works and days 中文意思是什麼

works and days 解釋
工作與時日
  • works : 的印表機描述格式
  • and : n. 1. 附加條件。2. 〈常 pl. 〉附加細節。
  • days : 戴斯
  1. " he works so hard during practice, after practice and days off, " durant said

    「科比在訓練時總是很刻苦,訓練后就好好休息。 」杜蘭特說。
  2. Very often the jain scholars viz. poets and writers get their literary works initiated during the festival days and thus pay their homage to this grand festival

    耆那教修道者,即詩人和作家經常在盛典日獲得他們的文學作品,因此立誓效忠這個大盛典。
  3. On 17 february 1930, after 57 days of work, engineers succeeded in connecting kowloon and hong kong island with a cross - harbour submarine pipeline. by 23 february, the connection works between the submarine pipeline and the land mains, on both sides of the harbour, were also complete

    連接港九的輸水管直徑12寸,於1930年2月17日完成,由第一次將水管放入海底起計,共用了57個工作天,而連接沉管與陸地水管的工程亦在2月23日完工。
  4. Rises at 5 a. m. five - six days a week to get ready to paint in the studio and write ; works for about three hours a day

    一周大約5到6天早晨5點起床, (梳洗之後,吃點早餐,小誠自己瞎猜的,呵呵) ,去畫室繪畫或寫作,每天大約工作3小時。
  5. The company serves content around project early days, metaphase, later period each phase, cover earth to build, each major such as adornment, installation, municipal, gardens, traffic, irrigation works ; especially : service of representative of invite public bidding permeates reconnaissance, design, inspect manage, construction, equipment, material, purchase wait for each domain ; cost seeks advice use current the most advanced tsinghua si weier is three - dimensional system of software calculating an amount, control to the project executes the spot to be mirrorred in real time and undertaking cost dogs ; the adroitness in project management uses fidic term and conditions of contract, the mature construction on international project management pattern introduces in management of domestic construction project ; company of software of subordinate path be in harmony is with advanced science and technology rely on, foot of client of prep close behind leads the market, dedicated the development at project software, apply with promotion

    公司服務內容圍繞工程建設前期、中期、後期各階段,涵蓋土建、裝飾、安裝、市政、園林、交通、水利等各專業;特別是:招標代理服務滲透到勘察、設計、監理、施工、設備、材料、采購等各領域;造價咨詢採用當前最先進的清華斯維爾三維算量軟體系統,對工程實行現場實時反映並進行造價跟蹤控制;項目管理中熟練運用fidic合同條件,將國際上成熟的建設項目管理模式引入到國內建設項目管理中;下屬道融軟體公司以先進科技為依託,緊隨客戶步調引領市場,專注于工程建設軟體的開發、運用與推廣。
  6. Contractor completes works according to its requirements, and then client should arrange the works acceptance inspection within 7 days

    承包人按本合同完成本工程驗收要求的,發包人應在七天內組織本工程驗收。
  7. Contractor must begin the construction within 5 days after the contract signed and issue the completion work chart and completion data to client 30 days before the works acceptance, otherwise works will not be testified

    承包人必須在本合同簽定后5個工作日內開始建設,並在本工程驗收前30天將竣工圖、竣工資料交給發包人,否則不予驗收。
  8. I know thy works, and where thou dwellest, even where satan ' s seat is : and thou holdest fast my name, and hast not denied my faith, even in those days wherein antipas was my faithful martyr, who was slain among you, where satan dwelleth

    啟2 : 13我知道你的居所、就是有撒但座位之處當我忠心的見證人安提帕在你們中間、撒但所住的地方被殺之時、你還堅守我的名、沒有棄絕我的道。
  9. I ' ve experimented with different amounts and found six days a week works best for me

    我試驗過不同的運動量,發現一周運動六天對我的效果最好。
  10. Artistic works well with a two hen chicks together in the field, thus far days close range 1992, the eye could see, the sky goes wide, winding streams, gangluan ups and downs, the natural environment is very elegant, leighton is happy flap

    作品中精心巧雕一隻母雞帶著兩只小雞一起在田間遊玩,遠天近景歷歷在目,舉目望去,天高雲闊,溪流迂迴,崗巒起伏,自然環境十分幽雅,令人頓開心襟。
分享友人