work on the land 中文意思是什麼

work on the land 解釋
以務農為業
  • work : n 1 工作,操作,勞動,作業;工件;功課;努力;行為,作用。2 (待辦的)事務,業務;職業。3 〈前有...
  • on : adv 1 〈接觸、覆蓋〉上去;開(opp off)。 turn on the light [radio water gas] 開電燈[收音機、自來...
  • the : 〈代表用法〉…那樣的東西,…那種東西。1 〈用單數普通名詞代表它的一類時(所謂代表的單數)〉 (a) 〈...
  • land : n 1 陸地,地面。2 土地,田地;農田;〈pl 〉所有地,地產。3 國土,國,國家;領土;地方;(…的)世...
  1. The construction of land use status information system improves the accuracy and the trends of times of land use information, it automatically stores, manages, researches, inquires, counts, analyzes, renews and defends land use status graph which is digital, solves the problem of the renewal of land use status graph and data. it provides not only modern technology means for everyday professional work in county level land management department, but also basic data and scientific basis for land use renewable investigation, dynamic monitoring, land use totality planning. on the other hand, it lays a foundation for the establishment of cropland transform system, land exploitation and readjustment, approvable management system of construction project used land, management system of rural land register

    土地利用現狀信息系統的建設,提高了土地利用現狀信息的準確性和現勢性,實現了對土地利用現狀圖件的存儲、管理、檢索、查詢、統計、分析、變更、維護的數字化和自動化,從根本上解決了土地利用現狀圖及數據的更新問題,不僅為縣級土地管理部門的日常業務工作提供了現代化的技術手段,而且為土地利用變更調查、動態監測、土地利用總體規劃提供了基礎數據和科學依據,為農地轉用制度、土地開發整理、建設項目用地審批管理制度及農村地籍管理制度的建立莫定了現代化基礎,同時也可為土地利用動態監測、土地利用規劃、建設用地的審批和管理提供技術服務。
  2. This work carries out a temporal - spatial analysis and comparison in facial pattern, grain - size, and susceptibility of the sediments of the hunshandake sandy land ( hsl ) on the basis of studies of more than fifty geological sections, a number of samples collected from surface sands as well as results derived from previous studies. the preliminary results of this work provide new environmental information of the working area, which makes it possible to have a brief discussion about the evolution of the hsl since the late glacial epoch. this work can be summarized as the followings

    晚冰期,渾善達克沙地全面擴張,達到了沙漠化最大規模,剖面中的古風成砂是最直接的證據,此時氣候乾冷;全新世早中期,渾善達克沙地成壤比較好,是一個大面積成壤期,相當于全新世適宜期,此時氣候暖濕;全新世晚期,渾善達克沙地沙漠化正過程加強,在沙地各剖面上普遍發育風沙沉積,氣溫較乾冷;目前:渾善達克沙地為另一成壤期,成壤作用相對于適宜期較差,氣候乾暖。
  3. Zhuzhou hydropower junction project is a large - scale project with great capital invested, and the project would impropriate the land and work on the neighborhood environment. especially when the project develops up to a certain degree, the influence would be profound. therefore, the construction and operation of zhuzhou hydropower junction project should be on the basement of sustainable development in order to meet the need of the development of economy, environment and social service

    株洲航電樞紐工程是一個規模大、耗資多、影響面廣的大型工程,它以永久性佔用土地、影響環境為代價,特別是內河航道發展到一定程度后,這種影響將更為廣泛,因此,株洲航電樞紐工程的建設與運營應謀求其可持續發展,以滿足工程移民區域及移民安置影響地區目前及將來經濟、環境、社會發展的需求。
  4. Mister pollack did not want to work on a ship. he was a farmer and loved the land.

    波來克先生可不願意到船上去工作,他是個農夫,酷愛田地。
  5. First she inquired for the lighter kinds of employment, and, as acceptance in any variety of these grew hopeless, applied next for the less light, till, beginning with the dairy and poultry tendance that she liked best, she ended with the heavy and coarse pursuits which she liked least - work on arable land : work of such roughness, indeed, as she would never have deliberately volunteered for

    她起初是尋找一些比較輕松的工作,看到找這類工作漸漸沒有希望,就轉而找比較繁重的工作,她就這樣從她最喜歡的奶牛場和養禽場的活兒問起,一直問到她最不喜歡的粗重的工作農田上的工作:這種工作的確又粗又累,除非是迫不得已她是不會自願乾的。
  6. Only see that one slice grow green and fresh on the uneven hills, like the land of rivers and lakes of the south of china. on the in picturesque disorder paddy field, varicoloured flag insert full low banks, much peoples arrange and succeed and rank paddy field transplant rice seedlings, its lively work scene can t help making people remember great leap forward of china in 1958

    只見起伏不平的丘陵上一片鬱郁蔥蔥,好似中國的江南水鄉。錯落有致的水田裡,五顏六色的旗幟插滿了田埂,不少人排成一排在水田裡插秧,其熱鬧的勞動場面不禁使人想起了1958年中國的大躍進。
  7. The yeoman could never own and work on their land after the movement

    那場運動后,自耕農再也不能擁有並在他們自己的土地上耕耘了。
  8. It explorers a webgis - based process for land - use planning information publications and discuss on the model design land - use planning information web publication by establishing an example web site based on the materials of land - use planning of ruian, a city in the south of zhejiang province. it also discusses the implemental techniques used to tie the web server directly to an existing gis and to add gis functionality to the web, such as cgi ( common gateway interface ), java, server api, asp ( active server pages ). through comparation the work discusses which techniques and tools are more suitable for practical use

