停轉負荷 的英文怎麼說

中文拼音 [tíngzhuǎn]
停轉負荷 英文
stalling load
  • : Ⅰ動詞1 (停止) stop; halt; cease; pause 2 (停留) stay; remain; stop off [over]: 船在錨地停了一...
  • : 轉構詞成分。
  • : Ⅰ名詞1 (負擔) burden; load 2 (虧損) loss 3 (失敗) defeat Ⅱ動詞1 [書面語] (背) carry on th...
  • : 荷名詞(蓮) lotus
  • 負荷 : [電學] load; charge; weight
  1. Accurate load forecasting is helpful to planning generators " starting and stopping in the interior of the electrical networks economically and reasonably, preserving the security and stability of power system, reducing the unnecessary circumvolving repertory capacity, making planning to overhaul the units in reason, ensuring the normal production and life of the society, effectively reducing the cost of generating electricity, increasing the economical and social benefit

    電力預測是供電部門的重要工作之一,準確的預測,可以經濟合理地安排電網內部發電機的啟,保持電網運行的安全穩定性,減少不必要的旋儲備容量,合理安排機組檢修計劃,保證社會的正常生產和生活,有效地降低發電成本,提高經濟效益和社會效益。
  2. The paper analyzes the non - lineal relations of the quantity of heat exchange and water flux of coil exchanger in part - load operating condition, the shortage of deciding the water flux in bypass pipe, the disadvantage that the operating condition of pumps and chiller ca n ' t be met with the load change of the air conditioning system in different operating condition of using pressure - difference bypassing control in primary water pump system. using load control method in the change of the operating condition of primary water pump system can realize that the load change is small and reasonable in the on / off condition of pumps and m m chiller by comparing load control method in primary variable - flow water pump system with pressure - difference bypassing control method, back water temperature control method

    本論文從目前空調工程中使用的變流量水系統入手,研究了盤管換熱器在部分下水流量與換熱量的非線性關系,分析了文獻中介紹的旁通管通流能力選擇的不足之處和一次泵水系統採用壓差旁通控制時,工況換不能滿足系統控制要求的缺陷;比較了一次泵變流量水系統中壓差旁通控製法、回水溫度控製法、控製法的精確性,並得出了在一次泵水系統的工況換時,採用控製法能使冷水機組及其相應水泵在啟時的變化范圍較小,更符合建築物的冷量需求,節能效果較好的結論。
  3. This paper introduce the features of a kind of electric heating atmospheric boiler which is of high efficiency on energy transferring, non - pollution, starting and stopping quickly, wider range of load adjusting, simple body structure, etc. in addition the paper introduce the design idea briefly

    電加熱鍋爐具有能量化效率高、零污染、起速度快、調節范圍大、本體結構簡單等特點,文章具體介紹了一種常壓熱水電鍋爐的設計。
  4. Thermal stress control system actually gather the real - time data of unit sets , compute temperature fields , stress fields and maximum dangerous stress by the math modal , decide target and speedup rotation in every stage of startup process , and justify automatically to realize auto control a serial of processes of turbine , such as speedup , warm - up , connecting net , load changing , stop and unsteady condition etc , and improve automatic level of the unit sets. turbine auto startup ( tas ) system can automatically evaluate steam turbine ' s startup and load changing process according to thermal stress of

    熱應力控制系統實際是對機組運行參數進行實時採集與監控,通過數學模型實時地計算高、中壓缸子的溫度場、應力場分佈,以及最危險熱應力,以確定啟動過程各階段的目標數及升速率,並進行自動調整,實現機組沖、升速、暖機、並網、升機以及異常工況下的自動控制,大大提高了機組的自動化水平。
  5. The pressure existing between the guide vane and the runner when the pump - turbine of east china tongbai pumped storage power station stops at different loads is analyzed, and the method for determining the best load at which the generator circuit breaker ( gcb ) switches off during operation of the pump - turbine is illuminated

    摘要介紹華東桐柏抽水蓄能電站的水泵運行時,不同工況下機、導葉和輪間壓力的變化,闡述了華東桐柏抽水蓄能電站1號機組發電機斷路器開斷的最佳值選定。
  6. The practical situations of system operations are considered in this paper. based on the enumeration of the cut sets for the load point interruption, load transition character, maintenance of devices, active failure mode and overload of transmission line are all discussed

    該方法考慮了系統運行的實際情況,列舉引起電事件割集,還考慮了點供電的移特性,網路元件的計劃檢修和主動性故障使評估過程更加合理和有效。
  7. This thesis discussed the affection of all kinds of components contingency and the components " position in the line and other factors on the evaluation of load point reliability index. this thesis adopts a integrative method to deal with simple or complex distribution network with the system ' s practical operation characteristics and the results of the example reveal that it is feasible. the key to study the economics of power system reliability is outage costs

    在定量評估點或系統可靠性指標的研究中,本文較全面地分析了各元件故障和元件在線路中的位置以及計劃檢修、臨時電、天氣因素、移等因素對估算點可靠性指標的影響;研究了現有的可靠性評估模型,結合城市電網的實際運行特點,採用一種綜合的方法估算輻射型電網的可靠性指標,算例結果表明它是有效可行的。
  8. It put out the system requirements from the whole structure, function structure, developing mode, user management, the design of software and database, safety design, system running efficiency, developing plan, etc. it put out the basic graphics operation, the module building and editing of the electrical network, the devices records and function management the devices operating management, the function producing the electrical subject chart, the outside interface function, the in - out function and webgis, etc. it discusses some advanced functions including the theory loss and practical loss computing of the distribution line, the reliability basic data producing and conversing tools, power cut management, the load supplying from other ways, the repairing management on user fault reports, th e new load installing assistant function, the management of hanging the cards and simulating operation, the monitonng and analyzing management of the running information, load monitoring and load density analyzing function and so on

    從系統總體結構,功能結構,開發模式,用戶管理,軟體和數據庫設計,安全性設計,系統運行效率,開發計劃等方面滿足了系統的總體要求;系統實現了基本圖形操作,電網建模與編輯,設備臺帳及運行管理,設備操作運行管理,電力專題圖生成,外部介面,輸入輸出, web - gis等基本功能;系統還具有配電線路理論線損計算及實際線損計算,可靠性基礎數據生成和數據換工具,電管理,供功能,用戶報修管理,用戶報裝輔助,掛牌管理和模擬操作,運行信息分析監控管理,監控及密度分析等高級功能:並能從運行方式,用戶權限,運行日誌三個方面闡述本系統的管理方式。系統總體結構合理,功能及介面齊全,配置擴展方便,可操作性強。
  9. Loads for every bearing, rotary speed, bearing saddle vibration, shaft vibration, orbit of shaft center, were measured. severely rubbing fault was diagnosed by comprehensively analyzing these signals. the diagnosis results have a good agreement with situation

    測得了各支承特性、軸的速、軸承座振動、軸的振動、軸心軌跡等數據信號,綜合分析了信號特徵,判定為嚴重碰摩故障,與機檢查實際情況相當吻合。
  10. The practical situations of system operations are considered in this paper. based on the enumeration of the cut sets for the load point interruption, load transition character, maintenance of devices, active failure mode and overload of transmission line are all discussed. the evaluation is more realistic and effective

    該方法充分考慮了系統運行的實際情況,在列舉引起點供電止事件割集的基礎上還考慮了點供電的移特性,網路元件的計劃檢修和活動性故障,以及系統運行的過約束等諸多情況,使評估過程更加合理和有效。
分享友人