zone area method 中文意思是什麼

zone area method 解釋
分區面積法
  • zone : n 1 【地理】(地)帶。2 區域,范圍,界。3 〈古、詩〉(腰)帶。4 圈,環帶。5 【數學】(球面)帶;...
  • area : n. 1. 面積;平地;地面。2. 空地;〈英國〉地下室前的空地。3. 地區,地方;〈比喻〉區域;范圍。
  • method : n 1 方法,方式;順序。2 (思想、言談上的)條理,規律,秩序。3 【生物學】分類法。4 〈M 〉【戲劇】...
  1. To do the investigating and studying work about the achievements of tackling key problem of the quondam exploration of front - zone of mountain, to analyze and study the applicability about the gathering technology used in the seismic exploration of the complicated construction belt of front - zone of mountainous ; 2. combining the quondam achievements, researching the design method of observation system objective of the complicated construction belt based on seismic - geology model, firstly, building the surface level and deep layer seismic - geology model of complicated construction belt and analyzing the forward model, secondly, designing the observation system aiming at the overthrust nappe structure in section and in area ; 3. aiming at the complicated earth ' s surface condition of front - zone of mountain, how to select the exciting method and the parameter, how to optimize the environment of exciting method and reception, how to pledge the normal combination of the datum of different exciting method ; 4

    根據山前帶的地震地質條件特點,本文主要研究了以下幾個方面的內容: 1 、對以往山前帶地震攻關成果開展調研工作,分析研究在山地山前復雜構造帶所採用的地震勘探採集技術的適用性; 2 、研究基於地震地質模型的復雜構造帶觀測系統目標設計方法:如何建立復雜構造帶的表層、深層地震地質模型,利用正演分析目標區的觀測系統;針對逆掩推覆體構造,如何分區分段有針對性設計觀測系統等; 3 、針對復雜地表條件的山地山前帶,如何選擇激發方式、參數,如何優選激發、接收環境,如何保證不同激發方式的資料能正常拼接; 4 、山前帶巨厚礫石區的表層結構調查技術及靜校正方法研究。
  2. Then, the half - carbonated zone ( transition zone ) phenomenon is mentioned and verified by way of using xrd & tg, thus giving contradictor of the existence between the half - carbonated zone and the premise of phenolphthalein test method - no existing obvious transition zone between carbonated area and non - carbonated area

    試驗結果證明:在混凝土碳化區和未碳化區之間存在著部分碳化區,而這一中間過渡區域的存在可能使得目前普遍採用的酚酞( phenolphthalein )試劑測定碳化深度的方法易產生誤差。
  3. Based on the results of experimental research, we can find that the construction method of joints zone are feasible and safe, the joints between concrete - filled steel tubular core columns and prestressed concrete beams have good ductility and good energy dissipation, and the concrete - filled steel tubular core columns can raise the shear strength of core area of joints and the bending strength of the column ends

    試驗研究發現,針對該節點所設計的構造處理方式是可行的、安全的,鋼管混凝土核心柱與預應力混凝土梁框架節點有著很好的延性和能量耗散能力,由於柱為鋼管混凝土核心柱,大大提高了節點核心區的抗剪承載力,同時也使柱端抗彎承載力得到加強。
  4. But there are still no reports about the relationships of dnpi - like and gabaergic immunoreactive ( gad - li ) terminals with pag - like immunoreactive ( pag - li ) neurons in " zone - shaped area ". to answer these questions, we observed systemically the synaptic connections among the pv - like immunoreactive neurons, fibers and terminals and the connections between dnpi - like, gabaergic terminals and pag - li neurons using the methods of electron microscopic imrnunohistochemistry, triple - immunofluorescence histochemistry and retrograde tracing method combined with pre - embeded immunoelectron microscopic double - labeled technique

    但是目前對新發現的囊泡膜mu轉運體一dnn樣陽性終末與帶狀區內pag樣陽性神經元之間ej關系,以及谷氨酸脫發酶( gad ,是gaba能神經元和終末的特異性標識物)是否參與其調控作用,尚缺乏系統的形態學資料。
  5. However, it lacks runoff data in absolutely most areas where culvert and small bridge locate. some traditional design method, such as the methods of statistic zone parameter, modification by catchment area, rainfall - runoff, reasoning formula and empiric equation et al, are used to estimate flood flow through culvert or bridge

