wall energy 中文意思是什麼

wall energy 解釋
壁能;束縛能量
  • wall : n 1 墻壁;(石、磚等的)圍墻;城墻。2 (形狀、用途)像墻壁的東西,障壁;土堤,堤防。3 (礦井、容...
  • energy : n. 1. 干勁,活力。2. (語言、行為等的)生動。3. 〈pl. 〉 (個人的)精力;能力。4. 【物理學】能,能量。
  1. On the basis of expound the theory of building exterior - protected construction energy consumption and the gene of influence the building energy, set up mathematics model, this article discuss the mechanism of dispelling the heat of the buildings " thermal bridge and the complication that influence it, and then synthetic analysis and calculate the influence range of building thermal bridge in exterior - protected construction column thermal bridge to the building outer wall get the conclusion that when the construction column can satisfy the building stress - area, in bulgy construction column dispel less heating than out bulgy construction column. but if the pole stuck out more than 100mm, in bulgy or out bulgy make no difference

    本文在闡述建築圍護結構耗熱原理以及影響建築能耗因子的基礎上,採用數值模擬方法,探討了建築熱橋傳熱的基本機理和影響建築熱橋傳熱的因素,進而對建築熱橋在圍護結構傳熱中的影響范圍進行了綜合分析和計算,研究了構造柱熱橋型式對建築外墻能耗的影響,得出了構造柱在滿足建築受力面積要求的情況下,內凸構造柱較外凸構造柱略能減少散熱量的結論,但是凸出過大( 100mm )無論內凸還是外凸對建築耗熱都沒有大的差別。
  2. At present the main products of company have : courtyard the light, ceiling lamp, last light, foot of a wall the the lights, light not under water, ceiling lamp, hanging overhead light, half a ceiling lamp, wall lamp, light, desk lamp, desk lamp, floor lamp, energy - conservation light, emergency light, sodium light, mirror headlight, putting out mosquito s light, searchlight, dampproof light, street lamp, wooden light, crystal light, shot - light, cow hide light, sheepskin light, cloud stone light, stone skill light, copper light, shelf light, etc.

    大至酒店賓館的燈飾照明工程,小到家庭裝飾的照明燈具。目前公司主要燈飾系列產品有:庭院燈吸頂燈地插燈墻腳燈水下燈吊燈吊頂燈半吊燈壁燈燈臺燈桌燈落地燈節能燈應急燈鈉燈鏡前燈滅蚊燈探照燈防潮燈路燈木燈水晶燈射燈牛皮燈羊皮燈雲石燈石藝燈銅燈架子燈等。
  3. Ideally, the cars slide along this wall or crash barrier and dissipate energy and speed

    理想上,賽車沿著這面墻或者是防撞護欄消散沖擊力和速度。
  4. Environmental scanning electron microscopy ( esem ) observation of f2 mycelium cultured in liquid medium with 100mg / l of cadmium showed that there were crystalline precipitations attached to the surface of f2. transmission electron microscopy ( tem ) and energy - dispersive analysis microscope ( edam ) examination revealed that there were many granules with high content of cadmium around the cell wall

    F2在100mg l鎘濃度下培養后,經環境掃描電鏡( esem )觀察顯示,菌體表面有較大晶體狀沉澱物;透射電鏡( tem )和能譜分析( edam )表明,細胞壁周圍形成大量細小的高鎘含量沉澱物。
  5. The main achievements of the dissertation are listed as following. 1 the definition of slw is given to clarify some misunderstanding on the new structure style. the typical experiment results on parallel structure forms, such as erose - section - column frame and conventional shear wall are compared in the point of view of energy dissipating property

    引入短肢墻定義,闡述了短肢墻結構體系是高層住宅合理的結構形式,詳細列出有代表性的異形柱、普通剪力墻結構(或構件)在低周反復試驗中的滯回曲線等主要抗震性能,以作為短肢墻結構體系歸屬定位的依據。
  6. By analyzing and experimentally verifying the model, new ways of improving mixer performance were put forward. ( 1 ) heat water should be used in the mixer ' s temperature control to make the mixer work with optimal parameters. ( 2 ) the surface materials of the mixing chamber and rotors should be chosen rationally to change material surface energy and increase friction on them. ( 3 ) when the compound was processed under higher pressure of floating weight, shallow groovers or stripes parallel to the axle of the rotor should be made on the mixing chamber internal wall to increase the real contact area and improve mixing effect

    通過對模型的分析和實驗驗證,提出了提高密煉機混煉效果的新途徑: ( 1 )密煉機溫度控制採用溫水冷卻,使密煉機處于最佳工作狀態; ( 2 )通過合理選擇密煉室和轉子表面材料以改變材料表面能來增大膠料與它們之間的摩擦力; ( 3 )在上頂栓壓力較大的條件下,在密煉室內壁與轉子軸線同方向加工淺的光滑槽可明顯改善混煉效果。
  7. For example, the temperature standards, the project adopted a geothermal heating to link with municipal heating networks. the designs of energy - saving insulation wall : extruded ceramic plastic plate, three - window design aluminum - plastics which meet energy requirements, and also to improve the insulation quotiety i

