work done factor 中文意思是什麼

work done factor 解釋
耗功系數
  • work : n 1 工作,操作,勞動,作業;工件;功課;努力;行為,作用。2 (待辦的)事務,業務;職業。3 〈前有...
  • done : adj 1 已完成的,完畢了的。2 疲倦極了的,精疲力盡的。3 燒熟了的〈通例用作復合詞〉。4 受了騙的;吃...
  • factor : n 1 〈英國〉經銷人;(代客買賣收取傭金的)經紀人;代理商;代辦人;〈蘇格蘭語〉 土地經管人。2 要素...
  1. The author has done much research work in examining the functions of raw materials, as well as making graph analysis of the raw material. as a result, achievement have been made : ( 1 ) making sure of the standard factor and t he best mixture proportion, ( 2 ) finding out the best way of measuring the index of the high performance concrete, ( 3 ) the endurance of this high performance concrete and the volume stability have been experimented ; ( 4 ) the great economic and social benifit are obtained by cost analysis

    其主要工作進行了各種原材料的性能檢驗並做出相應圖表分析;對摻超細礦渣粉末的高性能混凝土進行正交試驗,確定了主要水平因子和最佳配合比;通過對高性能混凝土的耐久性試驗及高性能混凝土的體積穩定性試驗,確定檢測高性能混凝土耐久性指標的最佳方法及高性能混凝土的熱脹冷縮率和體積穩定性;通過對高性能混凝土的成本分析,確定摻超細礦渣粉的高性能混凝土其經濟效益和社會效益非常顯著。
  2. Firstly, the theory summarize of r & d project evaluation and performance measurement are done, the limitation and shortage of traditional evaluation and measurement is pointed out ; afterward, the purpose and content, the methodologies and classify, the basic principle and work procedure, the reporting and organizing are dissertated ; and then, the influence factor and the main parameter of the r & d project performance measurement are analyzed, the index of performance measurement are discussed emphatically, based on this, a dynamic and effective r & d project performance measurement system is developed, it comprises designing, implementing and updating performance measurement systems ; at last, the development current of r & d project evaluation and performance measurement is discussed and the conclusion of this paper is made

    首先,本文對r & d項目評估和績效測度進行了理論綜述,指出了傳統評估與測度的缺陷與不足;然後,論述了r & d項目評估的目的和內容、方法和分類、基本原則和工作程序、組織與報告工作;其次,分析了r & d項目績效測度的權變因素和主要參數,重點探討了測度指標,並在此基礎上開發了一個動態有效的r & d項目績效測度系統,包括對r & d項目績效測度系統的設計、實施和更新;最後,探討了r & d項目評估與績效測度的發展趨勢並得出了本文的結論。
  3. In order to make the studying about the seismic exploration method possess systematic nature and the ability of tackling key problem in front - zone of mountain, we have done the research work of tackling key problem aiming at the field gathering technology of seismic exploration of the complicated structure belt ( the construction of underground and the earth ' s surface condition are complicated ) of front - zone of mountain in this text, and a large number of relativity trials by the close combination of production and scientific research, summarized a set of field method of the complicated structure belt of front - zone of mountain, adjusted both of trial factor and construction factor of the field gathering in time, achieved finally the goal of making its structure character clear

    近幾年來,隨著地震勘探裝備和技術的改進,野外資料採集技術有了新的進展,主要表現為多種震源聯合激發方法(井炮和大噸位可控震源) ,基於地表條件及表層調查基礎上的激發選點方法,小道距、長排列、高覆蓋接收方法,基於模型的「分段、分線、分區」觀測系統目標設計方法等,取得了顯著的勘探效果。為了使山前地震勘探方法研究具有系統性和攻關性,通過本文對復雜山前復雜構造帶地震勘探的野外採集技術進行攻關研究,進行了大量具有針對性的試驗,總結出了一套山前復雜構造帶野外施工方法,最終達到了搞清復雜山前復雜構造帶山前復雜構造帶構造特徵的目的。
  4. These studies in the thesis have been done as follows : it is proved that if the three - phase single - switch boost type power - factor - correction can work in continuous - current - mode, its power factor can not reach unity. therefore, it is not qualified for high power and high requirement application. according to the ac side equivalent circuit of the three - phase three - switch boost type power - factor - correction, the equations to realize unity power factor have been deduced and realized by integrate - reset - control circuit

    本論文把積分復位控製成功應用於三相功率因數校正技術中,作了以下幾方面的研究: 1 .從理論上證明了三相單開關boost型pfc即使工作在ccm ,其功率因數也不能達到1 ,在大功率和對功率因數校正能力要求較高的場合,三相單開關boost型pfc達不到要求, 2 .根據三相三開關boost型功率因數校正交流側的等效電路,推導出實現單位功率因數所需的控制方程,並用積分復位控制電路進行實現,在理論研究的基礎上進行了模擬研究。
分享友人