    基於webgis的土地利用規劃信息發布與管理系統實例開發與實現在理論分析的基礎上,本研究利用maplnfo地理信息系統軟體以及autodeskmapguide網路地理信息系統平臺,以asp 、 vbscript 、 javascnpt作為動態網頁開發工具,結合浙江省瑞安市土地利用總體規劃( 1997 2010年)的技術成果資料,設計並實現了以測覽器用b務器為體系結構的基於webgis土地利用規劃網上信息發布與管理的實例應用,為探索利用webgis進行土地利用規劃信息發布應用的技術可行性與應用前景提供了應用參考。
  9. Referring to the achievements of conservation tillage on dry land farming, there is a series of work to be done to develop new tillage techniques to adapt to double cropping system of wheat and maize in shandong province. such work includes controlling the combine traveling along the line, return the stalk to the field after chopped, subsoiling being done in maize ' s growing stage. the advantage of subsoiling is to make the soil inter placed with soft and hard strips, which is good for decreasing runoff and vaporizing, and retaining rain

    1 、保護性耕作條件下,普通小麥條播機的播種質量較差,小麥的田間出苗率比傳統耕作低9 . 3 ;保護性耕作小麥冬前地上部分的生長狀況也較傳統耕作小麥差;由於根系的生長條件較為優越,保護性耕作的小麥的根系生長旺盛、分佈廣,越冬後有利於小麥的地上部分生長,大量發生春季分蘗和次生根,幼穗強烈分化,表現出較傳統耕作小麥強的生長優勢,產量提高6左右。
  10. To improve it infrastructure services, a comprehensive set of office automation services was delivered in 1997. they include electronic mail among the hkma, the hkmc, the land fund office, hkmas new york office and quarry bay office ; sending and receiving fax on individual pcs ; internet connectivity through the electronic mail network ; and administrative work automation, suchas annual budgeting and annual staff appraisal

    為了改進資訊科技基礎設施服務,一九九七年推出了一套全面的辦公室自動化服務設施,包括金融管理局香港按揭證券公司土地基金辦事處以及金融管理局紐約辦事處和魚涌辦事處之間的電子郵件系統在每位職員的個人電腦上收發傳真透過電子郵件網路接駁網際網路以及將每年的開支預算和年度職員工作表現評估等行政工作自動化。
  11. Work started on 14 january 1935 and was completed on 22 march the same year, in all just 56 working days. the work to connect the submarine pipeline with the land mains on the island and in kowloon, was completed on 9 april

    工程於1935年1月14日展開,同年3月22日完成,共需56個工作天,連接九港兩地海底沉管與地面水管工程,則於4月9日完成。
  12. On 17 february 1930, after 57 days of work, engineers succeeded in connecting kowloon and hong kong island with a cross - harbour submarine pipeline. by 23 february, the connection works between the submarine pipeline and the land mains, on both sides of the harbour, were also complete

    連接港九的輸水管直徑12寸,於1930年2月17日完成,由第一次將水管放入海底起計,共用了57個工作天,而連接沉管與陸地水管的工程亦在2月23日完工。
  13. The implementation land use control request land administration department responsible for the work to the present situation land use, the land utilization overall plan definite land parcel use, as well as the use change carries on the investigation, the verification, the confirmation, the surveillance

    實施土地用途管制要求土地行政主管部門對現狀土地用途、土地利用總體規劃確定的地塊用途,以及用途變更進行調查、審核、確認、監督。
  14. Gu got to work on the great mercy mantra of guanyin bodhisattva and the pure land mantra of amitabha

    然後顧書志就開始念誦觀音菩薩的大悲咒和阿彌陀佛的凈土咒。
  15. Whereas the mortgaged house, as the subject - matter of insurance, is exposed to risk separately with its different parts. some risks work on the land, others do on its appurtnant buildings, which influences the insurable intrest

    但是抵押房屋作為保險標的,各種風險因素發生作用的對象常常是分割的,有的風險作用於地上建築物,有的風險作用於土地,這就影響了可保利益的指向。
  16. Jeff nankivell, counselors and head of the development section under the canadian embassy in china told china daily that all the aids will be rendered through projects which address poverty through work on the chinese government s poverty - reduction program, skills training systems, land - use management systems and good governance

    加拿大駐華使館參贊兼使館發展處負責人傑夫.南基威爾jeff nankivell對中國日報說,所有的援助都將通過中國政府解決貧困問題的扶貧計劃技能培訓計劃土地使用管理計劃和良治等項目來實施。
  17. The railway development section continued its work on railway land issues, and the major clearance work for the west rail ( phase i ) has been completed

    鐵路發展組繼續處理與鐵路有關的土地工作。西鐵(第一期)的大型清理土地工作已經完成。收到的逾
  18. The heavy occupation of land resource and the bad effects on the land quality produced in the highway construction have caused greater pressure on the land and tilled land resource and it is an urgent matter, which we have to face, to work out a solution to settle the problem of highway development and occupation of land into a compatible developmental course

    但是,公路建設對土地和耕地資源的大量佔用、造成的水土流失對土地和耕地資源的危害已經給我國耕地和土地資源帶來了較為嚴重的壓力。如何使公路建設與土地資源佔用這一既矛盾又統一的問題協調到合理解決的軌道,是人們不得不面對的緊迫問題,然而這一涉及資源、環境、發展的協調問題,至今尚未引起人們的高度重視。
  19. They work on the land

    他們是種田的。
  20. In 1968, went to the countryside to work on the land and later became a soldier. graduated from the north - east normal univ. majoring in political education

    1968年下鄉當農民,后來當過兵。畢業于東北師范大學政治教育專業。
分享友人