wall bottom 中文意思是什麼

wall bottom 解釋
塢墻底
  • wall : n 1 墻壁;(石、磚等的)圍墻;城墻。2 (形狀、用途)像墻壁的東西,障壁;土堤,堤防。3 (礦井、容...
  • bottom : n 1 底,底部。2 地基,基礎;根底;底細,真相,原因,根源。3 (樹的)根干;(山)麓麓;〈方,常 pl...
  1. To the house of bricky structure, rock - bottom wall body area is large, the wall body area of superstratum is small, so similar unit, upstairs and downstair cover inside practical area or meeting discriminating ; same layer will tell, although be covered identically inside floor area, cover the unit of the unit inter of horn that compare clip inside usable floor area also is met a few smaller

    對磚結構的房子來說,底層的墻體面積厚,上層的墻體面積薄,所以同樣的單元,樓上樓下的套內實用面積還是會有差別的;同一層來講,即使相同的套內建築面積,把角的單元比夾在中間的單元套內使用面積也會小一些。
  2. Study on the mining method for the hanging wall ore and that under the open - pit bottom

    露天掛幫礦及境界以下礦石開采方法研究
  3. Pushover analysis of masonry structure with frame - shear wall at the bottom

    抗震墻砌體結構靜力彈塑性分析
  4. The radial velocity profile of the liquid is dependent on the superficial air velocity and the column height, and flows from the wall to the center at bottom of the column

    徑向液相速度既與氣相折算速度有關又與位置高度有關,在塔底部呈現負值,這意味著向塔軸心方向流動。
  5. In the design, the construction measures such as application of shrinkage - compensating concrete, arrangement of spacing layer between the foundation rock and the bottom slab, adding outside waterproof layer, flexible connection between outlet pipe with side - wall, integerated concrete placement of pump seat with bottom slab and design of reinforcement with application of advanced calculation theory are used according to the characteristics of lager span, larger volume and complex loading conditions of the understructure

    針對下部結構跨度大、體積大、受力復雜的特點,在設計中採取多種措施,包括採用補償收縮混凝土、基巖與底板間設隔離層、增設外防水層、出水管與邊墻採用柔性連接、機座與底板整體澆注、採用先進計算理論指導配筋。
  6. " prestress anchor ribbed beam support system " is a new practical support technology which came from soil nailing walls system and un - embedded rank of piles with anchors support system that has been used successfully for 4 years by the author and his company named qingdao deep foundation stabilization engineering co., ltd. it " s mechanism is similar to rank of piles with anchors support system that can not be inserted into the bottom of foundation trench, but it " s ribbed beams are used to replace rank of piles made before excavation so the work cycle can be shortened and the support system cost can be reduced ; meanwhile this system maintains the soil nailing wall " s convenience of digging and supporting

    「預應力錨桿肋梁支護技術」是筆者及所在單位歷時四年在土釘墻和無嵌入多錨排樁兩種支護體系基礎上開發應用成功的一種新型實用性支護技術。其支護機理類似於未嵌入坑底的排樁多錨支護,只是由肋梁代替了開挖前施工的排樁從而提前工期並降低支護造價;同時繼承了土釘墻隨挖隨支護的機動靈活性。自1998年至今該技術已在青島、濟南、煙臺等十幾個深基坑和高邊坡工程中成功應用。
  7. Taking bench shooting of the shuibuya yihongbao project as example, it makes use of the digital television system of drilling overall - hole wall to actually measure, the testing result of lateral fractural range is 4 - 5m, and that of bottom fractural range is about 3m

    本文試驗工作是以水布埡溢洪道工程梯段爆破為實例,採用鉆孔全孔壁數字電視系統對混裝乳化炸藥爆破破裂范圍進行了實際測試,測試結果為:側向破裂范圍為4 5m ,底部破裂范圍值為3m 。
  8. He had reserved the house and half the garden, and building a wall between the garden and the workshops, had let them upon lease with the pavilions at the bottom of the garden. so that for a trifling sum he was as well lodged, and as perfectly shut out from observation, as the inhabitants of the finest mansion in the faubourg st. germain

    他留用了正房和花園的一半,在花園和工場之間築起了一道墻,連花園底上的兩座樓房一起租了出去,所以他只花了很少的一筆錢,卻住得舒舒服服,象聖日爾曼村裡一位最講究的主人一樣得到了一座獨門獨戶的大住宅。
  9. Model xjq has following features : ( 1 ) dummy bottom is adopted, making the recycling capacity of the recycling cylinder is 2. 5times of the tand. ( 2 ) the stator is a cylinder in structure with its inner wall being vertically ribbed, and slots are placed, leading to better cutting lffect to the slurry. ( 3 ) due to low immerging depth of the rotator, low rurning speed of the impeller, and wide space between the impeller and stator, wearing is low and power consumption greatly reduced. ( 4 ) it is spontaneously aerated

