water supply plan 中文意思是什麼

water supply plan 解釋
給水計劃
  • water : n 1 水;雨水;露;〈常作 pl 〉 礦泉,溫泉;藥水。2 〈常 pl 〉水體;水域;水道;海;湖;河;海域;...
  • supply : vt ( plied) 供給;供應;配給;補充,填補,彌補(不足、損失等)。 Cows supply us (with) milk ...
  • plan : n 1 計劃,設計,方案,規劃;方法;進程表;時間表。2 圖,圖面;平面圖,設計圖;示意圖;圖表;(街...
  1. Space - time alterable characteristic between economic growth and land, water, energy resources is studied ; land carrying capacity, water carrying capacity, the supply and demand of energy is forecasted, in order to provide reference and gist for correlative bureau to constitute economic and environmental plan

    從時間和空間角度分別論述了山東經濟增長與土地資源、水資源和能源資源的變動特點和規律,並在此基礎上預測了土地承載力、水資源承載力和能源供需水平,以便為相關部門制定規劃提供一定的參考和依據。
  2. Its feasible report, initial design, land and plan proceedings together with water and land conservation program, water supply, hydrogeology argumentation, appraisal on environmental influence etc. have been got through

    已完成可研、初步設計、土地及規劃手續、水土保持方案、供水水文地質可行論證,建設項目環境影響評估等。
  3. We plan to divide water supply jurisdictions into 500 blocks, and each block will be installed with wireless real - time meter readers. we will establish electronic leakage management systems for collecting revenue supply data, to accurately and rapidly monitor improvement operations to promote effects of leakage management

    規劃將供水轄區分為500個小區,配合無線即時讀表儀器,建立e化漏水管理系統,隨時?集售水率資料,準確迅速掌控改善作業,提升漏水管理成效。
  4. Seismic survey is a new method used to civil engineering area in recent years. it was widely applied to survey or detecting of roadbase, dam base, foundation of building, tunnel, river bed, lake bed and etc. the chief methods are reflection method, refraction method, wave velocity testing, surface ware survey and transverse wave suivey. seismic survey can divide different layer, measure the incidence of sediment stratum, detect the structure of rock, test the handle effect of surface wave survey, we can calculate the carrying capacity of foundation and other mechanical parameters. this technique can give service to some big engineering departments such as highway developing company, survey design company, water supply company, plan bureau, construct bureau etc

    應用於工程的主要方法有反射波法折射波法波速測井面波法及橫波勘探等。地震勘探能詳細劃分地層高精度地確定沉積地層的傾角能夠準確探明巖體構造褶皺斷層破碎帶裂隙帶對于回填工程路基壩基,地震勘探可以檢測其回填處理效果對于隧道工程,可以探測隧道洞體的圍巖分類及洞口地質情況利用面波勘探所得到的瑞利波速度,可以準確推算地基的承載力動彈模量等力學參數。
  5. In addition to a systematic plan that governs water sampling at 1, 650 sample points in the water supply district, advanced equipment and professional technologies are also adopted for as many as 86 items of water quality examinations

    除了有系統的訂定計畫,對供水區1 , 650個代表點進行采樣,同時運用先進的設備與專業的技術,進行高達86個項目的水質檢驗。
  6. Since high purified water for blood dialysis is obtained by reverse osmosis film separation, the quality of reverse osmosis unit is critical for water quality index, which should meet aami water supply standard, thus entailing a proper plan for the whole system

    血液透析用反透水處理系統採用反透膜法分離技術制取高品質純凈水,反滲透裝置的質量可靠性是關系產水指標能否達到美國aami用水標準的關鍵,合理的設計方案是必要的前提條件。
  7. The forecast study about the rising water demand. though the study about the history, current situation and further, combined with the plan and trend of social economy, studied the characteristics of the rising demand of water supply

    通過對西安市城市供水的歷史、現狀和未來發展的分析,研究城市用水需求增長變化的特點,並結合城市的社會經濟發展規劃及趨勢,對未來用水需求進行預測並進行供需平衡分析研究。
  8. Investigation and evaluation on groundwater resources. demonstration in water search and supply. demonstration of engineering and environmental geology. investigation and evaluation of geological disasters and design of control plan

    地下水資源調查評價、找水供水論證、工程地質、環境地質評價論證、地質災害調查評價及防治規劃設計。
  9. On the premise of the study about the developing of xi ' an city ' s water supply and the great variety in water supply and the shortage of water resource, aiming for the furthest benefit from the configuration of water supply source of xi ' an city and facilitating it ' s development, this paper analyzed the characteristics of water supply sources and its changing quantity, the rising demand of water in city and the situation about water supply source, studied the problem about water supply via a variety sources, raised the principles of optimized configuration of variety sources, built the model of water demand forecasting and optimized configuration, studied the configured plan and its managing pattern

    本論文從研究西安市城市供水的發展過程入手,重點分析了城市供水水水源和城市用水需求增長的變化特點,在城市供水狀況相當長的時期內將表現為供大於求的重大變化和西安市資源性缺水的現實沒有改變的背景下,以實現最大限度地發揮城市供水系統的作用合理配置緘市供水水源,促進西安社會經濟的持續、快速、健康發展的總體目標,研究了運用多水源科學合理的供水問題。分析了西安市城市供水水源狀況、用水量變化特點以及各水平年需水量,提出了多水源優化調配的原則,建立了需水預測模型與優化調配模型,初步研究了西安市城市供水水源合理配置方案和相應的管理模式。
  10. The overall plan for xiaolangdi project management zone is carried out to ensure the safe operation of hydraulic constructions in the zone, to make full use the advantages of location and resources of the area, and to realize the general objective of “ mainly aim at flood prevention including ice flood prevention and sedimentation reduction, and give consideration to water supply, irrigation, power generation, storage of clear water and discharge of sediment flow, alleviating disaster and bringing about benefit, and comprehensive utilization ", for the project development