    然而,絕大多數中小橋涵所在地卻沒有可利用的徑流資料,通常採用統計分區法,面積改正法、暴雨徑流法、推理公式和經驗公式等傳統設計方法,這些方法一般比較繁瑣、精度較低、設計的流量偏大,導致工程造價偏高而浪費資金。
  6. Based on the pratice and study of ecoturism planning of the wanglang nature reserves and south area of taibai mountain, the thesis established the system of content, method and levels of the ecotourism planning through comparative analysis of actual examples of ecotourism planning, which started to study from the typical ecotourism nature preservation zone, and then the thesis analysed the factors of ecotourism development and looked to the future of the ecotourism in china

    通過對比、分析,結合我國的生態旅遊開發規劃實際情況,從開展生態旅遊具有代表性的領域? ?自然保護區出發,以王郎自然保護區生態旅遊規劃、南太白山生態保護與旅遊發展規劃作為研究實踐,系統思想、辯證唯物主義觀點貫穿于研究始末,構建了生態旅遊規劃的內容體系及編制方法、編制層次。
  7. Take middle - east district of taipusi banner as study area in the paper, combining field observation test ( pumping test and field survey ) with indoor experiment ( granule analysis and organic matter analysis etc ), based on the relationship between hydrological parameters and physical - chemistry characteristic parameters of formation, the variability of aquifer parameters and physical - chemistry parameters of unsaturated zone have been also analyzed. the aquifer system of the taipusi banner is identified and analyzed by using the internal and outside information. on the basis of real pumping of ground water, the water resources evaluated by the water balance method

    本文以太僕寺旗中東部地區為研究區域,採用野外試驗(抽水試驗、實地調查)和室內實驗(顆分、有機質等實驗)相結合的方法,推求了研究區含水層系統的水文水利參數,在系統模擬含水層水理參數與巖性物理化學特徵參數之間的關系基礎上,進一步分析了含水層參數及其包氣帶的物理、化學特徵參數的空間變化特徵,並利用其內外部信息對太僕寺旗含水層系統進行了辯識與分析;以現狀地下水開采量為依據,採用水均衡法評價了研究區水資源總量,並利用有限單元法來模擬分析驗證。
  8. The choice dam type is especial importance, during the designed research of the rock - fill dam, particular under the rock - fill dam with very deeply cover layer, the stress and strain of the middle wall and cutting interpenetration wall of the dam foundation is mostly sensitive, whether the. design of dam is scientific and reasonable, it is very important for cutting interpenetration and stability of the dam, the article offer the reference for the design of cutting interpenetration in the foundation with deep cover with earth the water conservancy in xiaban zone, based on the study and analysis the design of cutting seep in the foundation with deep cover with earth, cutting interpenetration concrete wall and the joining model of cutting interpenetration material in body of dam and the applying effect in the practical worko based on the foundation which absorbed and summarize the achievement of design and research in the inter and outer country, for the project of the clay vertical middle wall and vertical cutting interpenetration, the asphalt concrete vertical middle wall and vertical cutting interpenetration the clay inclined middle wall and the lever carpet layer cutting interpenetration, respectively in terms of the different stage of complete period sluice period and working condition, adopting nonlinear calculate and analysis with the finite element method ; carrying the analysis and study with the 3d finite element method as to the different joining model of the left bank high slope cutting interpenetration body and the foundation concert cutting interpenetration wall ; carrying the analysis and study with the 3d finite element method as to the effect of the wall stress and strain because of the different elasticity modulus of the concert cutting interpenetration wall through the analysis and study with the different project. have comparatively all - around comprehended the various model dam, particular the distribute rule of stress and strain of the cutting interpenetration system, provide for the important evidence of the plastic area size the join model of the foundation cutting interpenetrate wall and dam body cutting interpenetrate system the choice of the dam model and the design of the structure of the dam body, the result of research and advice have very importance value in design and building for the similarity project

