wall foundation 中文意思是什麼

wall foundation 解釋
墻基礎
  • wall : n 1 墻壁;(石、磚等的)圍墻;城墻。2 (形狀、用途)像墻壁的東西,障壁;土堤,堤防。3 (礦井、容...
  • foundation : n 1 建設,創設,創立。2 基礎,根本;根據;地基,地腳。3 基金;捐款;用捐款創辦的事業;慈善機關;...
  1. Fist of all, on the basis of the research of agone boffins, this author investigates the interaction mechanism of bolts and rock, and introduces the elastic ? lastic analytical resolution which is consist of the liner structure, the equivalent reinforced wall rock and the original wall rock in the simple loading from the equivalent well - proportioned view ; this solution is very important meaning for the engineering design. on the basis of coulomb friction model, the author introduces the finite element equation of the contact problem in order to provide the academic foundation for the application of msc. marc. finally, combining the engineering practice of the non - linear analysis of shield tunnel through yellow river of the south - north water transfer and using the model of friction, the author researched the evolution law of stress and displacement field in the structure of grouted rock bolts, and analyzed the effect to the stress and deformation of surrounding rock mass due to anchor supports

    首先,在前人研究成果的基礎上,對錨桿與圍巖的相互作用機理進行研究,利用全長錨固錨桿的中性點理論,從等效均化的角度來考慮錨桿對圍巖的加固作用,並推導了在簡單荷載作用下,含有襯砌、等效加固后的圍巖、原始圍巖三者的彈塑性解析解,對工程設計有著重要的參考意義;在數值模擬方面,以考慮錨固圍巖滿足規則化庫侖摩擦模型為基礎,利用虛功原理推導了接觸問題的有限元方程的計算格式,為開發運用大型商用有限元軟體msc . marc提供了理論根據,也形成了本文的理論基礎:最後,論文以南水北調東線穿黃隧洞穩定性分析項目為工程實例,利用本文所述的接觸問題的摩擦模型理論,對錨桿支護結構的應力場、位移場的變化規律進行了研究,分析了加錨支護對隧洞圍巖應力、變形的影響。
  2. Leakage in a dam foundation may sometimes be overcome by digging deep into it so as to build a cutoff wall into the foundation.

    壩基漏水的現象,有時可以用深挖地基建造堵截水墻的辦法來克服。
  3. Effect of foundation trench strength to endogen force and failure model of cantilever retaining wall

    基槽強度對懸臂式擋土墻內力和破壞模式的影響
  4. The wall panels were bolted to the concrete foundation.

    墻壁鑲板用螺栓安裝在混凝土地基上。
  5. The regularities of pile - top reaction distribution, the carrying load ratio between pile and raft, the settlement and the imparity settlement of foundation in the frame - tube structure and the single wall are influenced by some factors such as the stiffness of the superstructure, the intensity of the soil under the piles, the length and radius of the piles, the distance between the piles, the thickness and the suspended width of the raft

    對豎向荷載作用下的空間筒中筒結構、樁筏基礎和地基進行了三維有限元分析。研究整體結構和單片墻結構在上部結構剛度、樁端土強度、樁長、樁徑、樁距、筏板厚度、筏板外挑寬度等影響因素變化時的樁頂反力分佈規律、樁筏荷載分擔比、樁基沉降和差異沉降規律。
  6. The job of foundation leveling, factory bound wall building ; scheme and shop drawing designing, the public bidding of the main equipment in domestic and foreign are started

    現正進行土地平整和廠界圍墻建設、方案設計和施工圖設計、國內外主體設備招標等項工作。
  7. Compared with the mud on wall form hole technology, clash stake technology or vibration sink pipe technology used in complex foundation stake forming, it has advantages of no vibration, no pollution, and no noise. in addition, since the concrete pressed into the drill stem sent vibration free concrete to the pump, so it is eas y to ensure the quality of the stake body. compared with the mud on wall and dry work form hole technology, the side obstruction and end obstruction of screw drill press concrete stake have all been accordingly improved, the weight bearing is better, and the transmutation of the complex foundation is less

