吊裝工具 的英文怎麼說
中文拼音 [diàozhuānggōngjù]
吊裝工具
英文
tool for lifting-
At present the main products of company have : courtyard the light, ceiling lamp, last light, foot of a wall the the lights, light not under water, ceiling lamp, hanging overhead light, half a ceiling lamp, wall lamp, light, desk lamp, desk lamp, floor lamp, energy - conservation light, emergency light, sodium light, mirror headlight, putting out mosquito s light, searchlight, dampproof light, street lamp, wooden light, crystal light, shot - light, cow hide light, sheepskin light, cloud stone light, stone skill light, copper light, shelf light, etc.
大至酒店賓館的燈飾照明工程,小到家庭裝飾的照明燈具。目前公司主要燈飾系列產品有:庭院燈吸頂燈地插燈墻腳燈水下燈吊燈吊頂燈半吊燈壁燈燈臺燈桌燈落地燈節能燈應急燈鈉燈鏡前燈滅蚊燈探照燈防潮燈路燈木燈水晶燈射燈牛皮燈羊皮燈雲石燈石藝燈銅燈架子燈等。The metal cellular sandwich board, being the most advanced, novel - style and top - grade fire - proofing architectural material both internationally and domestically at present, can be used for standard high - quality architecturally integrated ceiling and partition decoration, etc
金屬蜂窩夾芯板是目前國際、國內最先進行的新穎高級建築防火材料,用於標準的高質量建築一體化吊頂及隔斷裝飾等,它具有美觀、輕質、高強、隔聲、隔熱、防潮、不燃、表面不起塵、幾何尺寸準確,組合性強、施工快捷、方便等優點。Main business products : plastic ' s spring rope, mobile rope, mobile chain, mobile ' s accesories, mobile convenience nip, mobile wipe, key ring, hand ring, eva sunbonnet, fishing rope, key hang brand which is extensively be used in mobile, stationery, fishing tackle, fitness equipment, hardware tool, dress ' accessory, gambling house ' s chip and all sorts of promotion gifts, advertisement ' s gifts
專業生產:塑料彈簧,塑膠彈簧,玩具彈弓線,塑料鑰匙鏈,鑰匙扣,浴室手環,手圈,手機彈簧繩,手機掛鏈,手機繩,手機吊繩,手機飾品,手機配件,鑰匙吊牌,漁具失守繩,文具臺筆,健身器材彈簧配件,五金工具彈簧配件,出口服裝的塑料彈簧配件,賭場籌碼掛鏈,以及促銷禮品,廣告禮品等塑膠類擠出產品及配件Abstract : based on practice, this paper introduced the construction technique of long - span liting and assembling for large - span archy rib refabricated in section, which is a good reference to prefabricate lifting and assembling archy rib with multiple arches and multiple sections
文摘:結合工程實例,探討了大跨度分段預制吊裝拱肋施工工藝,對多孔多段預制纜索吊裝拱肋施工具有參考價值。Abstract : in view of, in the modification and maintenance of petro - chemical unit, the limited working space and inability of available hoisting equipment to meet hoisting installation requirements, a simple and reliable hoisting tool used is introduced taking account of the construction conditions
文摘:在石油化工裝置大型設備的技術改造和檢修作業中,針對現場施工空間小、現有吊裝設備無法滿足施工要求的情況,介紹了因地制宜設置簡單可靠的吊裝機具,完成吊裝作業的方法?門架旋轉作業法的成功應用。The common construction methods, technological characteristics and requirements are summarized, which includes high altitude construction in bulk, assemble, segment by segment, integral assembly, integral propping up, whole installation and sliding construction
論述了大跨度鋼結構的一般施工方法、工藝特點及施工技術要點與難點,具體包括高空散裝法、分條或分塊安裝法、整體提升法、整體頂升法、整體吊裝法及滑移法。Secondly, calculation theory of construction for suspension bridge is presented under the ideal condition of dead load design. linetype change stiffness of cable and slip stiffness of supporting points are deduced based on segmental catenary theory. then numerical analysis method through sgkz2000 software are introduced in detail about calculating design linetype for suspension bridge, unstressed length of cable, erection linetype of cable and pre - displacement of saddle without loads, erection linetype of wire strands, the fixed position for erecting cable band and linetype of lifting stiffening girders
其次,根據懸索橋恆載設計理想狀態建立了懸索橋施工計算原理;以分段懸鏈線索理論為基礎,推導了懸索的線形變化剛度和懸索支點的滑移剛度;介紹了懸索橋成橋設計線形計算、吊索無應力長度計算、空纜線形與預偏量計算、絲股架設線形計算、索夾安裝位置計算和加勁梁吊裝線形計算的具體方法、數值演算法及軟體sgkz2000的計算模塊的實現。Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating
箱梁製造由鋼筋工程、模板工程、混凝土工程、預應力工程、移存梁工程、孔道壓漿工程、梁體封端工程、橋面防水層和保護層工程等施工環節組成。文中介紹的採用胎具製作和綁扎鋼筋,分底腹板和頂板分別綁扎並吊裝鋼筋骨架入模;拆裝式和液壓式兩種模板的設計、製作要求和使用方法;綜合考慮、優化混凝土配合比,混凝土灌注從兩端至中間、先底板、后腹板、再頂板的施工順序和斜向分段、腹板水平分層、附著式振搗為主、插入式搗固為輔的施工工藝,蒸汽養護的方法和規定;應力應變雙控制確保預應力施工質量的施工技術;採用重物移運器有效移梁的施工方法;壓漿、封端、橋面防水層和保護層施工的一些規定和注意事項等都是對箱梁製造行之有效的施工技術和施工方法,並可為以後類似施工作借鑒。Application : in loading and unloading, the lifter can hoist iron steel block, cylinders and others onto magnetic materials for linkage or connection. it is very convenient for application in loading, unloading, and moving. pmqzq permanent magnetic lifters are the most ideal lifting facility for factories, docks, warehouses and transportation
