water boundary 中文意思是什麼

water boundary 解釋
水界
  • water : n 1 水;雨水;露;〈常作 pl 〉 礦泉,溫泉;藥水。2 〈常 pl 〉水體;水域;水道;海;湖;河;海域;...
  • boundary : n 邊界,疆界,限界 (between);(球場)邊線;界標;界限,范圍,分野。 aboundary dispute 邊界糾紛...
  1. From roundwood reservoir in county wicklow of a cubic capacity of 2, 400 million gallons, percolating through a subterranean aqueduct of filter mains of single and double pipeage constructed at an initial plant cost of 5 per linear yard by way of the dargle, rathdown, glen of the downs and callowhill to the 26 acre reservoir at stillorgan, a distance of 22 statute miles, and thence, through a system of relieving tanks, by a gradient of 250 feet to the city boundary at eustace bridge, upper leeson street, though from prolonged summer drouth and daily supply of 12 1 2 million gallons the water had fallen below the sill of the overflow weir for which reason the borough surveyor and waterworks engineer, mr spencer harty, c. e., on the instructions of the waterworks committee, had prohibited the use of municipal water for purposes other than those of consumption envisaging the possibility of recourse being had to the importable water of the grand and royal canals as in 1893 particularly as the south dublin guardians, notwithstanding their ration of 15 gallons per day per pauper supplied through a 6 inch meter, had been convicted of a wastage of 20, 000 gallons per night by a reading of their meter on the affirmation of the law agent of the corporation, mr ignatius rice, solicitor, thereby acting to the detriment of another section of the public, selfsupporting taxpayers, solvent, sound

    但是由於夏季久旱,再加上每天供水一千二百五十萬加侖,水位已降到低於排水口。都市監察官兼水道局技官土木工程師斯潘塞哈蒂奉水道局的指示鑒于有可能會像一八九三年那樣被迫利用大運河和皇家運河那不宜飲用的水,除了飲用外,下令一律禁止使用市裡供應的自來水。尤其是南都柏林濟貧院,盡管限定用六英寸的計量器,每個貧民每日配給十五加侖水,然而在市政府法律顧問辯護律師伊格內修斯賴斯的監督下,經查表證實,每夜要浪費兩萬加侖水,從而使院外的社會各階層也就是自費並有支付能力的納稅者們蒙受損害。
  2. Excavation of tunnel will lead to local geotectonic stress release and redistribution around tunnel ; the appearance of new outlet boundary will lead to outlet seepage of subsurface water and the change of mountain seepage field

    隧洞開挖將引起局部地應力的釋放及洞周附近的地應力的重新分佈;隧洞開挖后新的出水邊界的出現將導致地下水的大量出滲及山體滲流場的改變。
  3. First, the system boundary of machines affecting the shafts, such as the guide bearings, seal, electrical and hydraulic forces, the water in the runner etc, is analyzed. and the mathematic model of the system boundary of the machine is built

    本文首先分析了對機組主軸系統影響較大的系統邊界條件,如導軸承、水封、電磁拉力、轉輪處的水體等,並分別建立了它們的數學模型。
  4. This procedure can imitate the single well pumps water the chronometer calculates at all point water level in district declines deep with horary variety ; study the sport law of the rivers ; solve definitely flow draw water issue wanton boundary the wells of termses, predict that dives under water in the location, guide and construct and excavate the progress, appraise the rationality of the precipitation scheme

    此程序可以模擬單井抽水時計算區域各點水位降深隨時間的變化,研究水流運動規律;求解任意邊界條件下的井定流量抽水問題,預測潛水位,指導施工開挖進度,評價降水方案的合理性。
  5. All over the sky stars, the broad interspace do not look the boundary, the miner, you use that sturdy double arm to trade our material, you used the sweat to water our homeland

    滿天的星辰、廣闊的星際望不到邊際,礦工,您用那粗壯的雙臂換來我們的材料,您用汗水澆灌了我們的家園。
  6. The boundary is demarcated by yellow light buoys deployed at the corners of the marine park. the landward boundary follows the high water mark along the coastline of the islands

    公園四個角落設有黃色燈號浮標,以標明界線,靠近陸地的界線則沿島嶼海岸的高潮線劃定。
  7. The segment of the boundary above the water table and below the phreatic surface is called the seepage face.

