削石坡 的英文怎麼說
中文拼音 [xiāodànpō]
削石坡
英文
rock cut slope-
There are some disadvantages on traditional construction method of the transition material 2b on upstream face of concrete face rockfill dam, i. e. overtopping, slope - cutting and incline compaction
混凝土面板堆石壩上游坡面傳統的墊層料超填、削坡、斜坡碾壓的施工方法存在許多弊端。By the phenomenon came from critical sand - gravel granular mixtures slope experiment, the falling causation, form, scale, and preventing principal in sliding - sand slope were discussed. the causation can be drawn : the slope received sands from the slope top continuously ; non - uniform degree and granular size in strong weathering environment may be changing ; and the restrain in slope foot was weakened. these factors, cause the fal
結合乾燥沙石臨界單面坡實驗現象觀察,對溜砂坡災害的產生原因、崩塌特性及防治原則進行了討論,提出溜砂坡崩塌的三個主要成因:寒凍風化引起上部沙粒來源的持續不斷;坡面的風化作用使顆粒進一步均勻、細化,造成原來處于亞臨界而穩定的坡面達到臨界而容易失穩;坡腳對牽引式崩塌的制衡作用削弱,易受坡腳干擾而誘發。5. for frozen erosion the good measure is to cut slop and lining with coarse gravel ; meanwhile, adjust the canal operating to less the frozen
( 5 )對于凍融和凍脹較為嚴重的渠段則宜採用削坡后鋪碎石護岸;為減輕凍融侵蝕,同時採取適當的調度方式。In this paper the friction piles are used in zipingpu multi - purpose dam construction project, the spillway in the side slope is covered with overburden, the horizontal area is from sp. 0 + 200m to sp. 0 + 280m, the elevation is about from el. 810m to el. 950m, there is hard and integral rock under the overburden, which provides enough anchor ability, and it ' s requirement to set the friction pile at the appropriate place ; in order to improve the slope stability that suitable excavation or weeding off the disadvantage load on the landslide are good measures, for the scarp it ' s better to reduce the slope
摘要紫坪鋪水利樞紐工程溢洪道樁號0 + 200 ~ 0 + 280 、高程810 ~ 950m范圍的內側邊坡為覆蓋層邊坡,坡體下部有較為完整堅硬的巖石,具備提供足夠錨固力的條件,在適當的位置可以考慮設置抗滑樁,再通過適量的開挖提高邊坡穩定性,或將滑坡體上部不利於穩定的荷載挖除,對于陡坡的坡面可以將坡削緩,則效果會更好。In operation construction of retaining wall in san sang san
位於鰲?石建造工程中的削土斜坡Slope cutting and soil nail construction
位於鰲?石的削土斜坡工程Formation of cut slope at ngau hom shek
在鰲?石興建中的削土斜坡分享友人