work pile 中文意思是什麼

work pile 解釋
定位樁
  • work : n 1 工作,操作,勞動,作業;工件;功課;努力;行為,作用。2 (待辦的)事務,業務;職業。3 〈前有...
  • pile : n 1 軟毛,絨毛;毛茸。2 (布、絨的)軟面。vt 使起絨。adj d 有絨毛的。n 痔瘡;〈pl 〉痔。 blind pi...
  1. It can be said that the solution to the space problem of limit load and the calculation of foundation bearing capacity for deformed groundwork have some academic and scientific value. the dynamic pile testing of foundation and batholith as well as deep well load testing system has been put into use in real work environment and gained some social and economic benefit

    本文關于界限荷載的空間問題解答,考慮地基變形的地基承載力工程演算法具有一定的學術價值;本文中的地基(及巖基)承載力動測法及深井載荷試驗系統已在工程實踐中應用,並取得了較好的社會和經濟效益,具有一定的工程實用意義。
  2. In view of bearing capacity of the elastoplastic theory analysis, the author made a comparison between the achieved bearing capacity limit load pi / 4 of round base ( space problem ) and the limit load pi / 4 of bar groundwork foundation design ( plane problem ) from soil mechanics at home and abroad as well as foundation criterion, and explained why the value of formula in present design criterion from soil mechanics is inclined to be conservative. in the light of the author ' s many years experience of vibration test on the spot and the research work of relevant projects, the author worked over the dynamic pile testing of the bearing capacity of foundation and batholith, and gathered the parameter of dynamic analysis and testing. the author also talked over the difficult point of pile foundation design criteria in present batholith engineering world, i. e. the confirmation of batholith bearing capacity of pile end, from the following aspects : a ) confirmation of single axis counter - pressure strength of rock in house ; b ) f. e. m calculation of elastoplastic model ; c ) calculation of soil mechanics ; d ) deep well load test

    然後,對巖土工程領域至今尚未解決,甚至不為人注意的考慮地基變形的地基承載力問題進行了實用化的探討,提出了考慮地基變形的地基承載力上程計算方法;對基於彈塑性理論分析的地基承載力國內尚未見報道的空間問題得到了圓形基礎(空間問題)的承載力界限荷載p _ ( 1 / 4 ) ,並與國內外土力學專著及地基基礎設計規范中的條形基礎(平面問題)的界限荷載p _ ( 1 / 4 ) ,進行了對比,從而定量上解釋了目前設計規范引用土力學承載力公式值偏於保守的這一情況;根據本文作者多年從事現場地基工程振動試驗及相關課題的研究工作,本文以截頭錐模型模擬地基,對地基(巖基)承載力的動測法進行了研究,為各類地基(包括巖基) ,匯總了動力分析和檢測川的參數:針對日前巖土工程界應用樁基設計規范中的難點? ?樁端巖基承載力的確定問題,從巖石室內單軸抗壓強度確定、基於彈塑性模型的有限單元法計算、土力學計算及深斤載荷試驗四方面進行了深入討論;本文作者根據多年現場載荷試驗的工程實踐,對深井荷試驗裝置的核心部分? ?反力裝置,設計了側壁支撐反力加載系統,該加載系統具有實用、簡便、穩定及安個等優點。
  3. In the process of work, according to complex geological conditions such as huge thick soft clay in site and top surface of possible pile foundation supporting course fluctuating in large amplitude, we adopted many advanced exploratory methods ( just as high accuracy exploration of shallow earthquake, crosshole wave velocity test, vane shear test, pressuremeter test, etc. ), we found out that there is an ancient groove of yangzi river in former plant site, therefore we suggested in time that plant site should properly be moved eastwardly, only this item saved nearly about 50 million for pile foundation project cost