    水面以上和潛水面以下的一段邊界叫做滲出面。
  8. This represents a boundary where the water seeps out of the soil into air.

    這個邊界是水從土層中滲出進入空氣的地方。
  9. Designning well tube and drill - hole diameter in order to increase thickness of both annular packing gravel and water - resisting clay, nylon net packing around well tube filters, designing filter layer on the boundary between packing gravel and water - resisting clay and ramming the gravel by working the piston into the well after gravel packing completion and the filling clay for salt - water resisting etc. we succeeded in constructing 3 drinking - water wells in minqin county, proved the affectivity and feasibility of using it and giving a certain technical demonstration of construction of drinking - water well in the same similar to this area

    通過孔徑與管徑的調配設計,增大環狀粒料層和止水粘土層的厚度;濾水管外包尼龍紗網;粒料與止水粘土接觸界面上設計反濾層;填粒后先行拉活塞利用水力夯實粒料層,再投粘土球止掉上部鹹水等措施,在民勤縣三口人飲水井施工中取得顯著效果,證明了該套成井工藝的有效性和可行性,有望為同類地區人飲水井施工提供技術示範作用。
  10. This paper establishes a model simulating dam actual placing process and considering the non - continuity of initial temperature on the boundary of new and old concrete, daily air temperature change, concrete - placing temperature, hydration heat, heat insulation on boundary, water - storing process, placing intermission and curing with water. the calculation of stress field considers the concrete weight, static water pressure, thermal stress, different autogenous volume change between rcc and normal concrete, change of elastic modulus of concrete with age and creep action

    考慮了乞今最為全面的初始條件和邊界條件,包括模擬壩體的實際升程過程,考慮了新老混凝土接觸面上的初始溫度不連續,逐日的氣溫變化,混凝土的入倉溫度,水化熱溫升,邊界保溫,水庫蓄水過程,澆築間歇以及灑水養生等因素;應力場的計算考慮了混凝土的自重,靜水壓力,溫度應力,常態混凝土與碾壓混凝土不同的自生體積變形,混凝土的彈性模量隨齡期的變化以及徐變的作用。
  11. Topics include : molecular and turbulent diffusion, boundary layers, dissolution, phase partitioning, bed - water exchange, air - water exchange, settling and coagulation, buoyancy - driven flows, and stratification in lakes

    探討課題計有:分子和紊流擴散、邊界分層、溶解、相之間的分割、底床與水間的交換作用、空氣與水間的交換作用、沉降和混凝、浮力流以及湖泊分層作用。
  12. Study achievement appears as following aspects : ( 1 ) yellow river estuary gate river flow and tide flow mixed area is not keep standing deposition status, on special income water and sediment conditions, boundary conditions and oceanic power conditions, this area may on the scour status ; ( 2 ) observed from estuary sediment deposition distributing process : delta and sea offing area sediment deposition vary trend is similar, each part sediment deposition scale varies as wave shape ; ( 3 ) on estuary gate, affect the sediment deposition factors, primary factors are tide prop, the gate widens gradually, estuary gate have branches, brine induced flocculation. this paper study the estuary gate widen, estuary gate have branches to affect the river channel deposition in quantity ; ( 4 ) based on field measured data, for the first time, deduce the estuary sediment deposition and distributing regress formula which can estimate estuary different areas sediment deposition volume ; ( 5 ) this subject demonstrate the estuary delta coastline dynamic balance conception, build the relationship between the estuary income sediment with deposition land area, draw the following important conclusion : when estuary years - averaged income sediment keeps at 345 million tons, the delta coastline may on the dynamic balance status. ( 6 ) this subject firstly brings up estuary sediment optimized control conception, and has the primary study on the macroscopically optimized control conception method