    其中,螺旋鉆孔壓灌混凝土成樁技術自研製以來,已在多項復合地基工程中進行了應用,較好地解決了軟弱地層成孔困難的問題,適應地質條件范圍廣,成樁速度較快,工期短、工效高;與復合地基成樁時的泥漿護壁成孔工藝、振沖樁工藝或振動沉管工藝施工比較,具有無振動、無污染、無噪音的優點;另外,壓入鉆桿內的混凝土為泵送免振混凝土,因此樁體質量易於保證;與泥漿護壁和干作業成孔工藝相比,螺旋鉆孔壓灌混凝土成樁的側阻和端阻都有相應的提高,樁的承載性能較好,復合地基的變形較小。
  8. In the design, the construction measures such as application of shrinkage - compensating concrete, arrangement of spacing layer between the foundation rock and the bottom slab, adding outside waterproof layer, flexible connection between outlet pipe with side - wall, integerated concrete placement of pump seat with bottom slab and design of reinforcement with application of advanced calculation theory are used according to the characteristics of lager span, larger volume and complex loading conditions of the understructure

    針對下部結構跨度大、體積大、受力復雜的特點,在設計中採取多種措施,包括採用補償收縮混凝土、基巖與底板間設隔離層、增設外防水層、出水管與邊墻採用柔性連接、機座與底板整體澆注、採用先進計算理論指導配筋。
  9. In this paper, the finite - element numerical analysis calculation is applied to the foundation of high - rise and multi - floor building and the evolvement law of stress and displacement of tunnel used by urban traffic to explore the mutual influence between the wall rock of underground space and high - rise building foundation, taking account of the specific construction situation in the " sanmu garden " project in dadukou district in chongqing, from the perspective of underground space static - force structure stability analysis to open a underground tunnel with 6m in span and 7. 5m in height for track traffic 20m below the surface. this paper, taking considerations of three different states, i. e. the natural state without any artificial interference, the state of high - rise buildings on the surface, and the underground tunnel state with excavation for track traffic, and four plane lines and four vertical lines, analyzes and studies the distributing law of stress and displacement of calculation section from the following aspects : ( 1 ) the main stress vectorgraph, displacement distribution graph ( ux, uy ) and chromatogram graph of stress isoline ( 1, 2, xy ) of section under different states ; ( 2 ) the contrastive distribution curve of stress ( 1, 2, xy ) of different plane and vertical lines under the same state ; ( 3 ) the contrastive distribution curve of stress ( 1, 2, xy ) of the same plane and vertical lines under different states, wishing to provide references for underground space utilization and project designing and construction of the tunnel under high - rise buildings in the future

    本文結合重慶市大渡口區「三木花園」開發建設項目,從地下空間靜力結構穩定性分析角度出發,針對在該項目中涉及的高層和多層建築物以及在其地下20米處開挖了一個用於軌道交通的跨度6米,高7 . 5米的地下隧道這一具體工程情況,採用2d - 3d -有限元結構分析程序對高層與多層建築物的地基基礎及其與城市軌道交通使用的地下隧道圍巖的應力與位移演變規律進行了有限元數值分析計算,探索了地下空間圍巖與高層或多層建築物地基基礎之間的相互影響,通過考慮未受到任何人為擾動影響的天然狀態、地表存在多層或高層建築物狀態和地下開挖用於軌道交通的地下隧道狀態等三種不同狀態以及4個水平剖線和4個垂直剖線等不同情況,從以下幾個方面具體分析研究了計算斷面的應力與位移分佈規律: ( 1 )在各種不同狀態下計算斷面的主應力矢量圖、位移分布圖( ux 、 uy )以及應力等值線色譜圖( _ 1 、 _ 2 、 _ ( xy ) )等; ( 2 )相同狀態下不同水平與垂直剖線的應力_ 1 、 _ 2和_ ( xy )對比分佈曲線; ( 3 )不同狀態下相同水平或垂直剖線的應力_ 1 、 _ 2和_ ( xy )的對比分佈曲線等,為今後在對地下空間的開發利用以及在高層建築物地下開挖硐室時的工程設計和工程施工提供參考依據。
  10. " prestress anchor ribbed beam support system " is a new practical support technology which came from soil nailing walls system and un - embedded rank of piles with anchors support system that has been used successfully for 4 years by the author and his company named qingdao deep foundation stabilization engineering co., ltd. it " s mechanism is similar to rank of piles with anchors support system that can not be inserted into the bottom of foundation trench, but it " s ribbed beams are used to replace rank of piles made before excavation so the work cycle can be shortened and the support system cost can be reduced ; meanwhile this system maintains the soil nailing wall " s convenience of digging and supporting

