受載量 的英文怎麼說

中文拼音 [shòuzǎiliáng]
受載量 英文
dwc deadweight capacity
  • : 載Ⅰ名詞(年) year : 一年半載 six to twelve months; six months to a year; 三年五載 three to five ...
  • : 量動1. (度量) measure 2. (估量) estimate; size up
  1. In this paper, using the program ( epagpll ), the bored testing pile group of the chinese architecture science and research institute at luokou area are analysised. the comparisons among analytical results of four constitutive models of soil are made, and the deformation of piles and soil, the soil resistance of the piles, the friction beneath cap, the aclinic displacement of the ground soil before piles and the failure pattern of pile group are discussed in detail

    本文利用所編的程序,對上海地區豎向荷作用下的單樁的流變效應進行了分析,並通過樁體位移?時間關系曲線,確定軟土地基上豎直力樁的承力,分析了豎直力樁的最終沉降的大小,並結合《上海地區地基基礎》地方規范就程序計算結果進行了對比。
  2. Newcastle disease virus ( ndv ) strain 695, a thermostable nature avirulent strain, were replicated in embryonated chicken eggsand its rna was extracted from allantoic fluid. referred to the reported sequence of f gene, a pair of primers were designed and synthesized. f gene of ndv b95 strain was amplified by rt - pcr, the pcr products were checked by agrose gel electrophoresis and purified by agrose gel fracion method

    利用從國外引進的新城疫熱穩定性天然弱毒b _ ( 95 )株接種spf雞胚繁殖病毒,經處理后提取病毒的基因組rna ,參考國內外發表的ndv融合蛋白基因序列,設計一對特異性引物,經反轉錄聚合酶鏈式反應( rt - pcr )擴增出約1700bp大小的特異性片段,將此片段回收純化后,利用t - a克隆技術將其克隆到pgem - t - easy克隆體中,再轉化大腸桿菌jm109感態細胞,轉化后經分子比較、 pcr鑒定和酶切分析篩選陽性克隆。
  3. Compared with traditional mechanical and optic gyros, hrg has such advantages as no high speed circumvolving or moving parts in structure, no warm - up time and short start - up time, wide signal band in frequency, low excursion noises, great endurance in over loading, nuclear radiation and short time power off, small bulk, light weight, low power cost and long life, which is suitable for space applications

    與傳統的機械陀螺和光學陀螺相比,半球諧振陀螺具有如下優勢:結構上無高速轉子、無活動部件;不需預熱,啟動時間短;信號頻帶寬,漂移噪聲低;能承大的機動過;抗核輻射,並可經短時間電源中斷的影響;體積小,重輕,功耗低,壽命長,非常適合空間應用。
  4. Degenerate oligonucleotides to highly conserved regions of cucumis melo 1 - aminocyclopropane - 1 - carboxylic acid ( acc ) oxidase gene were used to prime the amplification of fragment of 128bp by ploymerase chain reaction ( pcr ) in samples of genomic dna from fruit of cucumis melo l. cv hetao flesh, which was cloned into plasmid vector pmd - 18 - t. the clon of antisense orientation were selected, and it was inserted downstream of camv35s promoter and enhancer " " of tmv into the plant expression vector pbinyxw, antisence expression vector pbinya was constructed. at the base that pollination and fertilization of cucumis melo l. cv hetao was studied, using pollen tube pathway transformate cucumis melo l. cv hetao, 76 fruit had been obtained, moreover, hardness and content of sugar were analysed

    本實驗以河套蜜瓜果肉基因組dna為模板,用甜瓜acc氧化酶基因特異寡核苷酸鏈為引物進行pcr擴增,得到128bp的擴增產物。將得到的擴增產物克隆到質粒體pmd - 18 - t上,篩選反向克隆,然後將其反向構建到植物表達體pbinyxw的camv35s啟動子和tmv增強子「 」的下游,構建成反義表達體pbinya 。並在對河套蜜瓜授粉精生物學研究的基礎上,通過花粉管通道法轉化河套蜜瓜,共獲76顆瓜,並進行了硬度和含糖的分析。
  5. It provides strong basement for the research of design. the method of structure analysis commended by this paper is based on nonlinear finite - element, diathermanous and elasticity mechanics. it found the model of a steel beam pressed by gravity and temperature in the condition of indoor fire

