wall pier 中文意思是什麼

wall pier 解釋
墻墩
  • wall : n 1 墻壁;(石、磚等的)圍墻;城墻。2 (形狀、用途)像墻壁的東西,障壁;土堤,堤防。3 (礦井、容...
  • pier : n. 1. 碼頭;防波堤。2. 橋腳,墩。3. 【建築】窗間壁,戶間壁,扶壁;柱,角柱。
  1. The site boundary of the drill yardparade ground of the fireboat station and pier needs to be fenced off by a 3 m high fence wall or fencing with spikes on top ( please refer to item 23 of annex viii to schedule of accommodation and technical schedule for reprovisioning of tsim sha tsui fire station complex in the cd - rom contained in volume two of the ifp )

    滅火輪消防局和碼頭的操場有需要用三米高而頂部帶有尖刺的圍墻或圍欄沿界線圍起來。這方面請參閱重置尖沙咀消防局綜合大樓的空間分配表和技術規格附件viii第23項(載于發展建議邀請書第二冊附連的光碟內) 。
  2. Introduced by prestressed pier in the gate of spillway in xiao xia hydroelectric power station, the text reasonably established 3 - d finite elements mechanic model by the advanced finite elements popular in the world which can expediently impose tension of anchor funicular at its place. it also considered possible diversified combination of loading, and indicated that the effect of its prestressed action is fruitful compared with its conventional counterpart by study of mechanic calculation in comparison. as a result, it vastly improved burdening state of pier. by analysis of 3 - d finite element method, it also gained the stress result indifferent boundary conditions such as breast wall joint support and fixed support, and the displacement result in diversified loading combination. those results gained the instructive and reference value in design of prestressed pier

    本文結合黃河小峽水電站泄洪閘預應力閘墩這一工程實踐,採用國際上已成熟的有限元方法,合理地建立了預應力閘墩的三維有限元模型,該模型可方便地按預應力錨索的點位施加錨索預張拉力,考慮了可能發生的多種荷載工況組合,並與無預應力閘墩結構進行了對比分析研究,指出其預應力效果是明顯的,可以大大改善閘墩結構的受力狀態,通過三維有限元分析,還得到了胸墻簡支、固端不同情況下的應力成果和各荷載下的位移成果,這些成果的取得對預應力閘墩的設計具有一定的指導和參考價值。
  3. In this paper, the pier - wall models respectively built with steel - fiber concrete and ordinary concrete were tested for revealing their early bebaviors of thermal strain and thermal stress caused by adiabatic heating

    為此進行了鋼纖維混凝土和普通混凝土2個墩墻結構的模型試驗,比較了二者的溫度及溫度變形的特性。
  4. Based on the construction practice of steel cofferdam for pier base of main pier no. 6 close to the pylon of sutong bridge, the key techniques for design and construction of the deep water double - wall steel cofferdams of the bridge are described

    摘要以蘇通大橋近塔墩主6號承臺鋼圍堰工程實踐為基礎,介紹該橋深水雙壁鋼圍堰設計、施工的關鍵技術。
  5. Smw method is a kind of pile pier and slab wall, featured by wider application, lower cost and shorter construction period

    摘要勁性水泥土攪拌連續墻( smw )作為排樁和板墻式圍護結構的一種,以其適用性強、圍護成本相對較低、施工周期短而倍受關注。
  6. So the deterministic analysis method for seismic response of thin - wall hollow pier is discussed in this paper, find the character of the structure ' s linear and nonlinear response when earthquake takes place, the purpose is to provide a reference to engineer design dept to finish their special program of analyzing pier ' s seismic response, some advice have been given for pier ' s design

    有鑒於此,本文對薄壁空心墩地震反應的確定性分析方法進行了一些探討,研究了薄壁空心高墩在地震作用下線性和非線性反應的一些特性,其目的是為工程設計部門應用時程分析法編制專用的環形薄壁空心墩抗震分析軟體提供一個參考,同時對薄壁空心墩的抗震設計提出一些建議。
  7. Frame supported short pier shear wall structure with transition floors is a useful structure pattern with good ability in resisting seismic load. the lower part is frame with large opening column - grid while the upper part uses short pier shear wall with wide openings. so this structure decreases the difference between stiffnesses of lower part and upper part

    帶梁式轉換層的短肢剪力墻結構,其下部結構為大開間的柱網框架,上部結構採用開洞較大的短肢剪力墻,有效地降低了轉換層上下結構之間的剛度差異,因而是一種抗震性能較好的結構型式。
  8. After changing the ratio of spans and the thickness of the walls of the double thin - wall pier, parameter analysis is processed under dead load and annual temperature change and sunshine temperature differential

