北水道 的英文怎麼說
中文拼音 [běishuǐdào]
北水道
英文
norder aue-
Morning drive through toward westward of france and arrive in avignon, en - route we have photo stop at pont du gard admire the roman aqueduct, a monumental feut of engineering completed in the year 19 b. c
早餐后北上,經過令人稱奇獨特的嘉賀渠,橫跨在加頓河上半哩長的古羅馬引水道,歷經過二千年至今依然絲毫無損。The section of the unnamed access road leading to tai lam chung catchwater from its junction with the unnamed access road leading to la casetta uno to a
通往大欖涌引水道的未命名通路由其與通往綠庭園的未命名通路的交界處起,至同一交界以北約Though the water levels cross one section are almost equal, the velocities differ greatly. at the some cross - section, the velocity in the in the quirk may be double as that on the floodplain. the water surface will rise hi the southern branch because of the improper diffluence ratio, if using the designed diffluence col
淮河入海水道河口段水位值橫向分佈相差無幾,而流速的橫向變化較大,泓灘平均流速差最大可達一倍以上,在現有的分流口設計條件下,若按設計的南北汊分流比,南分流口有壅水現象發生,如果南汊分流增大到800m ~ 3 / s左右時,則水流較為通暢。Near the north wall 2 brick - made ditches were uncovered, beside them was a ceramic pipe, all of which was thought to be part of a sewerage system
近北墻處出現兩條磚造溝槽狀結構,一旁有陶管狀物,可能屬排水道系統。Abstract : monthly rainfall data from 1951 to 1995 for june, july and august in 13 meteorological stations of the north china were used for accounting z index and discussing serious flood and drought featureas in these months. serious flood mainly happened in july and august, and sevious drought mainly happened in august. there were more flood in 1950 ' s to 1960 ' s and more drought since 1970 ' s in the north china. meanwhile, the deeper trough which covered the regions from the ural mts. to the balkhash lake play an important role in serious rainstom in rainy season in the north china. there often happened serious flood ( drought ) when the northwester pacific subtropical high was by west and north ( east and south ), and the sea surface temperature in the equatorial central and eastern pacific was mainly in dropping ( raising ) stage
文摘:利用華北平原地區的13個站點, 45年( 1951 1995 )的降水資料,對夏季4個時段( 6月、 7月、 8月、 6 8月)進行了z指數計算,確定了該地區各個時段的嚴重澇年和嚴重旱年.發現華北地區雨季的嚴重洪澇主要集中在7 , 8月,嚴重乾旱則主要發生在8月,並可明顯看出由50 60年代的多水期向70年代中期以後的少水期的轉變,另外,烏拉爾山到巴爾喀什湖附近的低壓槽加深和西北太平洋副熱帶高壓的北抬,對華北地區雨季持續性暴雨的產生起著決定性的作用.嚴重洪澇年的夏季( 6 8月) ,西北太平洋副熱帶高壓偏西、偏北,赤道東太平洋海溫多處于下降階段;嚴重乾旱年西北太平洋副高偏東、偏南,赤道東太平洋海溫則處于上升階段The zushui rake caves of taoism in yichang city hubei province
湖北宜昌沮水道教石窟群初探Seasonal variations of water vapor transport over east asia monsoon region are studied, especially that in summer season. the results indicate that there are four vapor inflow corridors to fetch china : southwest corridor, south china sea corridor, southeast corridor and northwest corridor. it shows impact of south asia monsoon, south china sea monsoon, subtropical monsoon and middle latitude westerly belt on summer rainfall anomaly over china, respectively
分析了東亞季風區水汽輸送的季節變化,並著重研究了夏季東亞季風區的水汽輸送特徵,指出夏季東亞季風區水汽輸送有四條通道到達中國大陸:西南通道、南海通道、東南通道和西北通道,分別體現了南亞季風、南海季風、副熱帶季風和中緯度西風帶對中國夏季降水的影響。Jiangsu taizhou seal washing equipment manufacturing co ; ltd. is located at hometown of mei - lanfang who is a master of peking opera. it faces the yangtzeriver renowned as the " golden river " in the south, borders subei plain of " a land of fish and rice ", adjoins nangtong in the east, and neighbors yangzhou in the west. ningqi railway, ningtong expressway, ningyan expressway across the city. with the completion of taizhou - jiangyin yangtze river bridge, the city is closely linked to other cities
江蘇省泰州市飛翔海豹洗滌機械製造有限公司地處京劇大師梅蘭芳的故鄉? ?泰州鳳凰墩上,南臨「黃金水道」的長江之濱,北倚「魚米之鄉」的蘇北平原,東、西與南通、揚州毗鄰,寧啟鐵路、寧通高速、江陰長江大橋經本市境內,交通便利。Temporary closure of the section of tong shui road southbound between marble road and king s road, north point