    「預應力錨桿肋梁支護技術」是筆者及所在單位歷時四年在土釘墻和無嵌入多錨排樁兩種支護體系基礎上開發應用成功的一種新型實用性支護技術。其支護機理類似於未嵌入坑底的排樁多錨支護,只是由肋梁代替了開挖前施工的排樁從而提前工期並降低支護造價;同時繼承了土釘墻隨挖隨支護的機動靈活性。自1998年至今該技術已在青島、濟南、煙臺等十幾個深基坑和高邊坡工程中成功應用。
  11. We can say that it can develop the usage of soil nailing wall fill the rank of piles disadvantage a bright future of developing and using. the development, application, advantage and disadvantage about the " prestress anchor ribbed beam support system " is introduced in chapter 1 : it " s supporting mechanism and structural feature is introduced and compared with the soil nailing walls and un - embedded rank of piles in chapter 2 ; design and computer steps and more details about the design methods of the support system are introduced in chapter 3 ; the two important parts named draperies and anchors are introduced on their construction technology in chapter 4 ; three foundation trenches " instances with different depth in different soil are showed in the last chapter 5

    本文在第一章概論部分介紹了「預應力錨桿肋梁支護結構」的發展、應用和優缺點;第二章分析其支護機理、結構特點,並與土釘墻和無嵌入排樁多錨支護進行了結構受力對比分析;第三章介紹該支護結構的設計計算方法步驟,詳細介紹了支護結構各部分的設計方法;第四章介紹預應力錨桿肋梁支護系統最重要的兩個部分:帷幕和錨桿的施工技術;第五章介紹了不同土層不同深度的有代表性的三個基坑工程實例。
  12. Then the judging method is proposed, and the proposed method can consider the stress history and viscosity shear strength of soft soil. in this paper, a fem program dpfbm1. 0 ( double plastic foundation beam method ( version 1. 0 ) ) is established. with this program, the influence of some parameters on foundation excavation is fully studied, the parameters include : compression modulus, cohesive strength, angle of internal ficiction, effective angle of internal friction, the embedded length of the wall and building load

    針對當前國內外彈性地基梁法存在的缺陷,基於對軟土流變性的研究,採取了剪應力判斷彈塑性狀態,以改進和完善基坑工程彈性地基梁法,推導了彈性狀態下地基反力系數的近似解,提出了採用剪應力組合判斷土彈簧彈塑性狀態的方法,編制了相應的彈塑性共同變形法分析程序dpfbm1 . 0 ( doubleplasticfoundationbeammethod ( version1 . 0 ) ) ,並採用該程序分析了壓縮模量、粘聚力、內摩擦角等參數變化對基坑工程的影響。
  13. Secondly, this paper made some theoretic researches on its engineering classfication and applicable scope for this technology ; then combining with project example, this paper carried out scheme design for this technology, and compared some different kinds of underpinning scheme and node and structure design, and put forward the method of " reinforcce steel bar through column " to build pile cap beam, " resistant bend and shear anchored reinforce steel bar " to strengthen column consolidation effect, and the method of " steel plate hoop " to build reinforcing bar connection of the foundation beam, etc. in the process of the consturction scheme research and implement, this paper synthetically elaborated the organizaton for project construction, put forward the construction technical measure of specific aim on the artificial pile, and pile cap beam, and underground adding layer and structure stabilization, and overall structure stabilization and so on. for this project, adopt reinforcing bar concrete to brace hole wall to ensure the safety of engineering in the artificial pile construction, use flexible connection catch to make the cage hoisting easier to simplify the construction process, use the method of earthwork statified symmetrical balance in the process of underground adding layer excavation

