位置水頭 的英文怎麼說

中文拼音 [wèizhìshuǐtóu]
位置水頭 英文
level head
  • : Ⅰ名詞1 (所在或所佔的地方) place; location 2 (職位; 地位) position; post; status 3 (特指皇帝...
  • : 動詞1. (擱; 放) place; put; lay 2. (設立; 布置) set up; establish; arrange; fix up 3. (購置) buy; purchase
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • 水頭 : waterhead; head; flood peak水頭落差 head fall; 水頭坡降 water table gradient
  1. The sailor went fore to see that the sail was properly in place.

    手走到船看帆是否已在正確的上。
  2. Water samples are taken regularly throughout the entire supply and distribution system. the sampling points include water treatment works, service reservoirs, trunk mains, connection points and domestic taps. the data from these samples are checked against the world health organization s guidelines for drinking - water quality, which were developed by experts from around the world

    在整個供及輸系統中,有關人員經常從濾廠、配庫、輸干管、供接駁和用戶抽取樣本進行化驗,鑒定化驗數據所顯示的質是否符合世界?生組織所訂定的飲用食質準則。
  3. One day, all prisoners went out to work, just left myself at the room for sick leave, i filled water in my can container, just reached the position that i got porridge in ordinary times, and then poured into his washbowl

    有一次,趁全組的人都出工,只有我一個人留在號子里休病假時,我把我的罐筒盛上面剛好達到我平時打的稀飯的,然後再倒到他的面盆里。
  4. Abstract : a research on theory and practice is conducted on the acoustic methods of discharge measurement in low head hydropower plant. taken hydraulic efficiency experiment in certain hydropower plant as examples, the general methods about how to locate the discharge measurement plane, install transducers and choose the integration methods are put forward. an improvement method is proposed finally

    文摘:從理論上和實踐上,對低電站超聲波測流進行了較為詳細的研究,並以某電站為例,對測流斷面定、聲路布和面積積分給出了一般方法
  5. This study made a conclusion ? amely in order to realize following the geological target while drilling, on the basis of making a better geological and drilling design for horizontal well, we must make full use of mwd, lwd and integrate logging to carry out lithfacy identifying in real time, the lwd interpretation and formation evaluation, to set up geological model of target formation, to select geosteering marked formation and compare simulative curves with lwd curves f to fix on the drilling direction of bit upper and declination, the position in target oil - gas layer, to revise borehole track in real time, to make it extend in reservoir better interval as possible

    研究認為,在做好平井地質設計和鉆井設計的基礎上,要實現隨鉆跟蹤地質目標鉆井,必須充分利用隨鉆測量、隨鉆測井和錄井等資料,從實時巖性識別、隨鉆測井解釋和地層評價、目標層地質模型建立、導向標志層的選取及模擬曲線對比等方面入手,確定鉆上下傾鉆進方向及在目標層中的,以實時調整井眼軌跡,使其盡可能在儲層物性較好的部延伸。
  6. This paper, based on normalizing well logging data while drilling and correcting depth into true vertical depth and calculating reservoir parameters and etc, combining the practical ease of mobei oilfield, extracted logging and geological pattern characteristic of target oil - gas formation and geosteering mark formation, and used bp neural network and regressive analysis to create predicting mode of geosteering parameter to build relevant contrast curve ; adopted geometry geosteering method to fix on die drilling direction of bit upper and declination, the position in reservoir, to judge the real drilling case. all finely solved the problem to follow the geological target while drilling for three horizontal well these methods improve the drilling horizontal well ability by using the techniques to follow the geological target while drilling, and then it is convenient and practicable

    本文在開展隨鉆測井資料的標準化和斜井校正及儲層參數解釋與含流體性質判釋等工作的基礎上,結合研究工區莫北油田的實際情況,提取了目標油(氣)層和導向標志層的測井地質模式特徵,並採用bp神經網路法和回歸分析法建立了地質導向參數的預測模型、構造了相應的對比曲線;採用幾何導向法確定鉆上下傾鉆進方向及其在目標層的,以判斷實際鉆進地層情況,很好地解決了研究工區三口平井的隨鉆跟蹤地質目標的問題。
  7. ( 4 ) through the hydraulic property experiment of micro - hole lateral pipes of simple sdi in air, it was found that the average pressure of 60 mitre length lateral pipes was at the position of per 40o / o ~ ~ ~ 50 % of the effectual pipe length from the fist micro - hole, major pressure - loss was occurred at the ahead part of half pipe. the pressure uniformity reduced with orifice aperture ? increasing, and the relationship between pressure uniformity and initial water pressure was poor. running under the initial water pressure of 1. 5 meter, the discharge uniformity reduced with orifice aperture ? increasing, and when the orifice aperture smaller than or equal 1. 0mm, irrigation uniformity could achieve above 0. 6

    ( 3 )通過對空氣介質中簡易地下滴灌的微孔毛管試驗研究發現: 60m管長的毛管平均壓力基本上在距第一孔口的有效管長40 - 45的地方;大部分損失發生在毛管的前半部分;壓力均勻度隨孔徑的增大而減小,但與初始工作關系不密切;在1 . 5m以下的工作壓力下運行,沿程出流均勻度隨孔徑的增大而降低,當孔徑不大於1 . 0mm時,灌均勻度可以達到60以上;當孔徑大於等於1 . 2mm時,灌均勻度低於50 。
  8. Raised when alert, on level with the top of the skull

    當警戒時,耳朵提高,可到
  9. Located in gailanxi of jiangbei district, huayu is close to jiangbei international airport to the east, yangtze river dock to the south, railway station to the west and chongqing changan automobile corp to the north with superior geographical location and convenient traffic condition

