worst-case analysis 中文意思是什麼

worst-case analysis 解釋
危重病例分析,失敗病例分析,診療失誤病歷分析
  • worst : adj 〈bad ill 的最高級〉 (opp best) 最壞的,最惡劣的;最厲害的,最猛烈的。n 最壞的事情[人、東西...
  • case : CASE =computer aided software engineering 【計算機】計算機輔助軟體工程。n 1 情況,狀況;真相。2 ...
  • analysis : n. (pl. -ses )1. 分解,分析;【數學】解析。2. 梗概,要略。3. 〈美國〉用精神分析法治療(= psychoanalysis)。
  1. Then, author introduces geometric nonlinear analysis theory, geometric nonlinear calculation theory during construction period, load position of live load considering geometric nonlinear and calculation theory of worst - case value, static time history theory for vehicle running, geometric nonlinear analysis theory of natural vibration and structural dynamic reaction and so on. all of these theories fit any appointed structure with corresponding programs. so a series of completed analysis approaches that cover all geometric nonlinear factors of bridge structure are formed

    其次,介紹了對任意指定結構的幾何非線性分析原理、施工階段幾何非線性計算原理、考慮幾何非線性的活載加載位置與最不利值的計算原理、車隊行駛靜力時程分析原理、非線性結構的自振特性和結構動力反應分析原理等,其中包含了相應的計算程序模塊的編制方法,形成了一整套考慮橋梁結構所有幾第日頁西南交通大學博士研究生學位論文何非線性因素的橋梁結構分析方法。
  2. Analysis shows that the dynamic range of stimulus current is the key direction of electrotactile research, the ideal stimulus current should be the set of many small element - group ' s ideal current sets, and each element ' s current should be set separately in the worst case

    模型分析認為,刺激電流的動態范圍是電觸覺研究的重要內容,最佳電流是若干觸點組最佳刺激電流的集合,極端情況下,各觸點的刺激電流須單獨進行設定。
  3. In chapterl, we introduce basic concepts about scheduling, the worst - case ratio analysis of approximation algorithms, stochastic scheduling problem and classes of stochastic scheduling policies

    我們在第一章中首先介紹排序問題的基本概念,排序演算法的性能分析,以及隨機性排序問題及其排序策略。
  4. The modules information is a useful way to get a " worst case " view of the footprint that s due to dlls, which you can further refine by more detailed analysis using other tools if necessary

    模塊信息是一種很有用的方式,提供了「最差情況下」由於dll造成的內存佔用,需要的話可以使用其他工具作更詳盡地分析。
  5. Used in conjunction with microsoft project ' s other pert analysis features to evaluate the worst - case duration, start date, and finish date of a task

    與microsoftproject的pert分析功能聯合使用,可以估計某項任務在最壞狀況下的工期、開始日期和完成日期。
  6. The worst - case response time analysis for distributed simulation task

    分散式模擬任務的最壞反應時間分析
  7. We introduce the basic notions of combinatorial optimization and worst - case analysis of algorithms in chapter 1

    文章首先介紹了組合優化的概貌,給出了近似演算法定義及其性能度量標準。
  8. In the rest of the thesis, we study approximation algorithms with their worst - case analysis for four different combinatorial optimization problems. in chapter 2, we consider the optimization versions of the 3 - partitioning and the kernel 3 - partitioning problems

    在第二章至第五章中,我們分別研究了四個組合優化問題的近似演算法,並給出了它們的性能分析。
  9. Second, we tackle a np - hard problem of scheduling jobs on a bank of parallel machines with the objective of minimizing the makespan, under the constraints of non - preemption and no precedence relationship. the worst - case analysis of fpsf ( fast processing speed first ) heuristic is discussed

    2 )研究并行加工系統對通過時間( makespan )的優化問題( pm | | cmax問題) ,提出了新的演算法,並對最壞情形作出了分析。
  10. The result of the performance analysis in two - dimension and multi - dimension shows that the scheme provides better worst case bounds about time and space complexity than what have existed, so the algorithm is more scalable and faster

    在推導成形smfq演算法的過程中,我們還修正了成形rps類演算法的worst - case指數,給出了有關結論的證明過程和結果。
  11. Then, considering cons and pros of ds and pm protocols, this thesis proposed a new task synchronization protocol called ds / pm protocol. this new protocol can solve part of problems in previouse two protocols. finally, this thesis proposed a task tranaction worst - case response time analysis algorithm for ds / pm protocol and made performance estimation for these algorithms

    其次,本文根據ds和pm方式各自的優缺點,提出了一種ds與pm方式相結合的ds pm任務同步控制方式,這種同步控制方式能部分彌補ds和pm方式的缺點,而後基於該方式提出了相應的任務序列最大響應時間分析演算法。
  12. In the schedulability analysis of such system, firstly we should account for the overhead of message communication between tasks. secondly, we should account for the influence of different task synchronization protocols to schedulability analysis algorithm. lastly, worst - case response time of all the tasks and messages in the system should be analyzed holisticly because they are inter - dependent

    首先,需要考慮任務間的消息通訊帶來的時間開銷;其次,需要考慮不同的任務同步控制方式對可調度性分析演算法以及任務模型造成的影響;最後,由於系統中任務和消息具有復雜的關聯關系,還要對系統中所有任務、消息的最大響應時間進行整體分析,從而得到任務序列的最大響應時間。
  13. Finally, this thesis proposed a message worst - case response time analysis algorithm for a simplified task model and made performance estimation for these algorithms. in the research of the second part, after a brief introduction of ds ( direct synchronization ) and pm ( phase modification ) task synchronization protocols, this thesis proposed the task transaction worst - case response time analysis algorithm respectively

    在第二部分的研究中,首先分別針對ds ( directsynchronization ) 、 pm ( phasemodification )兩種任務同步控制方式提出了相應的任務序列最大響應時間分析演算法,對原有演算法進行了改進,並按照holistic演算法的思想提出了相應的計算迭代方程組。
  14. Our research in this thesis is divided into two parts. in the first part, our main goal is to derive the overhead of messages communications in distributed real - time systems. in the second part, according to different task synchronization protocols, we derive task transaction worst - case response time analysis algorithms respectively

    第二部分是在綜合考慮各任務和消息的響應時間以及不同的任務同步控制方式的基礎上對任務序列的最大響應時間進行分析研究,並提出相應的分析演算法。
  15. The initial strain must be the optimum value obtained by multiple - trial method. 5. in the static analysis of the bridge model under live load, assuming a shifting concentrated load on the girder, analyzing the relation map of each section deflection and the location of the concentrated load, finishing the load - on of the worst - case live load, then the moment and deflection envelope diagrams of the girder were obtained

    成橋模型建立后,在後續活載作用下的靜力分析必須首先在主樑上作用移動集中荷載,分析主梁各斷面的活載撓度與集中荷載作用位置關系曲線圖,完成最不利活載的加載,從而最後得到懸索橋主梁的彎矩包絡圖及撓度包絡圖。
分享友人