    然後,通過改變跨徑比與墩梁剛度比設計基本參數,進行結構在自重荷載、年溫度變化和日照溫差三種荷載工況下的受力分析。
  9. For three - short - pier shear wall under vertical loads, the results remain the same, and transfer beam at this moment will work with the middle pier, constituting a t - shape beam to sustain the moment and axial tensions together. 4. under the horizontal loads, the inner stress distribution in the frame supported short - pier shear wall shows similarities with that of the short - pier shear wall underneath the fastened supports

    4 、水平荷載作用下,框支短肢剪力墻墻肢內的應力分佈形式接近於下部固支的短肢剪力墻的應力分佈;轉換梁承受上部墻肢傳遞的拉力、剪力和彎矩,當短肢剪力墻墻肢數量較多時,轉換樑上、下邊緣拉、壓應力交替出現,剪應力的最大值處于洞口下方的轉換梁體內。
  10. Bridge with high pier and long span uses high - strength materials and thin - wall structure and often adopts segmental construction method, the effect of concrete elastic modulus and creep and shrinkage are significant, so aging stability analysis research has important significance

    又由於此類橋梁大都採用節段施工方法,施工周期短,混凝土的彈性模量變化、徐變收縮等時效因素的影響顯著,開展大跨徑混凝土橋梁施工全過程穩定性研究具有重要意義。
  11. With the development of railway construction. it needs more and more high bridges in mountain areas, so the pier becomes higher than before. and it becomes from solid to hollow. presently, it has little research on the thin - wall hollow pier ' s vibrational characteristic especially on non - liner characteristic, and it has scarcely referred in the bridge ' s criterion about earthquake resistance, so it has great sense on fulfillment of the our bridge ' s criterion to research the thin - wall hollow pier ' s seismic response

    而隨著鐵路建設事業的發展,山區鐵路要求修建更多的高橋,因此橋墩越來越高,橋墩也由實心變為空心,目前對于薄壁空心墩振動特性尤其是非線性特性的研究較少,橋梁抗震設計規范中也少有涉及,研究薄壁空心墩的地震反應,對完善我國橋梁設計規范具有重要的意義。
  12. The following task has been finished : ( 1 ) analysis the pier ' s seismic force theory and dynamics method. ( 2 ) resarch the computational model and method of the thin - wall hollow pier when it is predigested plane bar structure ; ( 3 ) the paper complete the program to compute the pier ' s seismic response, which can analyze pier ' s linear and nonlinear response, also its correctness has been validated. ( 4 ) use the program to compute some samples, some problems and their relevant resolvent have been offered

    本文完成了以下幾項工作: ( 1 )分析了橋墩抗震計算的地震力理論和橋墩結構抗震動力學方法; ( 2 )研究了將橋墩簡化為平面桿系結構時結構在地震作用下的計算模型和計算方法; ( 3 )編制了薄壁空心墩地震反應分析程序,可以對橋墩線性和非線性反應作出分析,並驗證其正確性; ( 4 )通過改變設計參數進行對比計算,提出了一些在橋墩抗震設計中應該注意的問題以及相應的解決方法。
  13. 2. for frame supported double - short - pier shear wall under vertical loads, the non - noding area of transfer beams turns into a member of flexure and tension with small axial force, and bending stress dominates in the stress distribution on the cross - section. in the nodding area, the axial force increases while the bending effect is small

    2 、框支雙肢短肢剪力墻在豎向荷載作用下,轉換梁的非節點區為一拉彎構件,軸向拉力較小,截面的應力分佈以彎曲應力為主;在節點區,軸向拉力效應增大,而彎曲效應很小。
  14. Steel wall cofferdam construction of the no. 3 main tower pier for tianxingzhou yangtze river bridge

    天興洲長江大橋3號主塔墩鋼吊箱圍堰施工
  15. To date, structure engineers still adopt designing method of frame - shear wall structure rather than considering common action of pier wall and transition beam and the problem of stress - distribution complication arises from here. this paper provides the research object which is a 13 - stories frame supported short pier shear wall structure with different pier strength coefficients and integrity coefficients, focus on stress distribution of two - short - pier shear wall and three - short - pier wall under vertical loads and horizontal loads. it also concludes variational rules of internal force of transition floors in this structure

    本文以具有不同整體性系數和肢強系數的13層框支短肢剪力墻結構為研究對象,運用ansys8 . 1有限元分析軟體,研究了雙肢墻、三肢墻和轉換梁等結構構件在豎向荷載與水平荷載作用下的應力分佈特點,總結了帶梁式轉換層的短肢剪力墻結構中轉換梁的內力隨著墻肢截面高度的變化規律,為框支短肢剪力墻結構的分析和設計提供了理論基礎。
分享友人