    華宇公司於重慶市江北區溉瀾溪,東鄰江北機場,南靠長江碼,西近火車站,北與重慶長安汽車股份公司接壤,地理十分優越,陸交通十分便利。
  10. The scheme embraces four projects, namely ( 1 ) to build up sluices at anqiu bridge and nanzhou bridge ( and the one at anqiu bridge is the first choice ) so that pollutants can be from entering the lake ; 2 ) as a necessary accessory for the above project, to supplement water capacity from changdang lake as a strategic water source into the protection program, and culvert - pipe plan is recommended from two other alternatives through systematic analysis ; 3 ) to carry out comprehensive realignment for some reed regions which are located at the entrances of the lake, and to develop a wetland ecosystem mainly with some reeds ; and 4 ) to set up a green protection belt right round the lake, including planting reeds at lakebeach, building forest belt, developing bases of green foodstuff and disposing sludges in the lake base

    該方案由4個工程子系統組成, ( 1 )截污工程:在岸丘橋和南州橋各築一節制閘(而岸丘橋工程又是首選工程) ,以封住湖泊兩入流,杜絕污染物進入源地的截污工程; ( 2 )引工程:是截污工程的配套工程,利用下游長蕩湖來補充量,並對3個引工程設想進行了系統分析,推薦涵管方案,同時將長蕩湖作為該市戰略源地一併納入保護體系中; ( 3 )濕地生態處理工程:對進入蕩區前的蘆葦區進行綜合整治,發展以蘆葦為主的濕地生態處理工程; ( 4 )環湖綠色自然保護帶工程:包括建設圍湖蘆葦蕩、環湖林帶、綠色食品基地以及污泥處
  11. In case of a vertical veseel tested horizontally in the shop, the test pressure shall relate to the design pressure adjusted for static head when the unit is in the vertical position

    5如果立式容器在車間進行平測試,測試壓力應相對設計壓力進行調整,當裝在立式時調整靜封
  12. We attracted insect pests with common 20w black light which was used by pest control services, adjusting insect pests " posture by running water, installed color camera at proper position, and designed illuminating system so that we could obtain distinct insect pest image. finally, insect pest image was inputted into the computer by color image acquisition card

    採用植保站常用的20w黑光燈誘集害蟲,設計裝使害蟲落入流動的中,藉此調整害蟲的姿態;選擇合適的,安裝彩色攝像,並設計照明系統,盡可能保證獲得的害蟲圖像清晰;經彩色圖像採集卡將害蟲圖像輸入計算機。
  13. Now i seem to have hit a sweet spot ( slightly left of center ) where the bhs are hitting with the fps on a left / right plane at 20 and 30yds

    現在么,我』 』似乎』 』發現了這個很妙的搭箭點(平衡中心略微偏左) ,從這個發射的刀片箭,在20和30碼的距離,還能平分佈在子彈箭的左右兩側,可是
  14. Based on the analysis and research on the stability of larynx, several methods to solve the instability of larynx were raised, in hope of helping the singers to protect their voice and improve their singing quality

    文章通過對喉穩定問題的分析研究,總結了幾種解決喉不穩定的訓練方法,為保護歌唱者的嗓音和提高歌唱者的歌唱平提供一些理論方面的指導。
  15. The result show that the position of free surface is higher because of frusta of brake, especial obvious in the head of frusta of brake ; flux coefficient and pressure on dam are quite influenced by type of frusta and 3 a type frusta of brake relative to 2 type frusta of brake has bigger flux coefficient and smaller pressure on dam ; obvious influence of ability of discharge flow for different ratio of thickness of frusta and breadth of brake and pressure on dam reduces with increasing ration of thickness of frusta and breadth of brake, while bigger flux coefficient is obtained when tlb = 0. 2

    結果表明,閘墩河海大學博士論文的存在抬高了面線的,其中在閘墩部尤其明顯;墩型對流量系數和壩面壓力影響較大, 3a型閘墩相對於2型閘墩具有更大的流量系數和更小的壩面壓力:不同的墩厚閘寬比t / b對泄流能力也將產生顯著的影響,隨著墩厚閘寬比的增加,壩面壓力降低,而當t / b二0 . 2時溢流壩具有更大的流量系數。
  16. The key factors affecting the stagnation point position of l - type pipeline section are the setting position of bellows type expansion joint and the bend angle degree

    影響平轉角管段駐點的主要因素為波紋管補償器設、彎角度。
  17. The calculation of stagnation point position of straight pipeline section with both movable ends and l - type pipeline section with bend at one end and bellows type expansion joint at other end is discussed

    摘要探討了兩側為活動端的直管段及一側活動端為彎,而另一側活動端為波紋管補償器的平轉角管段駐點的計算。
  18. The outlet bend and water inlet connections, as well as the threaded rods to mount the plumbing facilities, are fastened at the right places, so they will stay firmly in place until final assembly

    廁具彎連接件以及所需的各類連接螺桿均牢固的固定在合理的上,從而保證了它們在整個安裝過程中均能固定在合理的上。
  19. Based on the principle of hydraulics, the general equation for head loss and the formula for calculation of pressure head along the flexible hoses were worked out, and the method for determination of the maximum and minimum heads and their positions was given

    摘要根據力學原理建立了軟管沿程損失的一般方程,得出了軟管沿程壓力的計算公式,給出了確定最大和最小壓力及大小的方法,從計算結果與試驗實測結果的對比看,具有一定的合理性。
  20. The selection of impoundment level and dam site, the general layout, the design optimization of structures, construction diversion and construction period all are the important context of the design of hydropower station across river with low head

    選擇、壩址選擇、樞紐布、建築物設計優化、施工導流與工期等是低河床式電站設計的重要內容。
分享友人