    本文提出的結構分析法是在大參數分析的基礎上,以非線性有限元、傳熱學及彈性力學為基礎,利用ansys軟體,建立一個鋼框架梁在室內局部火災條件下的傳熱模型與在重力荷及溫度荷共同作用下的力模型。
  6. It ’ s often used to cover the special target in special area or is used to make false attacking situation. these small light and cheap jamming devices always are thrown to the area near the target. they are manipulated or not to jam the foe ’ s military electronic device such as radar and radio etc. the device weighs about one kilogram and is as big as mauley

    分散式干擾是在無人機機和氣球干擾機等形式上發展起來的電子對抗設備,通常是為了掩護特定區域的目標或在某一地區內製造假的進攻態勢,將眾多體積小、質輕、價格便宜的小型干擾源散布在接近被干擾目標的空域、地域上,自動地或控地對選定的軍事電子設備進行干擾。
  7. Based on the close analysis of the influence factors of the vertical bearing capacity, circular aperture extension theory is employed to establish the computing formulas for the pile vertical stress and the foundation vertical bearing capacity, respectively. moreover, with analyzing the features of the calculation parameters such as materials of gunite mortar, jet pressure, diameter of the jet pipe, pile length, pile layout, a design theory for chemical churning pile composite foundation is proposed. then, the variation of the pipe deformation with loads, the deformation coordination of pile and soil are studied

    在此基礎上深入探討了旋噴樁的樁土力特性及其復合地基的加固機理,從影響旋噴樁復合地基豎向承力的因素入手,基於圓孔擴張理論給出了樁體豎向應力及旋噴樁復合地基的豎向承力計算公式;通過對噴射漿液、噴射壓力選取、噴射直徑估算、樁長及樁位設計等各種計算參數的深入分析和研究,提出了一套相應的旋噴樁復合地基設計計算方法;通過計算分析,深入探討了旋噴樁復合地基變形隨荷變化規律、樁和樁間土變形協調關系、樁土應力比及復合地基壓縮模的確定,並提出相應的設計方法和修正參數;此外,結合工程應用,對旋噴樁復合地基的施工技術及其現場質檢測方法進行了較全面的探討。
  8. By the large quantity of indoor and field soil mechanics test, this paper investigated physics and mechanics property of xigeda stratum and xigeda compounding filling, profoundly and systematically studied on shearing strength, cbr ( including indoor cbr and field cbr ) and intensity feature of xigeda compounding filling. the new achievement and cognition as follows : ( 1 ) cbr value is decided by moisture content and mudstone content of xigeda compounding filling. the filling material can satisfy minimum intensity standard of express highway when mudstone content is less than some fixed value, ( 2 ) this paper established field cbr standard value which can synthetically evaluate the filling material nature and field compaction degree. ( 3 ) the optimal compacting mean of xigeda compounding filling is hard oscillation first and weak oscillation later, not traditional way which is weak oscillation first and hard oscillation later. ( 4 ) this paper put forward the conception of optimum moisture content in construction different from optimum moisture content of indoor impaction

    本文以昔格達填料強度特徵為研究對象,通過大的室內及現場試驗,從昔格達地層巖組的物理力學性質、昔格達填料的物理性質入手,對昔格達填料的抗剪強度、室內承比及現場承比特徵進行了較系統地研究,獲得了如下認識及進展:昔格達混合填料承比值填料含水及其中泥巖含的影響,當泥巖含小於一定值時,昔格達混合填料具有較高的承比值,能夠滿足高速公路對填料的最低強度要求;建立了綜合評判昔格達填料性能及現場壓實效果的現場承比( cbr )標準;對于昔格達填料而言,最佳的碾壓方式為先強振后弱振而不是傳統的先弱振后強振;提出了與室內擊實最優含水相區別的施工最佳含水的概念。
  9. Article 93 a voyage charter party shall mainly contain, interalia, name of the shipowner, name of the charterer, name and nationality of the ship, its bale or grain capacity, description of the goods to be loaded, port of loading, port of destination, laydays, time for loading and discharge, payment of freight, demurrage, dispatch and other relevant matters