    Xjq型浮選機為仿維姆科型,該機主要有以下幾個特點: ( 1 )採用了假底,循環簡可使循環量達到槽容積的2 . 5倍; ( 2 )定子結構為圓筒型,內壁設有立筋條和長孔,對礦漿的前切作用好; ( 3 )轉子浸沒深度淺,葉輪轉速低,葉輪和定子間隙大,所以其磨損輕,動力消耗大大減少; ( 4 )可自吸空氣。
  10. Treatment for three stubborn problems in the safe and economical operation of cfbc boiler wear prevention of wall and heating surface discharge and cooling of bottom slag

    爐壁和受熱面防磨的治理及爐底渣排放與冷卻
  11. It is widely applied to the stove top, shove head, stove door and burmer brick, the binding of cooling - tube and groove bottom of the molten steel mouth of the heat stove, meantime empopyed in the field of the step stove bottom, the fir - proof wall of the circular stove, the cover, the protruding tape and sand sealing mouth of the equal - heating stove, the triangle, the spray gun and meltingiron groove of electric stove and also including fire - resistant material used in the refine stove and the stove door

    加熱爐的爐頂、爐頭、爐門、燒嘴磚、水冷管包紮、出鋼槽槽底、步進爐爐底、環形爐檔火墻、均熱爐的爐蓋、凸出帶、砂封口、中間包包蓋、電爐三角區、鐵水包襯里、爐外精煉用噴槍,底吹氧煙道、鐵水溝蓋、檔渣堰、高爐中各種耐用火料襯里煉焦爐爐門等。
  12. The outside diameter of copper tube shall be tested by micrometer. the tooth depth and the bottom wall thickness shall be tested by microscope

    外徑尺寸用外徑千分尺測量.齒高和底壁厚用雙目倒置小金相測量。
  13. The hot air will enter into the bottom of the dryer and produce vigorous eddy airflow. it will produce strong washing out and bring out effect to material and eliminate the phenomenon of adhering wall

    乾燥氣體進入乾燥機底部,產生強烈的旋轉氣流,對器壁上物料產生強烈的沖刷帶出作用,消除粘壁現象。
  14. Dry gas enters into the bottom of drier and produces strong rotating air stream that exerts strong rushing effect to raw material on the wall, therefore the phenomenon of stricking on the wall is removed

    乾燥氣體進入乾燥機底部,產生強烈的旋轉氣流,對器壁上物料產生強烈的沖刷帶出作用,消除粘壁現象。
  15. Method to evaluate pile capacity precisely by using the coefficient of cleaning slime and coefficient of construction process and by controlling the total duration of construction is proposed herein after analyzing the influences of slime at pile bottom, thickness of mudcake by the side of pile, shape of hole wall, time of construction and construction process on the bearing capacity of large diameter cast - in - place pile

    本文通過分析樁底沉渣、樁側泥皮厚度、孔壁形狀、成樁時間及施工工藝等對大口徑灌注樁承載力的影響,提出了在樁承載力計算中引入清底系數及成樁工藝系數,並控製成樁總時間以較準確地評價單樁承載力的方法。
  16. In the light of the problems during the tank bottom plate welding of 150000 m ^ 3 double - pontoon floating roof oil tank, the paper analyzes the deformation cause of tank wall shell in welding

    摘要分析了15 10 ^ 4立方公尺雙盤浮頂油罐罐底板焊接過程中出現的問題,提出焊縫收縮使得對接間隙變小是引起邊緣板變形的主要原因。
  17. This paper approaches reinforcement fabric cover, reinforcement fabric joint, reinforcement fabric embedded inserts, wall anchorage depth and wall joint form during the design of underground continuous walls, meanwhile, some problems affecting wall quality in the various sectors during construction are also discussed, including reinforcement fabric installation, groove bottom hole cleaning and quality testing equipment

    本文對地下連續墻設計過程中的鋼筋網保護層、鋼筋網接駁、鋼筋網預埋件、墻體錨固深度、墻體接頭形式以及施工過程中鋼筋網安裝、槽底清孔、質量檢測設備等各個環節中影響墻體質量的一些問題進行了探討。
  18. Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    文摘:介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  19. A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  20. Bottom wall and anchor packer

    井壁及尾管封隔器
分享友人