water power resources 中文意思是什麼

water power resources 解釋
水力資源
  • water : n 1 水;雨水;露;〈常作 pl 〉 礦泉,溫泉;藥水。2 〈常 pl 〉水體;水域;水道;海;湖;河;海域;...
  • power : n 1 力,力量;能力;體力,精力;(生理)機能;〈常 pl 〉才能。2 勢力,權力,權限;威力;政權;權...
  • resources : 漁業資源
  1. Xishan economic development zone ( xsedz ) was set up in 1992. it is divided into three parts : the foreign investment industrial park, thelogistics park and the administrative center. with over ten years of experience, xsedz is able to provide a complete infrastructure of water, power, steam, natural gas, sewage, drainage, telecommunications, and supporting facilities such as the direct customs clearance centre, public bonded warehouse, modern logistics center, one - stop service centre, human resources centre, one - stop service centre, and apartments for expatristes etc

    江蘇省錫山經濟開發區成立於1992年,開發區內合理規劃,設有外商工業區、物流區、中心商務區三個功能區,經過十多年的建設,不僅建成了「九通一平」的基礎設施,還配備了包括海關直通點、公共保稅倉庫、現代物流中心、人力資源中心、投資服務中心、外商公寓等在內的綜合服務設施。
  2. The most effective ways of protecting and exploiting the natural resources in the bamian mountain area can be summarized as follows : to stick to scientific development concepts, to protect the vertically distributed forest zones and develop biological agriculture, to exploit water power and tourism, to make biological migration of people and raise the income of farmers

    堅持科學發展觀,根據八面山區自然資源的特點,保護好森林垂直分帶、發展生態農業、開發水能和旅遊業、開展生態移民、提高農民收入是保護和開發八面山區自然資源最有效的方法。
  3. Article 3 the term “ water resources ” as referred herein shall mean utilization of artificial means or control of surface or ground waters for the purposes of flood control, tide water defense, irrigation, drainage, leaching of injurious salt, soil conservation, water reservation, silt dredge, water supply, pier construction, navigation, and water power development

    第3條(水利事業之定義)本法所稱水利事業,謂用人為方法控馭,或利用地面水或地下水,以防洪、御潮、灌溉、排水、洗咸、保土、蓄水、放淤、給水、築港、便利水運及發展水力。
  4. The mission of the conservation and production research laboratory is to 1 ) develop improved water management methods and irrigation technology for sustaining or enhancing crop productivity, improving water use efficiency, reducing ground water use, and enhancing water and soil quality ; 2 ) develop management practices that optimize the use of water, soil, climatic, and nutrient resources for economically and environmentally sustainable crop and livestock production systems under dryland and limited - irrigation conditions ; 3 ) develop systems for utilizing renewable energy sources ( wind, solar, and biofuels ) for pumping irrigation, livestock, and farmstead water and generating electric power ; 4 ) develop regimens that reduce environmental risks posed by accumulations of feedlot wastes by reducing the phosphorus content, improving nutrient utilization, and applying manure to grasslands

    描述:美國農業部保持與生產研究實驗室的主要任務是: 1 .開發水資源管理方案或灌溉技術,提高用水效率,減少地下水使用,改善土壤和水質; 2 .使水資源、土壤資源、氣候和養分資源達到最優化,以保證在乾旱和灌溉條件有限的地區種植業和畜牧業能可持續發展; 3 .開發可再生能源用於灌溉、畜牧飼養和發電; 4 .通過減少磷成分,降低飼養場廢棄物的環境風險,將其施用於牧草地,提高養分利用率。
  5. In charge of one of major subjects of the national eighth five - year plan, i. e. " study on shotcreting techniques of polyacrylate emulsion cement mortar for impermeability coating of pu ding rcc dam ", the achievement of which has been appraised by the ministry of electric power and evaluated as reaching national leading level. 2. in charge of the major subject aided by the committee of national natural science funds, " study on durability of high bolumes of fly ash concrete ", the first phase achievement of which has been commended by the committee. 3. in charge of one of major subjects of the national ninth five - year plan, i. e. " study on high performance concrete in marine engineering, design and construction ". 4. acting as one of editors - in - chief of " technical specification for abrasion and cavities resistance of concrete in hydraulic structures ", which is issued by the ministry of water resources. 5. by providing the repairing and strengthening schemes on seepage and cracks of the basement of nanjing lukou international airport, the air traffic opening of the airport was ensured as scheduled. 6. consulting services on techniques of high performance and abrasion - erosion resistance concrete for three - gorges project, anti - corrosion of reinforced concrete strutures for the ore port of shanghai baoshan iron and steel works, mass fly ash concrete for jiangyin yangtze river bridge and pumping concrete for nanjing yangtze river second bridge

