三峽庫區目前較低的經濟和城鎮化水平制約,庫區城鎮供水面臨的水環境問題日漸突出。
  12. The saffman force does not affect the axial velocity of the flow, while it change the concentration of the particle. the gas - particle two - phase flows in the present of temperature were also numerical simulation

    討論了絕熱、有溫差和添加熱泳力三種情況下的兩相流場,分析了溫度梯度、湍動能、軸向速度和顆粒濃度的變化。
  13. 3 ). the flow velocity and temperature change rapidly in hot plenum under the transient condition such as in the case of reactor scram condition. thermal stratification phenomena will be observed nearby the inlet of intermediate heat exchanger

    在事故停堆后的瞬態分析中,熱鈉池的流場和溫場變化劇烈,並在中間熱交換器的入口附近形成穩定的熱分層。
  14. Analysis is done on the change rules of liquid " s temperature along with the pipeline " s distance. the paper points out the defects of the const pressure wave velocity method and do some improvements on it : rebuilding the expressions of the pressure wave velocity in accordance with the simpson ' s rule

    分析了管道內的流體溫度隨傳輸距離而變化的規律,並指出了此規律對管道負內壓力波傳播速度的影響。指出了常負壓力波波速定位方法的局限性,並採用改進的負壓力波定位技術,將管道內的負壓力波速公式採用復化辛普森公式進行了改造。
  15. The tempo change of monetary velocity of our country is in the downward trend of the long - term, the short - term fluctuation exists and obvious obeying cycle appears in the short - term change

    我國貨幣流通速度變化在長期下降的趨勢中,存在短期的波動且短期變動呈現明顯的順周期。
  16. We can discovered the factors which affected the monetary velocity of our country long - term drop include the economical monetization degree, the change of, interest rate, high savings ratio

    研究結果表明影響中國貨幣流通速度長期下降的因素有經濟貨幣化程度的加深、利率的變動、居民的高儲蓄率。
  17. In this thesis, first, reasons and factors for the stability of loose rock dams were summarized according to the field surveys and certain expert ' s experiences. then, researches on block stability problems were reviewed, and according to the relationship between grain size and incipient velocity, it is found that the block weight is in direct proportion to 6 - 9 power of incipient velocity, and 50 % increase of the velocity will result in about 40 times change of the block weight. after that, experiments were conducted in a flume, focusing on the relationship between incipient velocity and some main factors including block weight, water depth over the dam, cross - section size, block material and river bed material

    本文首先根據散拋石壩損毀情況的現場調查資料,結合有關專家多年的整治經驗,總結出壩體的損毀原因及影響因素;對現有塊體穩定性的研究成果進行回顧和總結,並針對散拋石壩的直接損毀現象,結合山區河流的水流、地形特點,利用塊體粒徑與起動流速的關系,提出塊體穩定重量與起動流速高次方成正比的概念,流速50的增長可能導致塊體穩定重量接近40倍的變化;通過二維變坡水槽試驗,研究了壩體穩定的主要影響因素,包括塊體重量、壩頂水深、斷面尺寸、塊體材料(塊石和卵石兩種) 、護底等,結果表明對于山區河流,試圖僅僅通過增加壩體單個塊體重量或斷面尺寸來提高壩體穩定性效果甚微;最後,根據西部地區的自然、經濟、交通等條件,提出可以採用柔性混凝土鉸鏈體等一類整體性較好的護面層作為散拋石壩的防沖毀措施,以期取得良好的工程效果。
  18. 3 ) from the samples saturated completely by air to those saturated completely by brine, the velocities of compressive wave of the rocks increase obviously, with the extent of 11. 73 % ; the velocities of shear wave change little or decrease slightly, with the average of decreasing extent of 1. 21 % for shear wave 1 and 1. 16 % for shear wave 2. the difference of velocity between compressive wave and shear wave makes poisson ' s ratio increase obviously, with the average extent of 87. 25 %

    3 )從完全飽和氣到完全飽和水,珠江口盆地第三系砂巖、粉砂巖、碳酸鹽巖及其過渡性巖石類型的縱波速度是顯著增加的,平均增加幅度為11 . 73 ;橫波速度變化很小,或略有降低,橫波1平均降低幅度為1 . 21 ,橫波2平均降低幅度為1 . 16 ;縱橫波速度的這種差異變化導致泊松比顯著增加,平均增加幅度為87 . 25 。
  19. The velocity change of negative pressure wave generated by pipeline leak during the process of transmission is analyzed, the formula of wave velocity changing with temperature is deduced, and the pipeline leak positioning problem is transformed into a function optimization problem

    摘要通過分析管道泄漏產生的負壓波在傳播過程中速度的變化,推導出波速隨溫度變化的公式,並將管道泄漏點定位問題轉化為函數優化問題。
  20. The smaller convective patch corresponds to slight changes of maximum mean wind speed and the larger convective patch corresponds to the waves amplifying, the intensity of the inward propagation of vorticity strengthening distinctly, the amplitude of velocity change increasing and the period longing

    初始擾動尺度減小,渦旋rossby波減弱,對tc強度增強作用減弱;擾動尺度增大,波動增強,向內傳播的渦量顯著增大,但轉化為渦量帶現象變化不大,風速變化的震蕩性增強。
分享友人