water conservancy project 中文意思是什麼

water conservancy project 解釋
水力工程項目
  • water : n 1 水;雨水;露;〈常作 pl 〉 礦泉,溫泉;藥水。2 〈常 pl 〉水體;水域;水道;海;湖;河;海域;...
  • conservancy : n. 1. (天然資源的)管理,保管,保護,保存;水土保持;資源保護區。2. (河、港等的)管理局[委員會];〈集合詞〉管理員。
  • project : vt 1 投擲,拋出;發射(炮彈等);噴射。2 使突出,使凸出。3 設計,規劃,計劃,打算,籌劃。4 投影;...
  1. The dump vehicle is suit to load and disoharge the piled material, such as the loose soil, finc sand, fertilizsr, waste. so it can be wildly used in many fields, such as construction site, iuad maintenance, municipsl works, railroad consiruction, dock transport, brickfield, and carry in warehouse, it can be used in many cngineering construction, stch as water conservancy project, onvirenment engineering and gardens. it is the ideal shourt haul means within 1 km

    該產品適用於裝卸鬆土、細砂、肥料、垃圾、水泥等成堆堆放的物料,因此是廣泛用於建築施工、公路養護、市政工程、鐵路建設、碼頭運輸、窖廠作業、倉庫搬運以及水利、環衛、園林等工程建設,是運輸半徑為1km以內理想的短途運輸工具。
  2. Excavation method for inclined shaft excavation in headrace tunnel at zipingpu water conservancy project

    紫坪鋪工程引水系統復雜地質條件下洞群進洞技術
  3. The fanole water conservancy project somalia

    費諾力水利工程索馬里
  4. Drawing - up technique for documents of water conservancy project tender

    水利工程基建項目投標標書的編制技巧
  5. Proceeding with the analysis of water resource peculiarity of jilin province, the authors bring forward that effective gathering and using of rainwater can supplement the gross amount of rainwater in valley, probe into rainwater resources use in jilin province : first is to make rainwater resources use plan in valley program, secondly is to construct gully dam system according to water and soil conservation project, to strengthen sloping field collection rain ' s project and forest - grass construction, to increase storage space, thirdly is to fully utilize field project and water conservancy project to gather rain water, intercept rainfall on the spot so as to restore water environment

    摘要從吉林省水資源特點分析入手,提出了雨水資源的有效集蓄利用是補充流域水資源總量不足的重要因素,探討了在吉林省雨水資源主要利用途徑是首先在小流域規劃中作好雨水資源利用規劃;其次是建設以水土保持治溝骨幹工程為主的溝道壩系,強化坡面集雨工程和林草植被建設,增大貯水空間;第三是充分利用田間工程和水利工程集雨蓄水,使降雨就地就近被攔蓄,最終使水環境得以修復。
  6. Talk about construction management of modern water conservancy project

    論現代水利工程項目施工管理
  7. Formulation of budget estimate financed by foreign funds at zipingpu water conservancy project

    紫坪鋪水利樞紐工程外資概算的編制
  8. Construction schedule management of zipingpu water conservancy project

    紫坪鋪水利樞紐工程進度管理的實踐
  9. Brief talk on zipinpu water conservancy project construction power management

    淺談紫坪鋪水利樞紐工程施工用電的管理
  10. Flood control during construction period at zipingpu water conservancy project

    紫坪鋪水利樞紐工程施工期防汛工作淺析
  11. Xianing port water conservancy project structure first expansion method pretressing force board construction technology

    霞凝港水工結構先張法預應力空心板施工技術
  12. Chapter four explores traditional mode of water conservancy machinery manufactory and both the cons and pros, devises the framework for mass customization of water conservancy machinery upon the case study of " mass mobile dam ". chapter five concludes whole dissertation to present newly established viewpoints while pointing out flaws in this dissertation with preliminary scenarios and planning on how mode of mass customization ean be implemented in water conservancy project