    如溫度標準,小區採取了地熱供暖方式,與市政供熱管網連接,採取節能保溫墻面體設計:陶粒加擠塑板,窗戶採用三玻鋁塑窗設計,即達到節能要求,又提高了保溫系數。
  8. In this thesis hydraulic experimental studies and theoretical analyses on the vortex - flow drop shaft were conduced and the following results were accomplished : ( 1 ) in the model test some hydraulic characteristics including the shape of air core in the center of the drop shaft, the radial distribution of water flow velocity and the distribution of pressure on the wall of the drop shaft were measured under the condition of high water head above 250m and large discharge above 1400m3 / s. ( 2 ) a kind of computational method for the spiral water flow in the air core region of drop shaft was discussed and applied and the results agree the experimental data well. ( 3 ) the total ratio of energy dissipation in the drop shaft can reach 90 % and the energy dissipation in every region was discussed quantitatively

    本文通過試驗研究與理論分析對旋流式豎井泄洪洞應用於高水頭、大泄流量情況時存在的一些水力學問題進行了研究和探討,取得以下主要成果:一、結合小灣工程導流洞改建,對高水頭( 252m ) 、大泄流量( 1400m ~ 3 s )條件下旋流式豎井中的水流運動特徵進行了比較全面的測量,包括空腔形態、徑向流速分佈及井壁壓強等;二、提出了豎井空腔段螺旋水流水力計算方法,其計算結果與實測值吻合良好;三、利用試驗與計算結果,對旋流式豎井的消能機理進行了探討,對豎井各部分的消能能力有了總體認識;四、對豎井下部消力井的合理井深進行了優化試驗研究,發現消力井合理深度為0 . 9d左右;五、通過試驗研究,歸納出豎井水流總摻氣量估算方法,為導流洞排氣方案的設計提供了參考依據;六、在高水頭、大流量條件下,豎井空腔段下部流速很高,盡管水流螺旋運動引起的離心力可以確保井壁壓強保持正壓,但空化數依然較低,因此豎井的空化空蝕始終是工程界關注的重大問題。
  9. According to the minimum principle in energy, we analyze the microcosmic mechanism of magnetic domain construction and the main factor that affect the shape, size and connecting of the magnetic domain etc. from the microcosmic mechanism of ferromagnet, we analyze how stress influence the magnetic domain and magnetic domain wall, and discover the increase of stress energy and magnetism elasticity energy which destroy the balance of system energy make up the influence of magnetic domain structure, then set up basic disciplinarian between stress and characteristic of magnetism

    同時根據能量最小原理,從理論上分析了磁疇結構存在的微觀機理以及影響磁疇結構運動、變化的主要因素,得出了應力的存在將影響磁疇的形狀、大小和搭配方式等結論。從鐵磁晶體的微觀機理出發,研究了應力對磁疇和磁疇壁的影響,發現應力影響磁疇結構的本質是由於應力的作用使得鐵磁晶體增加了應力能和磁彈性能,體系為了達到新的平衡,導致了磁疇結構變化,並研究了應力與鐵磁晶體磁特性之間的基本規律。
  10. Design of reinforced concrete frame - shear wall structure with energy - dissipated braces in suqian construction building

    宿遷市建設大廈消能減震設計
  11. The thesis begins with computational analysis to the aerated concrete wall thermal performance. the aerated concrete is proved to have good performance in heat - insulate and heat - conserve as single wall. the index of dew - condensing is within allowing range, thermal performance totally can meet energy - conserving standard requirement in hot summer and cold winter zone

    本文首先對加氣混凝土墻體熱工性能進行計算分析,論證其作為單一墻體,夏季隔熱、冬季保溫性能都很優良,墻體結露指標也在允許范圍之內,熱工性能完全可滿足夏熱冬冷地區節能標準要求。
  12. The article takes a 600mw natural cycle drum boiler ( soot blow using steam ) as investigating object, establishes soot accumulation loss and soot blowing energy loss models for its water cooling wall, superheater, economizer and air preheater respectively, set up instructions for soot blower operating. simulating calculation results are compared with site data to verify usefulness of key models. the article introduced the operation optimizing design of soot blowers of yanzhou no2 power plant based on theoretical research