臨時封閉北角糖水道介乎馬寶道與英皇道之間的一段南行The catchwaters that were built in association with the reservoir reached shan shek wan in the east, from shui hou to pui o via cheung sha and tong fuk in the south, to tai o and the stretch of mountains in the west, and tung chung in the north
配合水塘而建的引水道,東至散石灣,南自水口起經長沙、塘福至貝澳,西至大澳、羌山一帶,北達東涌。The newest cultivation techniques for good quality rice in hokkaido of japan
日本北海道最新水稻施肥技術Chun yeung street area including north point road, tong shui road, a section of king s road around kam hong street, and fortress hill mtr exits
春秧街一帶,包括北角道糖水道琴行街附近的一段英皇道,以及炮臺山地鐵站出口Owing to the falling of concrete from the external walls of a building at 91a chun yeung street, a section of chun yeung street between north point road and tong shui road was temporarily closed to traffic. motorists are urged to take heed of traffic signs at the scene and instructions by traffic police
由於春秧街九十一號a一座大廈外墻的石屎剝落,介乎北角道至糖水道之間的一段春秧街需要暫時封閉。駕駛人士請遵照現場標志及交通警員的指示。Speaking at a ceremony to mark the completion of works on the main drainage channels for river indus, river beas and river sutlej, the director of territory development, mr wong hung - kin, said today ( september 17 ) that the works for these three rivers in the river indus basin were sizable and entailed the straightening and widening of some 9km of existing meandering rivers with raised river embankments. the works also included the re - provisioning of existing facilities that were affected by the projects such as the reconstruction of 12 river - crossing bridges
拓展署署長黃鴻堅今日(九月十七日)在梧桐河、雙魚河及石上河主要排水道工程竣工典禮上致辭時表示,整項梧桐河盆地的治河工程涉及上述三條位於新界北區的主要河道,規模龐大,新河道總長約9公里,將原來迂迴曲折的河道拉直及擴闊,並且將河堤加高及重置受工程影響的原有設施,包括12條過河橋梁。The nil alignment is dictated by the airport railway extended overrun tunnel to the west, the water channel of the hong kong convention and exhibition centre hkcec the foundations of which were specifically designed for this purpose and the existing fortress hill station to the east
地鐵北港島線的定線受到多項限制,包括西部必須連接機場鐵路掉頭隧道伸延段,香港會議展覽中心會展的水道其地基是特別為此而設計,而東部則必須連接現有的炮臺山站。Hotel nikko new century beijing is located along the famous xizhimen street. it is near the canal that the emperor used when going to the summer palace from the inner city. along the water - way you will find many royal gardens such as the leshan garden beijing zoo, the wuta tower, the wanshou tower, and the purple bamboo park
北京新世紀日航飯店坐落於北京西直門外,它比鄰明清兩代帝王由市內通往頤和園的水道,故而其周邊保留了諸多皇家名苑:如樂善園北京動物園五塔寺萬壽寺福蔭紫竹院等。It extends from the lead mine pass in the north, to the catchwater of the shing mun reservoir in the south, and from tai mo shan in the west, to grassy hill and needle hill in the east
城門郊野公園佔地共1 , 400公頃,由北面的鉛礦凹伸展至南面的城門引水道,西至大帽山,東及草山、針山。Based on swmm ( storm water management model ), a typical urban region is selected to calculate the status under the design storms with different frequencies in the region, such as drainage effect and water - logging, overland flow on road etc., and simultaneously, the storm floods under different conditions, including reforming the protruding green belts into plain or concave ones, placing flood storage areas etc., are simulated with the evaluation on their effects
摘要以swmm為基礎,選取北京市典型小區,計算不同頻率設計暴雨下小區排水效果以及積水、道路坡面流等情況,同時進行不同情景下的暴雨洪水模擬並評價其影響,包括改凸式綠地為平式和凹式、設置蓄洪區等。Restriction on entry and departure : all vessels may pass through the north channel, and the vessels of less than 3000 gross tonnage or vessels with drafts less than 7 meters may also pass through the east channel when entering or leaving this port
進出港限制:一切中外籍船舶均可經北水道進出煙臺港; 3000總噸以下或吃水小於7米的船舶亦可經東水道進出煙臺港。New territories west development civil engineering - land development - tsing yi development - remaining works new territories west development transport - roads - flyover across castle peak road at sha tsui road
新界北部發展土木工程-排水道及防止侵蝕工程-元朗排水繞道1996年11月5日分享友人