    在工作過程,根據廠址區軟粘土厚度大、可能作為樁基持力層頂面起伏變化大等復雜地質條件,採取了多種先進的勘探手段(如高精度淺層地震勘探、跨孔波速試驗、十字板剪切試驗、旁壓試驗等) ,查明了原廠址區存在一個長江古凹槽,並及時建議廠址適當東移,僅次一項就節省樁基工程費用近5000萬元。
  4. Abstract : with the composite process of root - pile and infilling consolidation by cement injection with foraminate - steel - tube ; good effect has been made in the treat of sideslip of one fly - over bridge. the work machanism and technology of cement injection with foraminate - steel - tube are discussed in following article

    文摘:用樹根樁及帶眼鋼管充填壓密灌漿工藝復合處理某立交橋側移的實踐取得很好實效;對帶眼鋼管灌漿的工藝與機理作了討論,認為其具有廣闊的應用前景。
  5. If there is no over burden at the river bed, the steel pipe pile cannot be inserted, the floating platform will be adopted, during overwater construction, the author ( using zhong - 60 floating box, etc. ) assembled 40t floating crane by his own design, in this way, the floating crane completed the work of overwater transporting and lifting, such as the transporting of s teel pipe pile, inserting, the erecting of overwater construction platform, overwater moving of drill grid crane, lifting of lifting box of cushion cap, pulling out of steel pipe pile

    在水上作業中,作者利用中- 60浮箱等設備自行設計、拼制了40t浮吊,完成了水上運輸、水上起重等作業,如鋼管樁的運輸、插打、水上施工平臺的搭設、鉆機吊車的水上轉移、承臺吊箱的起吊、鋼管樁的拔除等作業。
  6. On the basis of predecessor work, the thesis developed fem program of the pile under lateral load, which is based on winker ground model, and m method is introduced into fem program. the calculation values is closed to the results of field and laboratory model experiment, the finite elment method is verified

    在前人所做工作的基礎上編制了基於文克爾地基模型的有限元計算程序,將水平承載樁的「 m法」引入計算程序中,並用現場試驗資料和本文的模型試驗結果與數值計算結果進行了對比,結果表明較為吻合,驗證了程序分析pcc樁水平承載的正確性和可靠性。
  7. She groaned inwardly as she saw the fresh pile of work on her desk.

    她看到自己辦公桌上又是一堆要處理的東西就暗自叫苦。
  8. She groaned inwardly as she saw the fresh pile of work on her desk

    她看到自己辦公桌上又是一堆要處理的東西就暗自叫苦
  9. The main original work is as the followings : 1. longitudinal vibration of an integral pile in an uniform soil with end bearing boundary or elastic bottom boundary undergoing vertical harmonic load is theoretically investigated

    主要工作如下: 1 、分別對均質土中完整端承樁和彈性支承樁在垂直諧和激振力作用下的縱向振動特性進行了研究。
  10. The results of research work show that the values of sand rate, aggregate grading, paste content and mineral admixtures control the degree of tightness pile up and the workability of fresh concrete, furthermore, they determined the mechanics performance and the durability of self - compacting concrete

    研究表明,砂率、集料級配、水泥漿量、礦物摻合料等因素的取值決定了免振搗混凝土的緊密堆積程度及新拌混凝土的工作性能,從而進一步決定了免振搗混凝土的物理力學性能及耐久性能。
  11. In combination with the work of < the design and technical construction rules of flexible dolphin pier in port engineering > of designing institute of water transport of transport, the data of some typical experiments of domestic and international pile foundation were analysed emphatically. through comparion of the relation of p - y curves between single pile and pile group under lateral loading and lateral reciprocating loading, the experience formula of p - y curve of single pile under reciprocating loading role is put forward

    本文結合中交水運規劃設計院《港口工程柔性靠船墩設計與施工技術規程》的編制工作,著重分析了國內外幾組典型的試樁資料,通過對比水平靜載單樁、群樁和往復荷載單樁p ? y曲線的關系,提出了往復荷載作用下的單樁p ? y曲線的經驗公式。
  12. General view - shallow water region pile cap work - cofferdam construction

    淺水區的樁帽建造-圍堰建造中
  13. As soon as we reckoned everybody was asleep that night we went down the lightning - rod, and shut ourselves up in the lean - to, and got out our pile of fox - fire, and went to work