    本文以600mw汽包自然循環鍋爐(蒸汽吹灰)為具體分析對象,分別建立其水冷壁、過熱器、省煤器、空預器的積灰損失和各受熱面吹灰能量損失的模型,建立相應的吹灰器運行規則指導,對設計中的關鍵模型問題,通過模擬計算及與現場數據作比較的方法,驗證其可用程度。
  13. The design strategies of energy saving of dwelling are put forward on the planning of dwelling district, shape coefficient of building, room and envelop. this thesis puts forward the design of " stagger shading eastwards or westwards ", the design of " double skins " in dwelling and " the energy calculation method with thermal comfort of room ", and introduces the tests of " heat from south to north ", " shading for west wall " and " stagger shading eastwards or westwards "

    第二方面是提出「錯列式東西向遮陽板」和在住宅中應用「雙層皮」的設想,及「考慮熱舒適要求的房間能耗計算方法」的基本思路,並探討了「南熱北送」 、 「西墻遮熱板」和「錯列式東西向遮陽板」等節能設計手法的實驗測試結果。
  14. The technology, which is developed on the basis of perfora ting techniques for oil wells and cement injection techniques, can not shoot thr ough the frozen pipe wall at predetermined ground location using energy - gatheri ng - blasting techniques, but also consolidate shaft wall rock by cement injectio n and filling along the frozen pipe and perforated hole s trajectories, achievi ng leakageproof of shaft walls and reducing vertically - added force

    它利用聚能射孔爆破技術,在預定地層位置將凍結管射穿,同時在地面利用凍結管及射孔彈道對特定地層進行注漿充填加固,既可實現井壁堵漏,又能減少由於地層沉降對井壁的垂直附加力。
  15. Its hysteretic curve is plumper, its ductility coefficient and energy dissipation capacity have been improved remarkably. the inclined staff of the steel bar truss has a restraining faction to the development of the crack, and the phenomena is that there has more crak and larger distributing area on the shear wall, which is an important token of the improved seismic capacity. concealed steel bar truss has the faction of increasing the height of plastic hinge area, which is another important token of

    研究結果表明:內藏鋼桁架高剪力墻與普通高剪力墻相比:屈服荷載和極限荷載均比顯著提高;屈服剛度明顯提高;其滯回環相對飽滿,延性系數及耗能能力顯著提高;內藏鋼桁架高剪力墻,其鋼桁架斜桿對裂縫發展有控製作用,現象是墻體上的裂縫較多、分佈域較廣,這是抗震耗能能力增強的重要表徵;內藏鋼桁架高剪力墻有增大底部塑性耗能區域的作用,這是抗震耗能能力增強的另一重要表徵;內藏鋼桁架還有顯著提高抵抗剪力墻基地剪切滑移能力的作用。
  16. Australia sunshine city - queensland quality strawberry extract made from the fruit fiber, wheat protein essence of integration, vitamin e, honey extract, and other nutritional ingredients, deep moisture skin, remove toxins, strengthen the epidermal cells elastic fiber, add cell energy, and enhance cell wall shored up and the ability to retain moisture nutrition, strengthen update aging cells metabolism

    以澳大利亞陽光之都? ?昆士蘭優質草莓提取的果纖維製成,融和小麥蛋白精華,維他命e ,蜂蜜提取物等多種營養成份,深層滋潤肌膚,排除毒素,強化表皮細胞彈力纖維,補充細胞能量,增強細胞壁支撐力和對水份營養的保有能力,加強老化細胞的更新代謝。
  17. Based upon the experimental study, the stiffness and its attenuation, bearing capacity, ductility, hysteretic property, energy dissipation and failure phenomena of each shear wall with different design parameters are contrastively analyzed and the seismic mechanism of this new shear wall has been opened out

    對各不同設計參數剪力墻的承載力、剛度及其衰減過程、延性、滯回特性、耗能能力和破壞特徵等進行了較系統的分析,揭示了其抗震機理。
  18. Based upon the experimental study, the stiffness and its attenuation, bearing capacity, ductility, hysteretic property energy dissipation and failure phenomena of each shear wall with different design parameters are contrastively analyzed and the seismic mechamism of this new shear wall has been opened out

    通過試驗,對各不同設計參數剪力墻的承載力、剛度及其衰減過程、延性、滯回特性、耗能能力和破壞特徵等進行了較系統的分析,揭示了其抗震機理。
  19. It illustrates that the new style shear wall has better ductility, energy dissipation and bearing capacity, especially the bearing capacity dropped indistinctively at anaphase of the deformation, the structure performance is stabilized relatively and can stay the appearance of the cracks

    表明該種新型剪力墻具有較好的延性、耗能能力和承載力,特別是變形後期承載力下降不明顯,結構性能較穩定,能延緩裂縫的出現。
  20. When the plane was heated, observation showed that the shape factor increased from 1. 5 to 2. 6 ; the mean velocity profile departed from the law of the wall ; the inertial subrange in the energy spectra curves disappeared ; the intermittent phenomenon occurred

    發現在加熱的情況下,邊界層的形狀因子由1 . 5上升至2 . 6時均速度廓線中的平衡湍流層消失以及速度能譜中慣性子區消失等變化。
分享友人