water slab 中文意思是什麼

water slab 解釋
井式樓蓋
  • water : n 1 水;雨水;露;〈常作 pl 〉 礦泉,溫泉;藥水。2 〈常 pl 〉水體;水域;水道;海;湖;河;海域;...
  • slab : n 1 平板,厚板;(圓木解成板時外面兩塊帶皮的)背板。2 (麵包等的)片,厚塊;鐵塊;土塊。3 混凝土...
  1. They picked up critters from as deep as 6km, and they did so using both typical trawling nets and a special box that was designed to scoop up a slab of ocean floor along with a slice of undisturbed water from immediately above it

    她們用傳統的拖網和一種經過特別設計的盒子在深度達6千米的區域捕撈微生物,這個盒子可以鏟起海底泥土和吸入它正上部未被碰到過的海水。
  2. Filling construction design of uockfill dam with face slab in shuanggou water power station

    雙溝水電站面板堆石壩填築施工設計
  3. A study of water model on slag entrapment of molten steel in mould of slab continuous caster

    板坯連鑄機結晶器鋼液卷渣的水模型研究
  4. In order to resolve the problem from waterproof for underground storage cavern, a comprehensive control measure composed mainly of water drainage with water cutoff and block up as the supplement is followed in the construction, in which the countermeasures such as drain - guiding with piping network, water proof with impervious slab, self - waterproof of concrete structures, jointing waterproof and painting waterproof etc. are adopted, and then a better effect is got in the engineering practice concerned

    摘要為解決好地下洞庫的防水問題,施工中遵循「以排為主,截、堵、排相結合的綜合治理措施」 ,採用了管網引排、防水板防水、混凝土結構自防水、接縫防水、塗料防水等防水作法,經工程實踐取得了良好效果。
  5. The phenomena can be observed in the tests low seepage pressures can easily form passageways behind the waterproof layer if there is no drainage layer or the drainage layer is blocked in the single - shell test slab ; the waterproof layer can resist higher seepage pressure if there is no drainage layer or the drainage layer is blocked in the double - shell test slab ; the seepage water can be controlled and drained away in the drainage layer by the water proof layer only if there is unblocked drainage layer behind it in the double - shell test slab

    由試驗可見,在單層試驗板中沒有排水層或排水層不通暢時,較低的水壓就能在防水膜后形成滲流通路;在雙層試驗板中沒有排水層或排水層不通暢時,防水膜能抵抗一定程度的滲漏水壓;只有在雙層試驗板中的排水層暢通時,防水膜才能有效地將滲漏水控制在排水層中排走。
  6. With the action of the water pressure, the non - homogeneous deformation will emerge at the peripheral joint between the faceplate and the toe slab. under the circumstances of the high steep bank slope, the non - homogeneous deformation can damage the water seal and cause serious leakage

    在高陡岸坡的情況下,面板堆石壩受水壓力的作用,周邊縫處的面板與趾板間要產生一定的不均勻變形,甚至使止水破壞,造成嚴重滲漏。
  7. The water modeling of fluid flow pattern in slab continuous caster mold at hangang

    邯鋼連鑄板坯結晶器內流場的水模擬研究
  8. Research on elastic slab vibration of inverted arch plunge pool under high water head and large discharge

    高水頭大流量作用下反拱水墊塘彈性單底板塊振動規律研究
  9. Testing results are analyzed, then the boundary condition ( the heat transfer coefficient of and the water density ) for computer simulation is acquired. through simulation in computer using the all - purpose computer simulation software secondary cooling in slab continuous casting and test results, the influence of the factor such as casting speed, casting temperature, shell thickness and secondary cooling system are analyzed. the secondary cooling system is evaluated, the reasons of crack are analyzed

    應用模擬軟體和實驗數據對寶鋼1930鑄機進行了模擬計算,分析了拉速、配水制度、過熱度對鑄坯溫度場和坯殼厚度的影響;對寶鋼1930鑄機的二冷制度進行了評估,分析了產生裂紋的原因;並對二冷制度進行優化,提出了改進建議。
  10. As the subducting plate sinks deeper into the earth, it encounters higher and higher temperatures and pressures, which release the significant amount of water trapped in water - rich minerals that exist within the slab

    當板塊越向地心隱沒,溫度和壓力便會越高,這些條件會促使大量的水從板塊中含水豐富的礦物里釋放出來,而在這股液體從板塊向上竄升之際,便會發生無聲地震。
  11. On basis of the experiment of a pk prestressed composite floor slab under static water, its working performances are studied and analyzed

    通過pk預應力雙向疊合樓蓋的靜水加載試驗,本文對這種雙向疊合樓蓋彈性階段的受力性能進行了研究。
  12. By adopting the three - dimensional nonlinear finite element program, using drucker e - b model, demonstrating the actual construction progress and water impounding of gongboxia hpp main dam, comparing the two schemes of the existence and nonexistence of extruded concrete curb, made three - dimension simulation calculation, the result proved that while the existence of extruded concrete curb between face slab and rockfill, the deformation and stress of face slab are better than that while the nonexistence of extruded concrete curb

    採用三維非線性有限元計算程序,使用鄧肯e b模型,模擬公伯峽面板壩的實際施工進度、蓄水過程,對比有無擠壓邊墻兩種方案,進行三維模擬計算。結果表明,面板與堆石體之間有擠壓邊墻時,其面板的變形及應力值均小於無擠壓邊墻的相應結果。
  13. Whether the hd will inspect the rooftops of all slab blocks in the territory to ascertain if the waterproofing measures in place are effective, and carry out remedial works on the rooftops of those blocks which have a similar water leakage problem

    房屋署會否全面檢查所有同類型公屋大廈天臺的防水措施是否有效,並在那些有相同滲水問題的公屋大廈天臺進行防水工程
  14. ( 6 ) the validity of control methods of crack has been verified by using engineering instances. on the basis of the researches mentioned above, some crucial conclusions are acquired as follows : ( 1 ) during construction, the cracks in beams and girders were caused by the drop of temperature and by the difference in the inside and outside temperature. the crack in slab was caused by shrinkage due to the loss of water

    通過上述研究工作得出了一些重要的成果: ( 1 )在施工階段,大面積現澆樓蓋結構主次梁的裂縫由溫度降幅和內外溫差引起,板的裂縫主要由失水收縮引起; ( 2 )在施工期,由水化熱引起的應力主要分佈在主次梁中,板中應力較小。
  15. Water model study for optimizing the operating parameters of slab continuous casting mold at chengde steel

    承鋼板坯連鑄機結晶器工藝參數優化的水模型研究
分享友人