    那天晚上,估計大家都熟睡了,我們便順著避雷針滑了下來,躲進那個披間,把那一堆爛木頭狐火取出來,就動手幹了起來。
  14. A pile of practical issues get in the way of directly applying the theory. remember, stealing someone else s work whenever possible makes buffer overflow exploits much easier

    另一個極端是基於硬體的隨機數發生器,它可以執行非常好的性能,但通常由於其昂貴的價格或缺少普遍可用性而不實用。
  15. According to the documentation collected from domestic and abroad wang wei dong who works in huadong architect and structure institute utilizes the similar work property between the underground continuous wall and pile subjected the vertical loads, and introduces poulos method of elasticity and plastic which applies to pile foundation into the calculation for subsidence of underground continuous wall. pujialiu and yu yuzhou from water and electronic engineering of qinghua university, according to the result of three axes, define the concrete parameter utilize the model of non - linear e - b combined with the design cross section of dam in xiaolangdi, yellow river accept the total stress programme of thepd dam, and we analyze the stress and displacement of plastic concrete diaphragm wall by finite element method in comparison with the result of common concrete one. at same time, we consider the effect of the character of plastic concrete diaphragm wall which is composed of different gradients and adopting the level of stress and pulling stress infers whether the plastic concrete diaphragm wall is safe or not

    地下連續墻是一種歷史較短的施工方法,目前,砼防滲墻的設計還是以傳統的設計方法為主,根據查找國內外文獻資料,華東建築設計院王衛東利用地下連續墻與樁在豎向荷載作用下的工作性能有相似性,將適用於樁基的poulos彈性理論引入對地下連續墻的沉降計算中;清華大學水利水電工程系濮家騮、于玉貞根據三軸試驗結果確定混凝土的參數,利用非線性e - b模型,結合黃河小浪底土石壩設計剖面,採用thepd土石壩總應力程序,對深覆蓋層塑性混凝土防滲墻的應力、位移進行有限元分析,並與普通混凝土防滲墻計算結果加以對比,同時分析了不同配比塑性混凝土特性的影響,並採用應力水平和拉應力數值來判斷塑性混凝土防滲墻的安全程度。
  16. Once the grouting technique being applied, diameter and length of pile can be decreased. pile ' s tip can be directly laid in gravel and construction work can be cut down, which means lower construction difficulties and less expenditure

    採用樁端壓力灌漿技術,可以減小樁徑、縮短樁長,將樁端位於卵石層或減少卵石層中工作量,從而降低施工難度,減少工程投入。
  17. The common work of pile - soil - structure is regarded to an entirety, and should meet the coordination condition on contact side each other

    樁-土-上部結構的共同作用是把三者看成一個整體,並要滿足相互之間在接觸部位的變形協調條件。
  18. More work need to do for a better case which approaches to an engineering pile or a good theory result

    如何更好地簡化以接近實際情況,或者通過數學簡化得到一個理論解,需要更進一步的工作。
  19. It is achieved the common work of pile - soil - structure on nsas by using nonlinear bars from single pile calculation as the structure boundaries. the results show that under some 3 - d loading conditions, significant error can be induced due to the nonlinear characteristic of pile, simply using a nonlinear spring from single pile calculation as the structure boundaries

    在三維受力狀態下,由於樁周土的非線性,迭加原理不再適合,而目前許多有限元程序只是簡單地把單樁計算得到樁頭等效非線性彈簧作為結構的邊界條件,這樣將導致出現比較大的偏差。
  20. Considering the difference of geological condition and construction condition, the thesis select the best form to save the money and make the work in security. a ) the pile support : according cantilever supporting pile, one - anchored supporting pile, the thesis compile a series of program with the method of criterion

    本文針對黃土地區懸臂支護樁、單層錨桿支護樁、土釘支護等不同的支護方案,優選了支護方法和結構形式,考慮了不同的地質條件和施工條件情況下,採用相應較合理的支護方案以達到安全可靠和經濟的目的。
分享友人