voltage-time curve 中文意思是什麼

voltage-time curve 解釋
伏秒特性曲線
  • voltage : n. 【電學】電壓,電壓量,伏特數。 the working voltage (電氣的)耐壓限度。
  • time : n 1 時,時間,時日,歲月。2 時候,時刻;期間;時節,季節;〈常pl 〉時期,年代,時代; 〈the time ...
  • curve : n 1 曲線;彎曲;彎曲物。2 曲線規 (=French curve);【機械工程】曲線板;【棒球】曲線球;【統計學...
  1. Constrained to technologies, the lead - acid battery mainly adopted traditional charging methods such as constant voltage, constant voltage with current limitation, constant current, etc. the charging current of these methods cannot match efficiently the acceptance curve of the lead - acid battery proposed by j. a. mas. as a result, some of these methods have a low time efficiency and incompleteness charging. and some of them lead to overcharge and gas - generation, which will result in low - efficiency, time - consuming and prone - to - damage of the charging operation

    鉛酸蓄電池由於受到技術條件的限制,其充電主要採用恆壓、恆壓限流、恆流等常規充電模式,這些方法的充電電流未能有效的遵從馬斯所提出的可接受充電電流曲線,因而有的充電方法時間效率低、充電不完全;有的則存在著過充電和析氣等現象,並導致充電過程的低效,耗時和易損。
  2. Then the paper uses the same typical four network operating conditions as the primary given conditions and when adding one set of the parallel capacitor bank, changing the 330 / 220kv transformer tap changer position step by step to change the transformer ration, through this study methods this paper found out all the optimized combination of the tap changer position and the amount of input reactive power, also obtained four sets of the 330kv, 220kv and hokv s / s bus voltage and the active and reactive power losses changing curves. through analyzing the optimized combination control curve and the network power flow, the paper generalizes the rules as following : the chief measure of coordinative control is inputting shunt reactor in chengxian s / s in winter time both in the planning year of 2010 & 2005 ; in summer time in planning year of 2010 the chief measure is to input proper shunt capacitor

    本研究通過分析所獲得的最優綜合控制組合曲線及電網潮流,總結出了如下規則:隴南電網在2005年及2010年冬大、以及2005年夏小運行方式下,綜合控制應以成縣變投入適量並聯補償電抗器作為主要措施;在2010年夏小運行方式下則投入適量並聯補償電容器作為主要措施,再輔助以選擇合適的主變有載調壓分接頭來調節,達到控制網內無功潮流分佈合理、各變電站母線電壓在理想的范圍內時電網有功損耗最小,從而也提高了電網安全運行水平及供電質量。
  3. Seek the b ( t ) fieldwork curve and the time derivative curve dbz ( t ) / dt from the voltage decrease data generalized from field current that eliminating noise treated by wavelet ; 3

    由經過小波消噪處理過的野外歸一化的電壓衰減數據求出b _ z ( t )實測曲線和它的時間導數曲線(
  4. The twelve kinds of modes and equivalent circuits within one high frequency switching period are carefully analyses. by using the state - space averaging approach, the converter ' s averaging model is presented, the output characteristic curve and design criterion of key circuit parameters such as output voltage, filtering inductance, common conduction time, uni - polarity spwm waveform ' s duty cycle etc are given

    詳細分析了這類變換器在一個高頻開關周期內的十二個工作模式及其等效電路。採用狀態空間平均法建立了變換器平均模型,獲得了輸出電壓、濾波電感電流、共同導通時間、單極性spwm波占空比等關鍵電路參數的設計準則和變換器的外特性曲線。
  5. The corresponding variation of olltput voltage due to the change of total laser intensity is measured by a photo detector. a displacement - time curve can be obtained by calibrating the re1ationship between block position and output voltage of the photo detector. through the use of simple mathematical operation, the bird - shell velocity and acceleration histories can be determined, and therefore the bird - shell instantaneous velocity at any points within the measurement range can be obtained

    該系統發射的一片狀激光受運動鳥彈的依次阻擋后,相應的光強度變化將被測出並轉換為位移時間曲線,經過簡單的數學運算,該系統能用來確定鳥彈速度和加速度的時間歷程,因而可確定鳥彈在被測區域內任一點的瞬時速度。
  6. Voltage time - to - breakdown curve

    擊穿電壓對擊穿時間的關系曲線
分享友人