    第五章對全文進行總結,並在總結的驀礎上,歸納出論文的創新點,同時,也指出論文存在的不足之處,並對大規模定製(就)模式在水利機械中的工程應用提出了進一步研究的初步設想和展望。
  13. In the construction period, the shiplocks are managed through the method of being entrusted to three gorges navigation administration of communication ministry by the proprietor of water conservancy project ( i. e. three gorges development company ), by which the project ' s construction smoothness and gezhouba dam ' s and three gorges dam ' s navigation

    三峽水利樞紐施工期船閘管理採取的是由業主(三峽開發總公司)委託交通部所屬長江三峽通航管理局管理的方式,該方式保障了三峽工程施工順利和葛洲壩、三峽航運暢通,但畢竟是工程施工期的過渡辦法,工程完工後必須建立武漢理工大學工程碩士學位論文新的船閘管理體制。
  14. This paper, through the research on the implementing of gaobazhou water conservancy project, demonstrated that the project is technical feasible, economic reasonable, and is conform to the state macro policy in external environment. described the full - aspect management on the design process of gaobazhou water conservancy project, fully demonstrated that the selection of design scheme and the design quality is directly related to the investment, quality and progress control of the project ; described the full - aspect management on the construction process of gaobazhou water conservancy project, discussed the management procedure and manner of supervisor in the construction process, how does the contractor to complete construction task scientifically and reasonably by following the certain supervision procedure based on the contract ; described the management on the procurement of gaobazhou water conservancy project, clarified these cautions to be taken during material and equipment procurement through the discussion on the content of procurement contract ; described the project acceptance and after - event evaluation of gaobazhou water conservancy project, fully defined the content for the final acceptance of the project ; fully described the comprehensive management carried out on gaobazhou water conservancy project, mainly focused on the study of information management, communication management, conflict management and risk management, which ensured the smooth execution of the project

    本文通過對高壩洲水利樞紐工程項目實施的研究,論證了高壩洲水利樞紐工程項目在技術上是可行的,在經濟上是合理的,在外部環境方面符合國家的宏觀政策;闡述了高壩洲水利樞紐工程設計過程的全面管理,充分論證了設計方案的選擇及設計質量的高低,直接關繫到工程項目的投資、質量和工程進度的控制好壞;闡述了高壩洲水利樞紐工程施工過程的全面管理,論述了監理在施工過程中的管理程序和方法,施工單位遵循一定的監理程序,依據施工合同科學合理地完成施工任務;闡述了高壩洲水利樞紐物質設備的采購管理,通過對采購合同內容的論述,明確了物質設備采購時應注意的問題;闡述了高壩洲水利樞紐工程項目驗收及后評價,明確了高壩洲水利樞紐工程項目竣工驗收的內容;較全面地闡述了高壩洲水利樞紐工程項目實施的綜合管理,重點研究了保證高壩洲水利樞紐工程項目順利實施的信息管理、溝通管理、沖突管理和風險管理。
  15. Design guide of construction diversion for hydropower and water conservancy project

    水電水利工程施工導流設計導則
  16. Design guide for construction planning of underground engineering of hydropower and water conservancy project

    水電水利工程地下工程施工組織設計導則
  17. In this paper, the performance, application and composition about plastic concrete, self - congealing mortar and hardened slurry are analysed on the basis of summarizing type, characteristic and developing course of cut - off wall ' s material in water conservancy project

    摘要在總結我國水利工程防滲墻墻體材料類型、特點和發展歷程的基礎上,著重對塑性混凝土、自凝灰漿和固灰漿等柔性墻體材料的組成、性能指標和應用情況做了比較科學的分析和探討。
  18. Design guide of construction transportation for hydropower and water conservancy project

    水電水利工程施工交通設計導則
  19. Design guide of construction general layout for hydropower and water conservancy project

    水電水利工程施工總布置設計導則
  20. Design guide of construction equipment selection for hydropower and water conservancy project

    水電水利工程施工機械選擇設計導則
分享友人