wall bars 中文意思是什麼

wall bars 解釋
肋木
  • wall : n 1 墻壁;(石、磚等的)圍墻;城墻。2 (形狀、用途)像墻壁的東西,障壁;土堤,堤防。3 (礦井、容...
  1. Gymnastic equipment - wall bars, lattice ladders and climbing frames - safety requirements and test methods

    體操器材.球棒,格梯,爬架.安全要求和試驗方法
  2. Gymnastic equipment. wall bars, lattice ladders and climbing frames. safety requirements and test methods

    體操器材.肋木格子梯和攀緣.安全要求和試驗方法
  3. Gymnastic equipment - wall bars, lattice ladders and climbing frames - safety requirements and test methods ; german version en 12346 : 1998

    體操器械.肋木,格子梯,攀登架.安全性要求和試驗方法
  4. A high wall bars the way into his garden

    一堵高墻擋住了去花園的路。
  5. Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    文摘:介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  6. A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  7. Gymnastic equipment - wall bars - requirements and test methods ; including din en 12346

    體操器械.肋木.要求和試驗方法
  8. Facilities : upright piano, wall mirrors, practice bars and sprung flooring

    設施:鋼琴長身入墻鏡舞蹈排練杠及彈性地板
  9. In this paper, a new ductile rc coupled shear wall, namely rc coupled shear wall with concealed bracings, was put forward based on the study of shear wall with concealed bracings and inclined across steel bars in lintel beam. then the seismic design methods on shear wall with concealed bracings was given through the experimental study and theoretical analysis on seismic behavior and corresponding finite element analysis on elastic - plastic

    本文在帶暗支撐剪力墻及雙肢剪力墻連梁配交叉斜筋的研究基礎上,提出了一種新型延性雙肢剪力墻? ?帶暗支撐雙肢剪力墻,通過抗震性能試驗研究和理論分析,以及相應的彈塑性有限元計算,給出了帶暗支撐剪力墻的抗震設計方法。
  10. The influences of the reinforcement proportion of distributing bars to concealed bracings on bearing capacity, stiffness, deterioration process of stiffness, ductility, hysteresity capacity, energy dissipation and failure features of low - rise shear wall were studied through experiment analysis on 6 models of low - rise shear wall with concealed bracings under cyclic loading

    通過6個帶暗支撐低矮剪力墻試件在低周反復荷載作用下的試驗分析,研究了不同的分佈鋼筋和暗支撐鋼筋配筋比例對低矮剪力墻承載力、剛度及其衰減過程、延性、滯回特性、耗能、破壞特徵等方面的影響。
  11. The mechanic character, destroying pattern, the ductile and dissipation energy capacity of this composite structure under the earthquake have been clarified. the stiffness degradation, natural frequency, damping ratio of this structural system with the development of intensity of earthquake have also been investigated. with consideration of the top displacement, drift of story and micro - strain of longitude steel bars, the equivalent shell wall method has been presented in order to simplify the design of such type structure

    通過試驗,掌握了該結構體系在水平地震荷載作用下的受力特點、變形與耗能性能、結構的破壞形態等力學指標:得到了結構在不同地震烈度條件下的剛度變化、自振頻率、阻尼比等動力特性;綜合結構的頂點位移、層間轉角以及鋼筋的微應變,提出了適合於該結構體系簡化設計的「等效剪力墻法」 。
  12. Soil - nail wall supporting technology formed a gravity earth retaining wall by embedding some given size and given density slender bars and sprayed concrete in reinforced soil

    摘要土釘墻支護技術通過在被加固土體內植入一定長度和密度的細長桿件與噴射混凝土面板,形成了一個類似重力式擋土墻。
  13. Equipment : wooden flooring and wall bars

    木地板練習杠
分享友人