works approval 中文意思是什麼

works approval 解釋
工廠認可
  • works : 的印表機描述格式
  • approval : n. 1. 贊成,同意。2. 批準;認可。
  1. His works won the enthusiastic approval of his readers.

    他的作品受到讀者的贊許。
  2. For construction or modification of any works enumerated above, a project institutor shall submit detailed plans, drawings, and descriptions for the authority - in - charge ’ s approval

    前項各款建造物之建造或改造,均應由興辦水利事業人備具詳細計畫圖樣及說明書,申請主管機關核準。
  3. When lmp or landscape proposal is approved by pland, the landscape works could be commenced on site, unless the planning condition or lease condition also requires approval to be obtained for tree felling or transplanting and such approval has not yet been obtained

    除非規劃許可附帶條件或批地條件要求申請人為砍伐樹木或移植樹木另行申請許可,而有關許可尚未獲得批給,否則當園景設計總圖或園景建議獲規劃署批準時,申請人即可在申請地點展開園景工程。
  4. In addition, the area surrounding a registered tree is designated as a tree protection zone, in which construction works cannot be carried out without the prior approval of the landsd

    此外,注冊樹木四周屬樹木保護區;除非事先徵得地政總署批準,否則不得在該等地方進行建築工程。
  5. In exceptional circumstances where approval is given for site formation works on a slope, the applicant will be required to employ an authorized personengineer to submit site formation plans to the building authority for approval

    在特殊的情況下,申請建屋的地點如獲批準在斜坡上進行地盤平整工程,申請人必須聘請認可人士或認可工程師,向建築事務監督提交地盤平整圖則請求批準。
  6. When the feasibility study report for flood control works or other hydraulic works and hydropower stat ions stipulated in the preceding paragraph is submitted for approval pursuant to the procedures set by the state for capital construction, a consent document for planning issued by the relevant water conservancy administrative department which conforms to the requirements of flood control planning should be enclosed as an appendix

    前款規定的防洪工程和其他水工程、水電站的可行性研究報告按照國家規定的基本建設程序報請批準時,應當附具有關水行政主管部門簽署的符合防洪規劃要求的規劃同意書。
  7. According to the original forecast, the government would have submitted 106 projects to the public works subcommittee ( pwsc ) and fc of this council for funding approval in the 2002 - 03 legislative session. however, owing to deviations between the actual and planned progress of certain projects, we have eventually submitted a total of 84 projects to this council, of which 76 were included in the original forecast while 8 were not

    政府在2002 - 03立法會會期,原本預算向立法會工務小組委員會及財務委員會提出106項工程的撥款要求,但由於有些工程項目的進展跟計劃中有出入,我們最終向立法會提交了原本預算中的76項及8項不在原本預算中的項目,合共84項撥款申請。
  8. The corporation is not involved in the process of approval application but will make sure that the completed works have the final consent of buildings department

    九鐵並沒有參與申請批核過程,但會確保所有完成的工程取得屋宇署的最後批準。
  9. The related works are managed by atkins china ltd, which is responsible for applying for approval of all drawings from buildings department

    有關工程由安建顧問公司負責管理,安建顧問公司須負責向屋宇署申請批核所有圖則。
  10. Subject to funding approval from the legislative council, works will be carried out between 2003 - 04 and 2004 - 05

    涉及的街市和熟食中心包括:香港仔街市及熟食中心
  11. Hunan ziqiang fire protection engineering co., ltd was founded in june of 1993 on the approval of hunan province public protection general brigade, as an institute member of china fire protection association and one of the first batch of six specialist providers of fire protection engineering works, zi qiang fire protection establishes and positions itself a second - tier national fire protection enterprise, delivering a wide range of services from installation, tuning, testing and maintenance of fire protection systems, to technical consultancy and sales of fire protection - related products

    湖南省自強消防工程有限公司成立於一九九三年六月,是經湖南省建設廳、湖南省公安消防總隊審批,集消防工程安裝、調試、維護、技術咨詢、產品銷售於一體的國家消防貳級企業,是湖南省最早成立的六家專業從事消防工程施工的企業之一,系中國消防協會團體會員單位。
  12. The relevant works department will keep the university safety and environment office useo and the university steering committee on environment usce informed of any approval obtained from the clec regarding the felling and compensation of trees of conservation value

    工程部門將通知大學安全及環境事務處( useo )及環境事務督導委員會( usce )有關clec對具保育價值樹木的砍伐及補償方案的任何批準。
  13. Any pond filling works or excavation works within the conservation zones, including " conservation areas ", " coastal protection areas " and " sites of special scientific interest ", in nearly all rural areas in the new territories must obtain the prior approval of the town planning board

    在大部份新界鄉郊的自然保育區、海岸保護區及具特殊科學價值地點等自然保育地帶內進行填塘或挖掘工程,均須事先取得城市規劃委員會批準方可進行。
  14. For large signboards not falling within the minor works scheme, approval and consent from the building authority are still required

    不納入小型工程計劃的大型招牌,仍須向建築事務監督取得批準及同意。
  15. Under the buildings ordinance, " building works " except for " exempted works " require the building authority s prior approval of plans and consent for commencement of works. it is therefore necessary for building professionals to be engaged for preparation and submission of the requisite plans

    根據建築物條例規定,除豁免工程外,建築工程在施工前必須把圖則送交建築事務監督批準及獲得同意施工圖則須由建築專業人士擬備及提交。
  16. If felling is absolutely unavoidable, the works department should seek, prior to the commencement of work, the approval of the campus landscaping enhancement committee clec which must be satisfied that the extent of destruction is already kept to a minimum and the proposed compensatory scheme adequate

    如砍伐是絕對不能避免的話,工程部門定要于工程展開前獲得校園景觀美化委員會( clec )的批準,證明已採取適當措施將工程的破壞減至最低,及提出適當的補償方案。
  17. Derivative works are not allowed unless prior written approval from cuhk has been obtained

    除非事先得到中大書面許可,訂戶不得利用網站上任何資料製作衍生作品。
  18. D revoking the central ozp or referring it to the tpb for reconsideration would trigger a new round of feasibility study, plan preparation, public consultation, detailed engineering design, funding approval and works authorization. with this delay and the associated uncertainties, the criii contract would have to be terminated

    D把中區大綱圖撤銷或發還城規會重新審議,便要展開新一輪的可行性研究圖則擬備工作公眾諮詢詳細工程設計撥款批準和工程核準等程序。
  19. Where the contract expressly provides that part of the permanent works shall be designed by the contractor, he shall submit to the engineer, for approval

    凡合同中明文規定應由承包設計部分永久工程時,承包商應將下列文件提交工程師批準
  20. I spoke earlier of the need to speed up and simplify the approval procedures for public works projects

    我剛才已講過需要縮短公共工程的審批時間,以及減省有關程序。
分享友人