    主持國家「八五」攻關項目「普定碾壓混凝土壩上游面丙乳砂漿防滲層大面積施工工藝研究」 ,成果通過部級鑒定,評價屬國內領先水平; 2 .主持國家自然科學基金重大項目「高摻量粉煤灰混凝土的長期性能研究「 ,階段成果獲國家自然科學基金委通報表彰與獎勵; 3 .主持國家「九五」攻關項目「海工高性能混凝土成套技術研究」 ; 4 .水利部「水工混凝土抗沖磨防空蝕技術規范」的主編之一; 5 .為南京祿口國際機場地下室修漏與裂縫補提出技術方案被采納並實施,為機場如期通航作出貢獻; 6 .為三峽工程抗沖磨高性能混凝土技術、上海寶鋼礦石碼頭鋼筋混凝土防腐蝕技術、江陰長江大橋大體積粉煤灰混凝土技術、南京長江二橋泵送混凝土技術等提供咨詢建議。
  6. Britain had many rivers, which were useful for transport but also for water and steam power. britain also had useful mineral resources

    英國許多河流不僅用於交通,還提供水力及蒸汽動力。英國還有可用的礦產資源。
  7. In view of the rapid development of electric undertaking and a sharp increase of steel products consumption, the state development planning commission, the former state water resources and hydropower ministry and state energy ministry have been urging that the building of steel towers should be strictly controlled in the construction of transformer substations ; and warning that the need of the present 500kv power transmission and transformer trusses can hardly be satisfied by ordinary steel and concrete electric poles or prestressed concrete poles, which have endangered the operation and longevity of the high voltage transmitting line due to the common problem of cracks by gravity

    隨著電力工業建設的迅速發展,鋼材的用量急劇增長,為此,國家計委,原水電部和能源部一再強調在輸變電工程建設中,應從嚴掌握自立式鐵塔的建設。然而,一般的鋼筋混凝土電桿或與預應力混凝土電桿,較普遍地存在著縱向裂縫問題,嚴重影響了高壓輸電線路的安全運行及其使用壽命,已不能適應高壓輸電桿塔和變電構架的要求。
  8. Item construction conditions : tungsten sandstone and its processing is our county ' s traditional industry. we take the advantage not only in market and resources but also in processing technology. the corporation is located at wuji township of hengdong county where there is abundant water, electric power and convenient transportation. the corporation yard area is broad and ease to deal with wastes. the item is a promising project

    三、項目建設條件:鎢砂及產品深加工是我縣的傳統產業,有市場、資源、加工技術優勢,公司位於衡東縣吳集鎮,供水、供電良好,交通方便,廠區面積寬敞,三廢處理簡單,項目發展潛力大。
  9. We can tap into china ' s vast and stable supply of resources, such as human capital, land, water, and power supply

    中芯國際在中國不僅可以貼近中國飛速成長的電子產品市場,更能得益於中國充沛且穩定的資源供給,如人力、土地、工業用水和電力供應等。
  10. On the basis of anatomizing the condition of hydrogeology with zhongliang water resources and power engineering, combined with the data analysis of flux with surface water, aquatic chemistry, and experiment of tracing, the condition of karst leakage in the region of reservoir is educed. the concept of reservoir leakage with these information is put forward, the leakage quantity of karst water in the region of reservoir with the method of water equilibrium is applied

    在仔細分析中梁水利水電工程庫區水文地質條件的基礎上,結合地表水測流資料、水化學分析資料及示蹤連通試驗資料,得出水庫區巖溶滲漏條件,並在此基礎上提出水庫滲漏概念模型,採用水均衡法計算出庫區的巖溶水滲漏量。
  11. With the great development of west china, a new prosperous period of water power exploitation in the rugged mountainous area of western china, where is rich in hydroelectric resources, is coming

    隨著西部大開發戰略的實施,西部高山峽谷地區所蘊藏的豐富水能資源開發進入了新的高峰期。
  12. Considering the seepage of linear and the seepage of non - linear in the karst area are always coexisting, the model of linear seepage and non - linear seepage is put forward firstly on the basis of domain decomposition method. the movement of groundwater in an ideal model is simulated with this method, and the program of dar - nondar. for is compiled. then these results are applied to zhongliang water resources and power engineering, the leakage quantity of karst water is calculated

    考慮到巖溶區滲流往往都是線性流與非線性流並存,首次提出了基於區域分解法理論的線性?非線性滲流模型,利用該方法模擬出理想模型中的水流運動,並編制了計算程序dar - nondar . for ,然後將該成果應用於中梁水利水電工程中,預測出庫區巖溶水滲漏量。
  13. This research is one part of a great scientific research project, which is supported by national ministry of water resources and electric power of china, the people ' s government of heilongjiang province and the water conservancy department of heilongjiang province

