waste steam turbine 中文意思是什麼

waste steam turbine 解釋
廢汽滑輪機
  • waste : adj 1 荒蕪的,不毛的,荒廢了的;未開墾的;荒涼的。2 廢棄的,無用的;多餘的;身體內排泄的。vt 1 糟...
  • steam : n 1 蒸汽,水蒸氣,水氣,霧,蒸氣壓力。2 〈口語〉精神,精力,氣力;怒氣。3 輪船,乘輪船旅行。vi 1 ...
  • turbine : n 【機械工程】(渦)輪機,葉輪機,汽輪機,透平機。 a hydraulic [water] turbine 水輪機。 a steam t...
  1. The influence concerning calorific value of municipal solid waste ( msw ) fuel upon the boiler efficiency, and the problem of steam turbine ' s suitability for variabe operation condition have been analysed by using practical calculation example

    摘要針對垃圾燃料熱值對鍋爐效率的影響及汽輪機的變工況適應性等問題,結合實際算例進行了分析。
  2. Based on sufficient investigation of relative field at home and abroad, combined with actual state of engineering, aimed at the characteristics of low temperature waste heat power generation, under adequate consideration of economical efficiency, the thermodynamic system models on the base of rankine - cycle, which mainly consisted of evaporator, ehd condenser and steam turbine - generator group with r11 as working fluid, were constructed after comparing the current low temperature waste heat power generation systems

    文中在對國內外相關領域進行了充分調研的基礎上,結合工程實際狀況,針對低溫余熱發電特點,充分考慮經濟性的前提下,對現行的低溫余熱發電系統進行比較,選擇了以具有低沸點的r11為工質,由蒸發器、 ehd冷凝器、汽輪機-發電機組等主要部件組成的有機朗肯循環熱力系統模型。
  3. Key siemens projects in zhejiang includes ultra supercritical steam turbine power plant in yuhuan, container capacity upgrade for beilun container terminal phase iv of ningbo port, advanced imaging system for zhejiang people ' s hospital and turn - key project for the hangzhou qige waste water plant, to just name a few

    西門子在浙江的主要項目包括:玉環電廠超超臨界汽輪機組,寧波港北侖四期集裝箱碼頭集裝箱容量升級,浙江省人民醫院先進的影像系統以及杭州市七格污水處理廠的整體承包工程等。
  4. Further, waste heat recovery boiler and steam turbine are combined to improve system efficiency, resulting combined cycle generation. main characteristics of this technology are as follows

    為進一步提高系統效率,可利用氣化系統和內燃機產生的余熱,通過余熱鍋爐和蒸汽輪機實現聯合循環發電。
  5. This essay has touched upon the following work : 1. has built up theoretic models including static mathematic models of air compressor, combustion chamber, gas turbine, waste heat recovery boiler and steam turbine which are deduced according to the feature and theory of the equipment of the object of study. upon establishment of each model based on the actual conditions, a method of multiple imitation and combination is applied to parts which have already got characteristic curves to have achieved quite accurate curves whilst the method of neural net is applied to the parts which have no characteristic curves for establishment of models

    本文進行了以下的主要工作:建立理論模型,根據對象的實際設備的特點和理論關系推導壓氣機、燃燒室、燃氣輪機、余熱鍋爐、汽輪機的靜態數學模型;根據本研究的實際情況,在建立各部件模型時,對已有特性曲線的部件,採用多項式擬合的方法,得到較為準確的特性,而對部分沒有曲線的特性,則採用神經網路的方法建立模型。
分享友人