    第九十三條航次租船合同的內容,主要包括出租人和承租人的名稱、船名、船籍、貨重、容積、貨名、裝貨港和目的港、期限、裝卸期限、運、滯期費、速遣費以及其他有關事項。
  10. Because uav is smaller and lighter than normal plane, the miniature aerial rs system is easily effected by wind, its " stabilities of position and stance are not good. because the load of uav is so finite, the large professional aerial photogrammetry camera can not be installed

    微型無人機遙感由於到無人機平臺體積小、重輕、任務荷有限等因素的制約,在飛行作業中傳感器位置和姿態氣流影響大、穩定性差,而且目前是非專業攝影機成像,這些都大大增加了其影像幾何糾正處理的復雜性。
  11. This metric can help you calculate how many clients your server can handle under a peak load

    這個度指標可以幫助你計算在峰值負下,服務器能夠接多少客戶。
  12. Based on extensive investigation of construction technique history of chinese ancient buildings, the structure method, structure developing history and seismic behavior of chinese ancient timber structure buildings are analyzed in several respects of the structural system and form. through a series of experiments on constituent parts of chinese ancient timber building structure, including the tests on the corbels and brackets called dougong subjected to low cyclic reversed loadings, the tests on the wooden frame using the tenon - mortise joints as connections of column and beam subjected to low cyclic reversed loadings, the tests on vibration isolation effect of friction and slippage between column footing and their socle base, and a series of shaking table tests on a chinese ancient timber structure palace building mode under artificial earthquake at serving conditions, destroyed conditions and reinforced conditions, many valuable results of structures such as moment - curvature hysteretic loops of dougong structure and tenon - mortise joints under low cyckc reversed loadings, the static function, the seismic performance, energy dissipation, vibration reduction, energy - loss mechanism, nechanicalmode and failure mode were studied. aplenty of valuable parameters of the structure system were obtained, such as the natural period of structure, vibration modes, damping ratio, factor of vibration isolation, oscillate amplitude of ineitial accebration, velocity and displacement, magnitude of slippage, and the mechanism of structure failure and collapse etc. based on these research, the complete analysis of ancient timber structure under earthquake were carried out in which including mechanism analysis method, calculating mode, strength analysis of members and joints, strengthening methods for serving damaged ancient timber structure buildings were also taken into account

    依照宋代《營造法式》建造了抬梁式殿堂木結構構件及結構模型,對中國古代木結構中的典型構造如:柱腳在礎石頂面平擱簡支、柱架榫卯連接、柱高不越間之廣、側腳、生起、斗拱等的構造機理及結構功能進行了化分析和實驗研究: (一)通過木柱石礎靜摩擦試驗,測定了柱腳與石礎古鏡面間的摩擦系數及摩擦力隨上部結構荷變化的規律; (二)通過單柱承力試驗,測定了古建築中木柱的力變形特徵、破壞模式、及模型材料的變形模、極限承力、極限變形等參; (三)通過柱架低周反復荷試驗,測定了柱架的抗側移剛度、柱架恢復力特性及滯回曲線、榫卯張角剛度及其變化規律、柱架及榫卯的極限承力和極限變形、及榫卯減振參數; (四)通過斗?低周反復荷試驗和壓試驗,測定了古建築木構件與木構件間摩擦系數,斗?抗側移剛度,斗?恢復力特性及滯回曲線,斗?抗壓極限承力及力變形規律; (五)通過抬梁式殿堂間架模型振動臺試驗,測定了殿堂木構架結構自振周期,地震反應振形、阻尼特性及阻尼比;按結構分層特點對柱腳、柱頭和斗?層上的屋蓋的地震反應採用多點同步測,對柱根滑移、榫卯變形、斗?的變形、復位、耗能減振參數等進行了定分析。
  13. Standard test method for quantitative sporicidal three - step method to determine sporicidal efficacy of liquids, liquid sprays, and vapor or gases on contaminated carrier surfaces