    在凍害防治技術方面,具有重要的理論價值和現實指導意義。本研究是根據水電部、黑龍江省人民政府、黑龍江省水利廳批準的重大科研項目立題研究的。
  14. Abstract : having conducted investigation into problems related to the macro development of exploitation of pearl river valley ' s water power resources , the authors discuss water power resources of the valley and conditions and level of their exploitation and probe into the strategic deployment for their exploitation in the mid 21 century according to the economic development, electric power planning and also possibilities of regional network construction of related provinces

    文摘:對珠江流域水能資源開發利用宏觀發展有關問題進行了研究,著重論述本流域水能資源及其開發利用條件和開發程度,根據各省(區)經濟發展、電力規劃和區域電網結構建設的可能性,探討21世紀前期,重點是21世紀前20年開發的戰略部署。
  15. By incorporating the power sources location and load prediction results in the energy utilizing proposal, a balance for the power volume needed by 3 counties in the area in three " five - year plans " period is also made, the result of which indicates that, it can meet the power demand required by the social - economic development in the region in next three " five - year plans " if the water power resources are rationally planned and developed and then a comprehensive energy utilizing proposal by combining solar and winding energy together

    並結合區內電源點分佈和負荷預測結果,進行了各縣三個五年計劃期間的電力電量平衡。得到了相應的結論。基於對風能、光能和水能資源開發各自特點的分析,文中進一步對多能互補系統進行了較深入的研究,明確了在阿里地區特定的自然條件下,採用風光互補抽水蓄能開發方式的合理性及可行性。
  16. The first is the influence on flood controlling, the second is the influence on hydro power, the third is the influence on water resources, navigation, and ecological environment downstream of dan jiang kou

    丹江口水庫不加高大壩調水對丹江口樞紐及其下游地區主要有三個方面影響: 1對防洪調度的影響; 2對發電的影響; 3
  17. Firstly, through analyzing massive materials and data, this paper summarizes the main problems of resources and environment confronted with jiangsu province, which are the decrease of per capita amount of land and water resources, the insufficient amount and low self - support rate of mineral and power resources, the low use efficiency and serious waste phenomena, the great emitting quantity of waste water, waste gas and kinds of pollutants, the worrying water quality of surface water and seawater, the bad air condition and the heavy pollution of acid rain

    本文首先通過對大量的資料和數據分析,歸納了江蘇省資源、環境面臨的主要問題:土地、水資源人均佔有量持續遞減,礦產、能源資源總量少、自給率低,且各種資源存在利用效率不高、浪費嚴重等諸多問題;廢水、廢氣及污染物排放量大,地表水、海水水質堪憂,空氣質量差,酸雨污染較重。
  18. Encourage the overseas traders to invest in the basic industries as agriculture, forest, husbandry, fishery and mineral resources ; the infrastructure or social welfare causes such as water, power, highway or other facilities in the city ; to transform the technology of the present - existing enterprises ; to buy the stock share of the traffic or energy facility projects established or being established, and others ; to establish high - tech enterprises producing exported products ; or the development of the estate, tourist resources, etc

    鼓勵對農林牧漁業、礦產資源開發等基礎產業和水、電、路以及市政公用基礎設施、社會公益事業進行投資;對現有工業企業進行技術改造;購買已建或在建的交通、能源設施以及其它建設項目、公用設施的控股權和一定時期的經營權;興辦出口型企業和高新技術企業;從事旅遊資源和房地產開發以及其它方面的合作開發。
  19. As a experimental unit, beijing guodian water resources & electric power engineering co., ltd ( hereafter short for " bwe " ) reformed from beijing hydraulic investigation and design institute. it is primarily engaged in investigation and design of water power stations and hydraulic projects

    北京國電水利電力工程有限公司(以下簡稱北京國電公司)作為行業試點單位,是原國家電力公司北京勘測設計研究院深化體制改革而組建的國有控股公司,主營業務為水利水電工程勘察設計。
  20. At present, ganfa has developed 16 varieties of tubular turbines, ranging from 2 to 25m in water head, 200kw to 16mw in capacity, and 0. 8 to 5. 8m in runner diameter. they offered the best selection for exploitation of low head hydro - power resources in china

    目前我公司貫流式機組適應水頭225m ,容量20016000kw ,轉輪直徑0 . 85 . 8m ,已發展盜近16個品種,為我國低水頭水力資源的開發提供了最佳機型。
分享友人