    為確保小浪底水利樞紐工程管理區內水工建築物的安全運行,充分發掘管理區的區位優勢和資源優勢,實現「防洪(包括防凌) 、減淤為主,兼顧供水、灌溉、發電、蓄清排渾、除害興利、綜合利用」的工程開發總目標,對工程管理區進行了總體規劃。
  11. Baishi reservoir, one of the major water resources development project in the nineth five - year plan, is a large scale multipurpose water conservancy project with the main purposeof flood control, irrigation and municipal water supply, and the reservoir can also give consideration to power generation and fish breeding

    白石水庫是遼寧省「九五」期間水資源建設的重點工程,是一座以防洪、灌溉、城市供水為主,兼顧發電、養魚等綜合利用的大型水庫樞紐工程。
  12. If our supply of food and water holds out, we plan to camp here for another week. however, whenever it gives out, we ' ll have to leave

    如果食物跟水可持續供給,我們打算在這在露營一周。無論如何,只要糧食一吃光,我們就得離開了。
  13. ( 2 ) studied and ensured the configuration and plan of city water supply

    ( 3 )研究確定城市供水水源合理配置方案和模型。
  14. This article briefly formulates the development method of information system and focuses on the introduction of bsp ( business system plan ). by directed against the management features of the water supply corporation, this article systematically the target, boundary and requirement of management information system of the water supply corporation, performs process - data identification, defines the data

    論文首先介紹了供水公司的企業特點和存在問題,並對其原因進行了分析,然後介紹了企業的發展戰略以及mis的規劃目標,簡述了信息系統的開發方法,重點介紹了企業系統規劃法。
  15. Aiming at the functional shortcomings existed currently in widespread use of intelligence drinking water machine with ic card, which cannot identify the expiration of water quality and cannot adjust water price according to the speed of drinking water supplying, etc., this paper puts forward the improved plan which establishes the monitoring devices for fluid volume and speed of water supplying and adds the modules for the unit price adjustment of water supply and the device for limiting water supply, and also adds the usb interface electric circuit, satisfying the communication and function expansion

    摘要針對目前普遍使用的帶有ic卡的智能收費飲水機存在的無法判別水質過期和不能根據飲用水機供水速度而自動調節供水單價等功能缺陷,提出了改進方案,設置了供水流量和速度檢測裝置,增加了供水單價調節模塊和限制供水機構,也增加了usb介面電路,滿足通信和擴展功能。
  16. This research stress on both of water - saving irrigation technique and engineering reform plan in the irrigation, investigates current situation and main existing problem including geography, geology, social economic condition and so on. . the necessity and feasibility of water - saving engineering reform are proved through balance analysis of water supply and demand relation in the area, then the construction scale and water - saving technique of reform is presented

    本文研究主要從灌區節水灌溉技術和工程改造方案兩方面入手,調查研究灌區現狀及存在的主要問題、灌區的自然地理、地質、社會經濟等基本情況,通過灌區的水資源供需平衡分析,論證了灌區實施節水改造的必要性和可行性。
  17. According to the supply system composed by parallel connection water pump, many kinds of operation proposals in a single pump were put forward to provide the greatest possible flow on both sides of the demarcation point in the scope of the flux changes ; identified the system of pumps, electromotor, speed governor imitate method of characteristics curve of the power device and its rotating speed, efficiency, energy consumption calculation under different condition ; the analytical methods used for the operational plan for comprehensive evaluation of the economic and safety and optimal results

    摘要針對由並聯水泵組成的供水系統,提出了在以單泵可能提供最大流量為分界點的兩側流量變化范圍內具有多種運行方案;確定了在不同工況下,該系統中水泵、電機、調速器特性曲線的擬合方法及其各動力裝置中轉速、效率、能耗的計算式;採用解析的方法對各種運行方案進行了經濟性和安全性綜合評價,並給出最優結果。
  18. Then a tentative plan came to our brains, is it possible for us to assure guard cells to open when water supply is enough, and close rapidly when plants come across drought stress by regulating expressional pattern of genes

    我們的設想是:當水分供應充足時,氣孔盡最大限度開放,吸收co _ 2 ,增加光合產量;當乾旱來臨時,氣孔迅速關閉,減少水分喪失,提高作物的水分高效利用率。
  19. In the second parts the author establishes a mathematical model which attempts to achieve lowest power consumption consistent with providing a satisfactory service to customers and applies genetic algorithms to find out the optimum answer. in third parts the author applies multistage plan, for renewal of equipment of water supply systems, it provides reliably theoretical foundation for the goal of ben - gang water supply system

    對于確定最優調度問題,以耗電量最小為目標函數,以滿足用戶對水量、水壓要求以及供水能力為約束條件,建立供水系統微觀數學模型,利用遺傳演算法進行求解,並編制了計算機程序,求得了最優調度方案。
  20. As potential sites were scarce and rainfall and other sources of water were erratic, the government was so desperate that on 14 october 1859, it promised a payment of 1, 000 pounds to anyone who could come up with a proposal to develop hong kong s fresh water supply. it also set aside 25, 000 pounds to cover the expenses of hong kong s primary water supply plan

    香港的天然水源匱乏,可開發的土地又有限,在苦無良策的情況下,政府在1859年10月14日毅然懸賞一千英鎊,徵求開發水源的方案,並準備撥款25 , 000英鎊作為香港第一個大規模水務計劃的經費。
分享友人