    本文首先對于基礎托換與結構加固技術的目的和意義、國內外發展狀況進行了綜合闡述;其次對該項技術工程分類及適應范圍進行了理論上的分析研究;然後結合工程實例對該項技術進行了方案設計,對比幾種不同的托換方案和節點及構造設計,提出了「通筋穿柱法」做承臺梁, 「抗彎抗剪錨筋法」強化柱加固效果, 「鋼板箍法」做地基梁鋼筋連接點等多項技術;在施工方案的研究和實施過程中,對于工程施工組織進行綜合闡述,並就人工挖孔樁、承臺梁、地下加層及結構加固、整體結構穩定等專項施工方案提出有針對性的施工技術措施,人工挖孔樁施工採用鋼筋砼護壁確保挖孔樁的安全成型,使用柔性連接鉤進行鋼筋籠吊裝簡化施工工序;承臺梁施工採用梁主筋橫穿柱身化學膠錨固等;地下加層綜合施工技術採用土方分層對稱平衡開挖,分段挖土做筏基結構自穩等;最後對于該工程實施后的效果分析,說明該項綜合施工技術的可行性。
  14. Gpr is a newly developed hi - tech survey technique used to detect shallow ground electric differences. we applied gpr to more than 100 projects in zhujiang river delta and hongkong, and obtained good reputations. the application scope involves stratigraphics division, outining of filled stones in the muddly beach, geotechnical prospecting of old wall, karst detecting in the limestone terrain, caving detecting, landslide and slop surveing, the division of wea - thering zone, onion weathering zone, fracture zone and fau - lted zone in the granite area, detecting of buried objects cable, metal nonmetal pipe, channel, air raid she - lter etc. underground in the urban city, archaeology, tracing of orebody, coal measures strata division, testing of the dam and grouting site, quality checking of the surface and foundation of the highway

    的一種高新技術。我公司運用世界最先進的探地雷達設備在珠江三角洲地區和香港開展了百余項探地雷達檢測項目,獲得了良好的聲譽,並被作為深圳市建設局1998年度建設科技成果推廣項目。它主要應用於:山體土石方檢測路基不同回填物界面檢測填海回填物巖溶檢測樁基無損檢測地下管道探測地下隱蔽物探測考古斜坡滑體探測地質結構探測湖底探測高速公路路面及路基檢測。
  15. The cutoff wall near the dam axis, the consolidation grouting and the curtain grouting for the foundation, and the high pressure jet - grouted cutoff wall at the toe of the dam form a vertical anti - seepage system for the dam foundation

    大壩軸線附近的防滲墻、基巖固結和帷幕灌漿,以及上游壩腳處的高壓擺噴防滲墻,在壩基構成了垂直防滲體系。
  16. What ’ s more, this paper takes the effect of crown wall rock and mid - board foundation reinforced parametric variation on tunnel structure stress and stability into account grounded on building typical section model of i wall - rock sector

    另外,本文還通過建立類圍巖地段隧道典型斷面模型,分別考慮拱頂圍巖和中墻地基加固參數的變化對隧道結構受力和穩定性的影響。
  17. The jet - grouting has little change to dam structure. its construction is simple and lower cost, it has evident advantage to form dam foundation diaphragm - wall

    高噴灌漿技術對壩體的原結構影響較小,施工較簡單,工程造價相對較低,對病險壩防滲加固具有較明顯的優越性。
  18. In the end, these methods are used to analyze the continuous wall foundation of the outlet - gate in east punan, shanghai and find its internal force under typical load

    文中最後將本文研究成果應用於上海浦南東海出海閘在典型荷載作用下的受力分析,得到了合理的結果。
  19. Pile foundation and continuous wall foundation are widely used in coastal regions, where the character of local soil is always very weak. with the development of design method and the advancement of constructing technology, many new types of pile and continuous wall are applied, like the thin - wall hollow pile and the multi - function continuous wall, which can be used not only as temporary fencing structure, but also as permanent loading structures

    軟土地區常見的地下基礎型式有樁基礎和地下連續墻,近年來隨著設計理論和施工工藝設備的發展,樁基礎及地下連續墻基礎的型式都有了很大的發展,如薄壁筒樁、集擋土、防滲及承重多功能於一體的地下連續墻等。
  20. Using the trial excavations to determine the existence of old walls of fort zeelandia and its size and scale, and to explore the historical meanings of the site and to discuss on the need to excavate the entire wall foundation

    透過熱蘭遮城舊城墻的試掘,驗證舊城墻的存在及規模。同時探索其歷史價值,並藉以討論重現整座墻基之必要。
分享友人