    工程設計中,壩型的選取顯得尤為重要,特別對于壩基有深厚覆蓋層的堆石壩,心墻和壩基防滲墻的應力和變形是壩體、壩基最敏感的部位,設計方案是否安全、科學和合理,對大壩防滲和穩定起到至觀重要的作用。本文研究分析了國內外深厚覆蓋層基礎防滲設計、壩基混凝土防滲墻與壩體防滲體銜接形式及工程實際應用效果,為下坂地水利樞紐工程深厚覆蓋層基礎防滲設計的方案選擇提供了參考;在吸收和歸納了國內外堆石壩的設計研究成果的基礎上,對粘土心墻和壩基垂直防滲方案、瀝青混凝土心墻和壩基垂直防滲方案以及粘土斜心墻和壩基水平鋪蓋防滲方案,分別按竣工期和蓄水運行期的不同工作情況進行了有限元非線性計算分析;對左岸高陡邊坡的大壩防滲體與基礎混凝土防滲墻的不同結合型式進行了三維有限元靜力計算分析和研究;對混凝土防滲墻不同彈性模量對墻體應力和變位的影響進行了三維有限元靜力計算分析和研究。通過對不同方案的計算分析和研究,比較全面的了解了各方案壩體,尤其是防滲體的應力和變形分佈規律,為壩型選擇、壩體結構設計、基礎防滲墻與壩體防滲體的結合型式以及塑性區大小的確定提供了重要依據。
  9. Abstract : because the shenfu - dongsheng mine area is located in intermediate of arid and semiarid zone, its ecological environment is very fragile. based on the fragileeco - environmental, the coal mining and construction have brought out some new environmental problems. man - made debris flow problems is the most serious of them which caused by coal mining, construction of railway and highway as wellas exploiting stone. through a great deal of experiments of artificial simulation setting water rushing to two types of slope debris flow and debris flow gully in shenfu - dongsheng mine site, the characteristics is favourable to formation of debris flow ; ( 2 ) the waste gangue is easy to initiate and is main solid material of debris flow in this area ; ( 3 ) the whole debris flow process could be observed through the model simulation experiment of debris flow gully. at present, this experiment method is the best way to analyze debris flow genesis and process

    文摘:神府東勝礦區位於黃土高原北部乾旱半乾旱過度地帶,由於煤田的大量開采,誘發了大量的環境問題,尤以人為泥石流最為嚴重.本文以神府-東勝礦區人為泥石流為研究對象,採用人工放水沖刷模擬實驗的方法,分析了坡面型和溝谷型泥石流源地鬆散體起動、產沙、泥石流過程的特性,所得結論為: ( 1 )放水歷時長、強度大,有利於泥石流的形成; ( 2 )棄土石渣易起動,是該區泥石流固體物質的主體; ( 3 )溝道型泥石流放水沖刷模擬實驗,便於觀測泥石流的全過程,坡面型泥石流放水沖刷模擬實驗,利於統計產沙、觀測侵蝕形態
  10. Because the shenfu - dongsheng mine area is located in intermediate of arid and semiarid zone, its ecological environment is very fragile. based on the fragileeco - environmental, the coal mining and construction have brought out some new environmental problems. man - made debris flow problems is the most serious of them which caused by coal mining, construction of railway and highway as wellas exploiting stone. through a great deal of experiments of artificial simulation setting water rushing to two types of slope debris flow and debris flow gully in shenfu - dongsheng mine site, the characteristics is favourable to formation of debris flow ; ( 2 ) the waste gangue is easy to initiate and is main solid material of debris flow in this area ; ( 3 ) the whole debris flow process could be observed through the model simulation experiment of debris flow gully. at present, this experiment method is the best way to analyze debris flow genesis and process

    神府東勝礦區位於黃土高原北部乾旱半乾旱過度地帶,由於煤田的大量開采,誘發了大量的環境問題,尤以人為泥石流最為嚴重.本文以神府-東勝礦區人為泥石流為研究對象,採用人工放水沖刷模擬實驗的方法,分析了坡面型和溝谷型泥石流源地鬆散體起動、產沙、泥石流過程的特性,所得結論為: ( 1 )放水歷時長、強度大,有利於泥石流的形成; ( 2 )棄土石渣易起動,是該區泥石流固體物質的主體; ( 3 )溝道型泥石流放水沖刷模擬實驗,便於觀測泥石流的全過程,坡面型泥石流放水沖刷模擬實驗,利於統計產沙、觀測侵蝕形態
  11. In this dissertation, area geology background, engineering geology condition and mechanism of deformation - destruction of the landslide are adequately analyzed, and finite element method is applied to analyzing the landslide stability in the study area, then changes of stress field, displacement field, plasticity destruction zone and stability coefficient contour are discussed

    論文充分分析了巫山縣四道溝滑坡的區域地質背景、工程地質狀況,系統分析了滑坡的變形破壞機理,採用有限元法進行了滑坡穩定性分析,討論了在各種工程情況下的應力場、位移場、塑性破壞區以及穩定性系數等值線圖的變化情況。
分享友人