側壁導洞法 的英文怎麼說

中文拼音 [zhāidǎodòng]
側壁導洞法 英文
side heading method
  • : 側形容詞[方言] (傾斜; 不正) slant; sloping
  • : 名詞1 (墻) wall (of a house etc ) : 銅墻鐵壁 bastion of iron2 (作用像圍墻的部分) wall of st...
  • : 動詞1. (引導) lead; guide 2. (傳導) transmit; conduct 3. (開導) instruct; teach; give guidance to
  • : Ⅰ名詞(物體上穿通的或凹入較深的部分; 窟窿; 洞穴) hole; cavity Ⅱ形容詞(深遠; 透徹) profound; thorough; clear
  • : Ⅰ名詞1 (由國家制定或認可的行為規則的總稱) law 2 (方法; 方式) way; method; mode; means 3 (標...
  1. The paper introduces the progress and the statue quo of tunnel portal construction, discusses the condition to employ full face method, bench cut method, single side heading method and double sides heading method of portal construction, points out advantages and disadvantages of these methods. the order to adopt these methods of single track, double track and tri - track tunnel in shallow - depth, uneven pressure and incompact ground is also advised after compare

    討論了全斷面、臺階、單和雙在隧道口段施工中的使用條件和優缺點,對這四種施工方從各個方面進行了比選,提出了單線、雙線和三線隧道的口段處于淺埋、偏壓、鬆散的地層中時各種施工方選擇的先後順序。
  2. Based on the numerical simulation, it can be concluded that the three heading construction method with the tunnel close to the mountain tunneled first should be chosen in the construction of the multi - arch loess tunnel

    計算結果表明對于偏壓黃土連拱隨道應採用先開挖靠山一側壁導洞法進行施工。
  3. Considering the actual condition of this tunnel, several key mechanical problems involved in the construction of the tunnel have been studied : the comparison of three - heading construction method and benching tunneling method, and the construction sequence of the two tunnels is carried out

    本文結合該工程實際,進行黃土連拱隧道的關鍵施工力學問題研究:正上下臺階側壁導洞法施工方案比較研究;先左(靠山一)施工方案和先右施工方案的對比。