起重器主要在吊裝過程中,對塊狀圓柱形及其它部件導磁性材料工件的連接,對裝卸搬運十分方便,是工廠碼頭倉庫交通運輸各行業的最理想吊裝工具。Application : in loading and unloading, the lifter can hoist iron / steel blocks, cylinder and others onto magnetic materials for linkage or connection. it is very convenient for application in loading, unloading, and moving, permanent magnetic lifters are the most ideal lifting facility for factories, docks, warehouses and transportation
起重器主要在吊裝過程中,對塊狀、圓柱其它部件導磁性材料工件的聯接,對裝卸、搬運十分方便,是工廠、碼頭、倉庫、交通運輸各行業的最理想吊裝工具。In order to find the lifting & installing technology for semi - circular structures adaptable to the poor construction condition and high installation intensity of this project, this paper summarizes common marine lifting and installing technology for large & heavy members and puts forward a new marine installation technology using crane barges according to the structural characteristics of semi - circular structures and working conditions of this project, which has obtained many achievements of innovation in lifting point design, sling design, water filling for settling and marine positioning technologies
為尋求適應本工程施工條件差、安裝強度高等特點的半圓體水上弔安工藝,在總結一般水運施工大型構件水上弔安工藝的基礎上,根據半圓體結構特點和本工程工況條件,提出了起重船水上安裝工藝,在吊點設計、吊具設計、灌水助沉工藝及水上定位工藝方面取得了多項創新成果。This method overcomes the difficulty of conveying heavy hoisting equipment, shortens construction period, raises working efficiency, and saves construction costs
該方法既解決了大型起重吊裝設備調遷困難的問題,同時又可縮短施工工期,提高工作效率,節約施工成本,對類似工程施工具有借鑒意義。Using crane to hoist and construct bridge is characteristic of simple in constructional machines, easy in operation, low in cost, short in construction time, safety and good quality
摘要採用起重機吊裝預制梁,具有施工機具簡單、易於操作、成本低、工期短、質量安全易於保證等優點。The main business of our company includes : wood packaging of mechanic equipment, mould, precise apparatus and industrial art products, exported fumigation - free packages, design and manufacturing of anti - shock, dampness - proof, rust proof and vacuum packages, logistics accessory services including packaging, lifting, loading and dismantling
公司的主要業務有:機械設備、模具、精密儀器、工藝美術品的原木包裝、出口免熏蒸包裝、防震、防潮防銹真空包裝的設計、製造、打包、吊裝、裝櫃、拆箱等物流包裝配套服務,特別擅長于模具產品的包裝服務。The paper describes the main techniques in the integral sliding construction for large span structure, which includes jacking scheme, plan layout, assembly, transport and stacking of components, setting of sliding system, setting of track, conformation of falsework, traction facility etc. discusses emphatically the sliding falsework, which includes the material, conformation, manufacture, welding and assembling of the shape steel tape falsework
系統分析了大跨度鋼桁架胎架整體滑移施工中的起重吊裝機具的選擇與布置、施工平面布置、桁架結構拼裝單元及滑移單元劃分、滑移施工方案及工藝流程、桁架的連接、拼裝運輸、及堆放、滑移軌道布置、滑移滾輪構造、延伸平臺布置以及滑移牽引系統等諸多工藝問題。Cutting chamber can be replaced rapidly without other auxiliary tools but lifting equipments
切割室可快速更換,除起吊裝置外,更換切割室無須使用其它工具。Step 3 : complete the bury of all anchors and connection of construction equipment & slings according to figure 3 : plan layout for lifting and figure 4 : elevation layout for lifting
第三步:依據圖三:吊裝平面布置圖、圖四:吊裝立面布置圖,完成所有錨點的埋設和施工機索具的連接。Taking the derrick hoisting as an example and using the programming tool. visual c + +, the applications of computer - aided calculation & analysis for hoisting work in construction have been discussed in this thesis, which is based on computer simulation and timing control
本論文從起重吊裝作業過程的計算機模擬角度出發,引入適時控制的思想,利用visualc + +可視化編程工具,以較先進的推舉法為例來探討起重吊裝作業過程中的計算機輔助計算與分析在建設工程中的運用。Use it together with c - clamp tw 35504 on the car, or with your hydraulic press
用途:吊壞鐵套杯士拆裝工具,請看參考圖片。In this paper, basted on the sum - up and investigation of simulation calculation of long - span bridge construction in nation and international, the detailed approach of imitated calculation of long - span cfst arch bridge is given out, and the reason why the general backward analysis is not suitable for the application of the rib - hoisting of cfst arch bridge is analyzed. and an applied method for forward analysis based on iterative theory is put forward
本論文通過對國內外橋梁施工模擬計算成果的總結和研究,給出了大跨度鋼管混凝土拱橋模擬計算的具體步驟,分析了一般的倒退模擬計算方法不適合應用於鋼管混凝土拱橋吊裝的原因,並為此提出了基於迭代理論的前進分析實用方法。分享友人