    研究認為: ( 1 )黃河河口口門逕流潮汐區域並非持續保持淤積狀態,在特定的來水來沙、邊界條件和海洋動力條件下,該區域可以處于沖刷狀態; ( 2 )從河口泥沙沉積分配的過程來看:三角洲與濱海區泥沙的沉積變化趨勢是基本一致的,各部位的泥沙沉積比例變化基本呈波動狀態,且三角洲與濱海區泥沙的沉積比例與來沙量密切相關,基本成正比關系; ( 3 )在口門處,影響泥沙沉淤的因素主要集中在潮汐頂托、口門逐漸加寬、河口門分汊、鹽水造成絮凝等,本報告主要對口門加寬,口門西妥理工大學工程碩士專業學位論文分漢對河道淤積的影響進行了定量分析: (一扣根據實測資料首次建立了河贖流路泥沙沉積分配的回歸計算式,據此可以預估計算河口不同區域泥沙的沉淤量; 、 5 )本項研究首次論證了河口三角洲岸線動態平衡的概念,並建立了黃河河口來沙量與造陸面積的相關關系,得出了當河口多年平均來沙量維持在3 . 45億t時其河口三角洲岸線則可能處于動態平衡狀態的重要結論; 『 6 )本項研究首次提出了河口泥沙優化調控的概念,並對其宏觀優化調控模式進行了初步探討。
  13. By using a same boundary dimensions high efficient and new type copper exchanger substituted carbon steel oil condenser, and increasing flow rate of circulation water to reduce the temperature of freezing oil which feeds into compressor stage, to eliminate the malfunction during compressor operation, and improve running efficiency of the machine

    採取將碳鋼材質的油冷卻器更換成等外形尺寸的高效新型銅管換熱器、增加循環水流量的方法,降低了進入二段壓縮機冷凍油溫度,排除了壓縮機運行中的故障,改善了機組的運行效率。
  14. Research on safety mining boundary of coal mining above limestone with pressurized water in gaokeng mine field

    高坑井田承壓水上採煤安全開采邊界的研究
  15. It covers an area of about 260 hectares. the seaward boundary is demarcated by linking the tips of heung lo kok and kwun tsoi kok through the northern end of flat island ( ngan chau ) and moon island ( mo chau ). the landward boundary follows the high water mark along the coastline

    此海岸公園海域面積約佔260公頃,其海上界線以連接向螺角與棺材角尖端的直線為限,並穿越銀洲和磨洲的北端;陸上界線則隨岸邊的高潮線劃分。
  16. The main innovations of this dissertation are just as follows : firstly, mathematical model on the compensation mechanism of economizing on water is set with the theory of agent of information economics, quantitative boundary of compensation is defined, and quantitative relationship between the compensation input and the effect of economizing on water is revealed

    本項研究主要有以下創新:其一,運用信息經濟學中委託-代理理論建立了節水補償機制的數學模型,確定了節水補償的數量界限,揭示了節水補償投入與節水效果之間的數量關系。
  17. The smuggling racketeers whose boats speed crazily over hong kong s territorial water boundary have the most cellular phones and are directed by mobile gangsters on land. computers aid police in many ways

    走私集團的船艇能飛快越過香港領海邊界,它們擁有最先進的手提電話,並由在陸上四處走動的匪徒通風報訊。
  18. On some occasions when the calf surfaced, it seemed to misjudge the air water boundary and shoot its head too far out of the water

    有時幼豚浮上水面的時候,往往把頭伸得太高,好像錯誤估計海面的高度似的。
  19. It is proved that the error caused by mixing water - land information on boundary may be eliminated by choosing the research waters within the water boundary under designed lowest navigable stage, and the precision of remote water - depth of river may be enhanced

    研究表明,用最低通航設計水位時的水域邊界裁取研究水域,可消除邊界點因水陸信息混合產生的誤差,提高遙感水深精度。
  20. High precision and good innate safe character are needed in the measurement of oil tank multi - parameters such as liquid level and oil - water boundary

    油罐液位溫度參數的測量,要求較高精度和良好的本質安全性能。
分享友人