    污染的體表面測定液體噴液蒸氣或氣體的殺孢子效率的定殺孢子三步法的標準試驗方法
  14. 2 ) the structure elements should be laid out symmetrically and uniformly when designing steeve - arch structure, what ' s more, the reasonable selection of section geometric size near the arch foots of first beams is paid attention to and the arrangement difficulties of steel bar due to the big eccentric pressures 2, the analyses of anti - seismic features on transverse direction of the aqueduct l ) the method of adjusting the elements " mass can be harnessed in order to even the layout of seismic loads

    2 )設計吊桿式拱架支承結構時,各部分構件應當均勻對稱布置。另外,還應注意頭道梁拱腳附近截面的尺寸擬定,克服地震內力造成的大偏心壓狀態給結構配筋設計增加的困難。 2 、橫槽向抗震性能分析1 )可利用調整構件質的方法,使得結構的某些構件的地震荷分佈均勻一些。
  15. Taken the bank spillway at yubeishan reservoir as an example, the water loads acted on the spillway, such as static water pressure, dynamic water pressure, shear stress on the surface of the step and so on, are calculated, which can provide evidence to the stability analysis of the dam slope and slope protection

    並以萬縣魚背山水庫岸邊溢洪道為例,計算了溢洪道上所的水流荷及其分佈,為土石壩坡和護面的穩定分析提供了依據。通過計算證實了既使在較大的單寬流下,緩坡上的階梯仍有較高的消能率。
  16. It has shown by the uncertainty of the data of fatigue experimentation and the size deviation of machine accessory and structure component and the original defect of materials that all of the stress and intensity and the factors that affect them are stochastic variables, so we should deal with the problem of fatigue by the method of probability and statistics to making the engineering life deduced by fatigue intensity to be the reliable life under a certain probability

    疲勞試驗數據的離散性,零件和構件加工允許的尺寸偏差,材料中分佈的原始缺陷,以及零件危險部位應力響應的分佈特性等,都說明應力和強度以及影響它們的因素都是隨機變,它們有各自的分佈形式,應該用概率統計理論和方法來處理,才能使疲勞強度在工程中所確定的壽命,成為保證某一概率下的可靠壽命。
  17. Desktop weather is the world ' s most popular online download of the largest in the entire chinese desktop weather forecasting software

    桌面天氣秀是全球最歡迎、下最大的全中文桌面天氣預報軟體。
  18. With the development of the modern industries, the applications of the low speed and heavy load rolling bearings have being more and more extensive

    低速重滾動軸承是一種承大、工作轉速低的特種滾動軸承,並且運行中承較大沖擊荷。
  19. Moreover, when the filaments are treated for 12 minutes, the interfacial shear stress will be lower than that treated for 6 minutes. izod pendulum is used to test the influence of the fiber / matrix bond strength on the low velocity impact responses of the composites. the curves of energy - time, force - time and velocity - time are obtained by a data acquisition system

    用擺錘低速沖擊儀對界面粘結強度不同的材料進行沖擊試驗,藉助數據採集系統得到沖擊過程中材料吸收的總能、承荷、擺錘速度等參數與時間的關系曲線,並通過pc機處理,將荷?時間曲線轉化為荷?位移曲線。
  20. You should cable us the vessel name, estimated loading period, loading capacity, contract number, shipping agent to us 12 days before loading time

    你方應在船隻期12天前將船名、預計期、裝、合同號、船舶代理人電報告知我們。
分享友人